ST8402-CS 890912DATE:
BY:
September 12, 1989
Larry Davis, Public Works Construction Inspector
DENTON TAP ROAD PRO~ECT
DENTON TAP ROAD - NORTH
(North of Sandy Lake Road)
Pavement Markings
Metal Guard Rail on both sides of Bridge
Channel shaping around and under Bridge
Slope work along Park
painting Bridge & Rail
Electrical for Bridge Lights
Install Bridge Lights
Hydro-Mulch Medians & Parkways
30' Dallas Water Main - Lowering
Lower 8' Water for Skaggs - Conflict with Dallas 30'RCP
Install Pull Boxes
Lime Subgrade 34' width at 30' Water Conflict
Clean-up
DENTON TAP ROAD - SOUTH
(South of Sandy Lake Road)
Topsoil in Median Islands & Parkways
Bridge Railing at Grapevine Creek Bridge
Electrical & Lights on Bridge
Pavement Markings
1-DriveApproach
4-~rneel Chair Ramps
Pull Boxes
Channel Excavation & Slope Work
Metal Guard Rail off ends of Bridge
Hydro-Mulch Medians & Parkvays
Clean-up
Additional Brick Pavers on West side of Roadway
DTAP