ST8402-CS 890317GINN, INC. March 17, 1989 Mr. David M. Snyder, P.E. L. H. Lacy Company P.O. Box 541297 Dallas, Texas 75354-1297 CONSULTING ENGINEERS Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - Change Order No. 2 - Revised. Dear Mr. Snyder: We are enclosing six (6) copies of Revised Change Order No. 2 to the subject Contract. This Change Order No. 2 increases the scope of work of the subject Contract to include the construction of the following: ae One southbound left turn lane at the median opening located at Station 178+17.77. One northbound left turn lane and a median opening at Station 182+44. One northbound left turn lane and a median opening at Station 186+98. One northbound and one southbound left turn lane and a median opening at Station 195+28. E. The west turnout of Parkway Boulevard. This work is to be accomplished in accordance with the Drawings transmitted to you on January 17, 1989, list attached, and the Contract specifications. Payment for the work included in this Change Order No. 2 for items A. through E., above, shall be in accordance with the Unit Prices in the Contract, with the exception of Pay Item 360.1, for items A. through D. above. We concur with your letter of February 27, 1989, copy attached, that the existing Contract Unit Price for Item 360.1 - 8" Concrete Pavement (3000 PSI) should apply to the work included in the original scope of work of the Contract and the left turn lanes and median openings added to the project by. this Change Order No. 2 which would be slip-formed. Therefor, we propose the establishment of a new Pay Item, No. 360.6, 8" Concrete Pavement (3000 PSI) (For Additional Left Turn Lanes and Median Openings placed by other than slip-form paving machines), at the Unit Price proposed in your letter of February 27, 1989 of $ 16.68 per Square Yard (measured in place). Pay Item No. 360.6 shall only apply to construction of the left turn lanes and median openings, included in items A. through D. above, by methods other than slip-form. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 In preparation of the estimated construction costs accompanying the subject Change Order, we have used the price for proposed Pay Item No. 360.6. This sets the anticipated upper limit of costs associated with this Change Order No. 2. If some of the work included herein is done by the slip-form method the lower price for Pay Item 360.1 will be applied and the total construction cost associated with this Change Order No. 2 will be reduced accordingly. As we have previously discussed, the work included this Change Order No. 2 shall not be allowed to proceed until the City of Coppell has received the financial commitments pledged by the property owners who have requested these additional median openings and left turn lanes. Therefore, we will notify you of the City Council approval or disapproval of this Change Order as soon as possible after the Council meeting at which it is considered; and we will notify you to proceed with the work once the adjacent property owners fulfill their financial obligations with the City. This revised Change Order No. 2 shall also include the addition of 10 calendar days to the Contract time to allow for the construction of items A. through E. above. If you are in agreement with the terms of this Change Order No. 2, please execute all six copies and return them to this office. We must require your response to this proposed Change Order No. 2 by Monday, April 3, 1989 in order to have it placed on the agenda for the April 11, 1989 city Council meeting. Once approved by the city, we will return two copies with original signatures to you. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer enclosures cc: H. Wayne Ginn, P.E. Russell Doyle, P.E. Randy Fleming File J - 379 a:lhlco2n2