Loading...
ST8402-CS 890317 (3)GINN, INC. March 17, 1989 Mr. Michael R. Allen, President Univest Development Company 12770 coit Road, suite 1215 Dallas, Texas 75251 CONSULTING ENGINEERS Re · Denton Tap Road Improvements from Sandy Lake Road to Denton Creek, Coppell, Texas. Dear Mr. Allen: At the request of the city Engineer, Mr. Russell Doyle, I am writing this letter to inform you that Change Order No. 2 for the subject project, covering the additional median openings and left turn lanes requested by Univest Development and ABQ Development were not approved by the Contractor, and therefore was not considered for approval by the city Council at their February 28, 1989 meeting. A copy of the Contractor's February 27, 1989 letter is attached for your reference. After reviewing both the Contractor's request for revision of the Change Order, and his Contract with the city of Coppell, we have determined that he is within his rights under the Contract to request pricing other than the Contract Unit Prices for work added to the Contract. The basis of his claim is that this is new work being added to the scope of work of the Contract, as opposed to an error in estimated quantities, which would have been covered by the existing Contract Unit Prices provided the error did not constitute more than a 20% deviance in the bid quantities for a major item. We have also determined that his proposed price for the "hand work" is reasonable for this type of work. In fairness to all parties concerned, we have revised proposed Change Order No. 2 to allow the Contractor to perform the required "hand work" placements of 8"-3000 psi reinforced concrete for the subject median openings and left turn lanes at the new unit price of $ 16.68 per Square Yard, as measured in place. Any of the concrete placements for the subject median openings and left turn lanes which are done by slip-form methods will be paid for at the existing Contract Unit Price of $ 13.68 per Square Yard. The total costs shown in the attached Cost Estimates and Summary and Distribution of Construction Costs are based on the $ 16.68 per S.Y. unit price. However, since the Contractor may use slip- form methods to place a substantial amount of the concrete required for the subject median openings and left turn lanes, the final costs may be somewhat lower than those shown. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 It is our intention to have this Change Order no. 2 placed on the April 11, 1989 city Council Agenda for their approval. If you have any questions, please contact Mr. Doyle at (214) 462-0022. Sincerely, John C. Karlsruher, P.E. Project Engineer attachments cc- Russell Doyle, P.E., City Engineer H. Wayne Ginn, P.E. Kevin Peiffer, P.E. J-379/280 J379C02 DENTON TAP ROAD IMPROVEMENTS from SANDY LAKE RD. to DENTON CREEK ESTIMATED COST OF ABQ DEV. AND UN[VEST DEV. REQUESTED MEDIAN OPENING AND LEFT TURN LANES 3 - 17 - 1989 CHANGE OROER NO. 2 STATION 178+17.77 ' SOUTHBOUND LEFT TURN LANE FOR UNIVEST DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I GUANTITY I UNIT PRICE I AMOUNT I BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation Place Topsoit - Median (6" thick) Broadcast Seeding (Common Berm) Lime treatment, mat. in place Lime siurry, Ty A., 5~ 22.5 #/sy Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 8" conc. pavement 3000 psi 6" Monolithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-stipform) 6" conc. (Driveways & Median Noses) 6"x6" Jiggle Bar (reft.)(Type 1-C) 4" Traffic Button, Uhite(Non-Reft.)(P-7-W) 4" Traffic Button, White(sing.-Refi.)(P-15-~) 2" PVC conduit (Sch. 40) 3" PVC conduit (Sch. 40) 4" PVC conduit ($ch. 40) Putiboxes ICY IsY IsY sY TON TON SY LF SY SY EA EA EA LF LF iLF 29.9 -147.09 -147.09 179.48 0 3.05 0 15.14 179.41 -32.31 10 0 0 -14.48 -7.24 -7.24 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 S2.00 $6.00 $2.40 $3.00 $3.73 $127.00 $197.34 ($7~.55) ($61.78) $188.45 $0.00 $192.15 $0.00 S15.14 $2,992.56 (S775.44) $50.00 $0.00 $0.00 ($34.75) ($21.72) ($27.01) $0.00 SUBTOTAL $2,641.40 STATION 182+44 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM I DESCRIPTION I UTS I OUANTITY I UNIT PRICE I AMOUNT I BASE BID 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation PLace Topsoil - Median (6" thick) Broadcast Seeding (Common Berm) Lime treatment, mat. in place iLime slurry, Ty A., 5% 22.5 #/sy Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 8,, conc. pavement 3000 psi 6" Monolithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-s[ipform) 6" conc. (Driveways & Median Noses) 6"x6' Jiggle Bar (ref~.)(Type 1-C) I 4" Traffic Button, ghite(Non-Reft.)(P-7-~) 14" Traffic Button, ~hite(sing.-Reft.)(P-15-~) I 2" PVC conduit (Sch. 40) I 3" PVC conduit (Sch. 40) I 4" PVC conduit (Sch. 40) IPuttboxes CY SY SY SY iTON lION SY LF SY SY EA EA EA lt~ 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 S2.00 $6.00 $2.40 $3.00 S3.73 $127.00 S188.30 ($119.90) ($100.71) S176.26 $0.00 $179.55 $0.00 (S179.84) S3,022.42 $1,405.68 $0.00 (S32.00) ($96.00) $285.60 $357.O0 $443.87 $508.00 SUBTOTAL $6,038.23 J379C02 STATION 182+44 - NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I U. IT PRICE I AMOU.T I BASE BID 6 LANE PAVEMENT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation IcY PLace Topsoil - Median (6" thick) IsY Broadcast Seeding (Common Berm) IS¥ Lime treatment, mat. in place Is¥ Lime slurry, Ty A., 5% 22.5 #/sy ITOH Lime slurry, Ty A., 5% 34 #/sy (9" Thick) ITOH 8" conc. pavement 3000 psi ISY 6" MonoLithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-stipform) ISY 6" conc. (Driveways & Median Noses) ISY 6"x6' JiggLe Bar (reft.)(Type 1-C) lEA 4" Traffic Sutton, ghite(Non-Reft.)(P-7-g) lEA 4" Traffic Sutton, WhJte(sing.-Reft.)(P-15-W) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. 40) ILF 4" PVC conduit (Sch. 40) ILF PuLLboxes lEA 33.44 -226.87 -226.87 200.68 0 3.41 0 -44.7 200.61 26.26 10 0 0 0 0 0 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 $2.00 $6.00 S2.40 $3.00 $3.73 $127.00 $220.70 ($113.443 ($95.29) $210.71 $0.00 $214.83 $0.00 ($44.70) $3,346.17 $630.24 $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUBTOTAL $4,419.24 STATION 186+98 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT I ========================================================================================================= IBASE BID 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 IRoadway Excavation IcY IPtace Topsoit- Median (6" thick) ISY IBroadcast Seeding (Common Berm) ISY ILime treatment, mat. in place ISY ILime slurry, Ty A., 5% 22.5 #/sy ITON ILime slurry, Ty A., 5% 34 #/sy (9" Thick) ITOH 8" conc. pavement 3000 psi ISY 6" MonoLithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-s[ipform) ISY 6" conc. (Oriveways & Median Hoses) ISY 6"x6" JiggLe Bar (refL.)(Type 1-C) lEA 4" Traffic Button, White(Non-RefL.)(P-7-g) lEA 4" Traffic Button, White(sing.-RefL.)(P-15-~) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. 40) ILF 4" PVC conduit (Sch. 40) ILF PuLLboxes lEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 4 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 S2.00 $6.00 $2.40 $3.00 $3.73 S127.00 $188.30 ($119.903 ($100.713 S176.26 S0.00 $179.55 S0.00 ($179.843I S3,022.42 Sl,405.68 $0.00 ($32.00) ($96.00) $285.60 S357.00 S443.87 S508.00 SUBTOTAL $6,038.23 J379C02 STATION 186+98 ' NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANT]TV I UNIT PRICE I AMOUNT 110 160 16~ 260 26~ 26~.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 62~ IBASE BID 6 LANE PAVEMENT IRoadway Excavation ~Ptace Topsoil - Median (6" thick) IBroadcast Seeding (Common Berm) Lime treatment, mat. in place Lime slurry, T¥ A., 5~ 22.5 #/s¥ Lime slurry, Ty A., 5~ 3& #/sy (9" Thick) 8" conc. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-sLipform) 6" conc. (Driveways & Median Noses) 6'x6" JiggLe Bar (reft.)(Type 1-C) &. Traffic Button, Uhite(Non-RefL.)(P-7-~) ~" Traffic Button, ~hite(sing.-Ref[.)(P-15-U) 2" PVC conduit (Sch. &O) 3" PVC conduit (Sch. &O) &" PVC conduit (Sch. &O) PuLLboxes CY SY SY SY TON TON SY LF SY SY EA EA EA LF LF iLF EA 33.4& -226.87 -226.87 200.68 0 3.&1 0 -~.7 200.61 26.26 10 0 0 0 0 0 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $16.68 $1.00 $16.68 S24.00 $5.00 $2.00 $6.00 $2.~0 $3.00 S3.73 $127.00 $220.70 ($113.44) ($95.29) $210.71 $0.00 $214.83 $0.00 ($~.70) $3,346.17 $630.2~ $50.00 $0,00 $0.00 $0.00 S0.00 $0.00 $0.00 SUBTOTAL STATION 195+28 - MEDIAN OPENING AND LEFT TURN LANES FOR ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOU.T I BASE BID 6 LANE PAVEMENT 110 160 16~ 260 26& 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 62~ Roadway Excavation PLace Topsoil - Median (6" thick) Broadcast Seeding (Common Berm) iLime treatment, mat. in place Lime slurry, Ty A.o 5~ ~2.5 #/sy Lime slurry, Ty A., 5~ 3~ #/sy (9" Thick) 8" conc. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-s[ipform) 6" conc. (Driveways & Median Noses) 6'x6" JiggLe Bar (refL.)(Type 1-C) ~. Traffic Button, ~hite(Non-RefL.)(P-7-U) &" Traffic Button, Uhite(sing.-RefL.)(P-15-U) 2" PVC conduit (Sch. 3" PVC conduit (Sch. ~0) 4" PVC conduit (Sch. 40) PuLtboxes CY SY SY SY TON TON ISY ILF SY SY EA EA EA LF LF LF EA 82.17 -5&5.49 -545.49 479.78 3.39 3.03 0 -210.72 492.96 52.52 18 -16 -16 111 111 111 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 $2.00 $6.00 S2.40 $3.00 $3.73 $127.00 $5&2.32 ($272.75) ($229.11) $503.77 $227.13 $190.89 $0.00 (S210.72) $8,222.57 $1,260.&8 $90.00 ($32.00)! (S96.00) $266.60 S333.00 $616.03 $508.00 SUBTOTAL $11,718.02 J379C02 SUNNARY AND DISTRIBUTION OF CONSTRUCT%OM COSTS: MEDIAN OPENINGS: STATION 182+44 STATION 186+98 STATION 195+28 SUBTOTAL NEDIAN OPENINGS LEFT TURN LANES: ABQ DEV. UNIVEST DEV. TOTAL $3,019.12 S3,019.12 $6,038.23 S3,019.12 $3,019.12 S6,038.23 S4,235.61 S0.00 S4,235.61 $10,273.84 $6,038.23 $16,312.07 STATION 178+17.77 $0.00 $2,641.40 $2,641.40 STATION 182+44 $4,419.24 $0.00 $4,419.24 STATION 186+98 $4,419.24 $0.00 $4,419.24 STATION 195+28 NORTH BOUND $3,986.54 $0.00 $3,986.54 STATION 195+28 SOUTH BOUND $3,495.88 $0.00 $3,495.88 SUBTOTAL LEFT TURN LANES S16,320.90 $2,641.40 $18,962.31 TOTAL ESTIMATED CONSTRUCTION COST $26,594.74 $8,679.63 $35,274.37 ENGINEERING, TESTING AND INSPECTION g 10~ $2,659.47 $867.96 $3,527.4& GRAND TOTAL $29,254.21 $9,547.60 $38,801.81 ,/ .,iv 17 1 0~3 PRESI'ON F<OAD ,. SUITE 100, Li"".~-118 DAI~L. AS., TEXAS '752i~8 C.. KARLSRUHEF¢., P.E. .r..i[:d.)E R~ 2 . · .'~ . DEN'T~N "I'AP ROAI) IMPROVEMENT FROM ' SANDYi~' LAKE "TO'-' "- -- -DENTON . CREEl(. ..... ,,. ,. , . ;::.;'"... ,' :L;~';'/,H;" LA[:Y WILL AGREE TO CHANGE ORDER',,~? PRDVI'DED AN'~:,"rl.4E'.C'~TY OF. COPPEt, I. N~L.L ~6RE:E.,-,TO':;THE FOLLON] . , ;., ;~,:,,.,. ,....,~,......¢ :-,¢,,.,. ,.. YOU ,.,IArED IN YOUR LET'rE:R;- THis".BRANBE': ORDER' I ,;,:S[*,O'PE OF, WORt(. THAT INCREASED 'SCOPE· OF..i. WORKi.'~IS" AN OF 2.6¢~%.~ CALCULATED '. BY Es'r:IMA]"ED ,DO,EAR VOL~I ~IED ON TI4E FAC.,L~ OF' THE CHANf]E ORDER.' ,.SCDPE DF WORK L. FI. LACY NEEDS l C)?OA~ENDA~' DA~S;'ADDED~?T~ THZS'INCREA.~EI) SCOPE OF b~ORK A~SO'.~ SCOPE· THE,:'L, I-{; LACY COMPANY.- OUR '['NI~'IA~-.BID PRICE'" FOR .:)60. i ( C[]NC. PAgEMENT. 50OO'.PSI)';v I8'j'BASED RA'I'IO':OF'~ MACHINE WORK TO HAND WORK;t',..~.,THIS;,RA]'IO ,HAS'BEEN.';. AFFE'c"rE[)'.~APPRECIAI~JLY, AND L:'..Ft; sw.,,'rHzs CHANt,.~E ORDER. ; O0¢']'NCRE;ASE 'OVER WHA'r · IS NOW ' SHOWN?ON-':THEe, CHANGE COMPANY FEELS THIS A )ND I T IONS STATED'. ABOVE,-,; NE W I ~U':' BE-¥BL'AD , :;,~,. ,.. .... PRO5 EOT;;' MANABER ~ "(~allty C0'nsirucilo~ for ¢