ST8402-CS 890511"f~E LEC TR IC
Thomas G. parsons
District Manager
May 11, 1989 .__~ ;~'~
· j ~ '
Mr. Alan gaztliff :,, ,~.~
city ; ppell
P.O. ~x 4~8
Cop~l, Tx. 75019
Dear Mr. Ratliff:
Our Customer Services Department has completed its design to
provide street light service to your Denton Tap Road #idening
project. 'It is proposed to install double fixture fE Decashield
street lights on 66-Union Metal poles with TU Electric provided
foundations- The street lights will incorporate a customer
provided and installed conduit system.
TO Electric will install the street lights and the foundations
for $88,440.00. This represents the difference in cost between
the underground facilities you requested and our standard
overhead facilities.
Flease indicate your preferred method of payment for this
installation. Security can be provided by offering either Cash
in Advance, Escrow, Bond, or a Letter of Credit.
Please call Tim Brancheau at 323-8910 if you have any questions
or concerns about this project.
Sincerely,
Thomas fi. Parsons
TGP/TB:rh
cc:
John Karlsruher - finn Inc.
..
GINN, INC.
CONSUIiI'ING I£NGINEERS
DRAFT
PROPOSED PROJECT BUDGET
DENTON TAP ROAD IMPROVEMENTS
FROM BELT LINE ROAD TO SANDY LAKE ROAD; AND
FROM SANDY LAKE ROAD TO DENTON CREEK
CONSTRUCTION (6 LANE w/St'd. Bridge Rail)
RAILROAD CROSSING $
CONOCO PIPELINE $
STREET LIGHTS $
LANDSCAPING $
TRAFFIC SIGNALS $
RIGHT - OF - WAY $
ENGINEERING $
INSPECTION & TESTING $
TRENCH SAFETY $
CONTINGENCIES $
$ 5,161,131.83 *
206,000.00
40,000.00
217,500.00
213,000.00
170,000.00
100,000.00
443,402.66
154,833.95
26,763.39
367,368.17 *
TOTAL $ 7,100,000.00
(-) TOTAL AVAILABLE CITY FUNDING ($ 4,500,000.00)
(=) NECESSARY FUNDING FROM DALLAS COUNTY $ 2,600,000.00
TOTAL AVAILABLE DALLAS COUNTY '85 BOND FUNDS $ 4,250,000.00
(-) NECESSARY FUNDING FROM DALLAS COUNTY ($ 2,600,000.00)
(=) REMAINING '85 DALLAS COUNTY BOND FUNDS $ 1,650,000.00
REVISED APRIL 6, 1988
* REVISED APRIL 18, 1988
The estimated construction costs h'ave been revised to
include the only TOTAL BASE BID (6 LANE) for each project.
Initially this item also included the. Contractor proposed
$ 40,000.00 reduction in estimated Contract Price; the
alternate bid item for a retaining wall (which is no longer
needed); and the additional cost of the Contractor's
proposed Alternate Trench Safety System. After further
consideration, these costs have been deleted from
Construction and added to the Contingencies.