ST8402-CS 890317 (2)T GINN, INC. March 17, 1989 Mr. Jerry Parche', P.E. Jerry Parche' Consulting Engineers 320 Westway Place, Suite 501 Arlington, Texas 76018 Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek, Coppell, Texas. Dear Mr. Parche': At the request of the City Engineer, Mr. Russell Doyle, I am writing this letter to inform you that Change Order No. 2 for the subject project, covering the additional median openings and left turn lanes requested by ABQ Development and Univest Development were not approved by the Contractor, and therefore was not considered for approval by the City Council at their February 28, 1989 meeting. A copy of the Contractor's February 27, 1989 letter is attached for your reference. After reviewing both the Contractor's request for revision of the Change Order, and his Contract with the city of Coppell, we have determined that he is within his rights under the Contract to request pricing other than the Contract Unit Prices for work added to the Contract. The basis of his claim is that this is new work being added to the scope of work of the Contract, as opposed to an error in estimated quantities, which would have been covered by the existing Contract Unit Prices provided the error did not constitute more than a 20% deviance in the bid quantities for a major item. We have also determined that his proposed price for the "hand work" is reasonable for this type of work. In fairness to all parties concerned, we have revised proposed Change Order No. 2 to allow the Contractor to perform the required "hand work" placements of 8"-3000 psi reinforced concrete for the subject median openings and left turn lanes at the new unit price of $ 16.68 per Square Yard, as measured in place. Any of the concrete placements for the subject median openings and left turn lanes which are done by slip-form methods will be paid for at the existing Contract Unit Price of $ 13.68 per Square Yard. The total costs shown in the attached Cost Estimates and Summary and Distribution of Construction Costs are based on the $ 16.68 per S.Y. unit price. However, since the Contractor may use slip- form methods to place a substantial amount of the concrete required for the subject median openings and left turn lanes, the final costs may be somewhat lower than those shown. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 It is our intention to have this Change Order no. 2 placed on the April 11, 1989 City Council Agenda for their approval. If you have any questions, please contact Mr. Doyle at (214) 462-0022. Sincerely, John C. Karlsruher, P.E. Project Engineer attachments cc: Russell Doyle. P.E., city Engineer H. Wayne Ginn, P.E. Kevin Peiffer, P.E. J-379/280