Loading...
ST8402-CS 890908GINN, INC. September 8, 1989 Mr. Russ~l~o~yle, City o f/~oppel 1 P.O. ~6x 478 Cop~Q. 1, TX 75019 P,Eo CONSULTING ENGINeeRS Denton Tap Road Improvements from Sandy Lake Road to Denton Creek Dear Mr. Doyle: We have received and reviewed your 9/5/89 Memorandum regarding traffic congestion at the Denton Tap Road/Parkway Blvd. intersection. We anticipate a partial solution to the problem will be implemented in about that one week. We have arranged to have the Traffic Signal Contractor, Arjang Electric Systems, Inc. modify the temporary signals by the addition of left turn signal heads and increasing the timing and phasing capabilities of the controller by installing the permanent Multisonics 820-A controller (ahead of the permanent installation). This operation will be initiated upon L.H. Lacy Co.'s opening of the full Denton Tap Road/Parkway Blvd. intersection. At that time our Traffic Signal Contractor will establish the proper timing for the morning, afternoon (school) and evening peaks and put the system into full automatic recall operation. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer JCK/dsp cc: Randy Fleming File 379/260 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900