Loading...
WA9601-CS 990524 FROM THE DEPARTMENT OF ENGINEERING To: Carolyn Bebermeyer, Sr. Accounting Technician From: Ken Griffin, P.E., Dir. of Engineering/Public Works Date: May :34, 1999 RE: Overtime Pay Requests This memo is written per our conversation today, concerning my request for contractor's on the Elevated Storage Tank and the 24" water line, Landmark Construction and Fox Construction respectfully, to work on Saturdays or Sundays as needed to expeditiously complete the installation of the water line and the elevated storage tank. These two facilities are critical in meeting our water demands for the snmmer months. I have instructed my inspectors not to access overtime fees to these two particular contractors, as it is in the City's best interest to complete these projects as soon as possible. If you have any questions concerning this memo please let me know. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DEIGN" DEVELOPMENT FEES PROJECT NAME: Wagon Wheel Ranch Elevated Storage Tank 0NA 96-01 ) ENGINEER: REVISION DATE: 3/9/99 , I ,1 I ,~ SEN;r ASSESSMENT "ASSESSED FEE "AMOUNT PAID DATE Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light notify street dept. Construction Inspection Roadway Impact-Zone Street Cut Permit 1/25/99 Overtime Inspection (1/23) $240.00 2/15/99 Overtime Inspection (2/13) $60.00 2/15/99 Overtime Inspection (2/14) $240.00 2/22/99 Overtime Inspection (2/20) $60.00 2/22/99 Overtime Inspection (2/21) $240.00 3/1/99 Overtime Inspection (2/27) $120.00 3/1/99 Overtime Inspection (2/28) $240.00 3/8/99 Overtime Inspection (3/6) $60.00 3/8/99 Overtime Inspection (3/7) $240.00 Total Fees Fees Paid Amount Owed TOTALS $1,500.00 $0.00 $1,500.00 I I ' r' NOTES Prior To ConstrucUon Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Irrigation Plan Recd. Irrigation Plan Approved