Loading...
ST8402-CS 890912DATE: BY: September 12, 1989 Larry Davis, Public Works Construction Inspector DENTON TAP ROAD PRO~ECT DENTON TAP ROAD - NORTH (North of Sandy Lake Road) Pavement Markings Metal Guard Rail on both sides of Bridge Channel shaping around and under Bridge Slope work along Park painting Bridge & Rail Electrical for Bridge Lights Install Bridge Lights Hydro-Mulch Medians & Parkways 30' Dallas Water Main - Lowering Lower 8' Water for Skaggs - Conflict with Dallas 30'RCP Install Pull Boxes Lime Subgrade 34' width at 30' Water Conflict Clean-up DENTON TAP ROAD - SOUTH (South of Sandy Lake Road) Topsoil in Median Islands & Parkways Bridge Railing at Grapevine Creek Bridge Electrical & Lights on Bridge Pavement Markings 1-DriveApproach 4-~rneel Chair Ramps Pull Boxes Channel Excavation & Slope Work Metal Guard Rail off ends of Bridge Hydro-Mulch Medians & Parkvays Clean-up Additional Brick Pavers on West side of Roadway DTAP