Loading...
WA9601-CS 990507 SHIMEK, JACOBS & FINKLEA, L.L.P. C9 / 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V CONWAY, PE. JOHN W. BIRKHOFF, PE. JOE R. CARTER, P.E May 7, 1999 GARY C HENDRICKS, P.E I. C. FINKLEA, P.E. Mr. Joe Swi a Landma tructures, Inc. vlal~6~i!F~V~~d 76177 Re: City of Coppell Wagon Wheel Ranch Elevated Storage Tank Change Order No. 5 Dear Mr. Swinnea: We are enclosing five copies of Change Order Number 5 to your contract with the City of Coppell, for the construction of the Wagon Wheel Ranch Elevated Storage Tank. Change Order Number 5 provides for that extra work required for the deletion of the proposed 24-inch butterfly valve in the yard and furnishing and installing a 20-inch flanged butterfly valve below the expansion joint in the stainless steel chamber piping. If this change order is acceptable, please sign and return all five copies to this office. Sincerely Paul A. Carline, E.I.T. Enclosure cc: Mr. Kenneth Griffin, P.E.// Mr. Larry Davis \\sjf~sjf ~o12\prqjects\clerical\coppell\96-149\letters\const\co_51trdoc CITY OF COPPELL, TEXAS WAGON WHEEL RANCH ELEVATED STORAGE TANK Project No. WA-96-01 Bid No. Q0198-03 CHANGE ORDER NO. 5 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Landmark Structures, Inc., 1665 Harmon Road, Fort Worth, Texas 76177, for construction of the Wagon Wheel Ranch Elevated Storage Tank, dated March 10, 1998. B. DESCRIPTION OF CHANGE Deletion of the proposed 24-inch butterfly valve in the yard and furnishing and installing a 20-inch ~anged butterfly valve below the expansion joint in the stainless steel chamber piping. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: l o .l Previous' Quantity Revised Unit Unit Price I Amount Description Quantity This C.O. Quantity Of Change 17 ] Substitute 24" Butterfly Valve 0 I I Ea. ~ ($4,000.00) I ($4,000.00) with a 20" Flanged Butterfly Valve Total: ~ ($4,000.00) Original Contract Amount $2,256,717.00 Change Order No. I 230,635.70 Change Order No. 2 4,000.00 Change Order No. 3 47,600.00 Change Order No. 4 (23,096.20) Change Order No.~jt~ (4,000.00) Revised Contract Amount $2,511,856.50 D. EFFECT OF CHANGE ON CONTRACT TIME It is hereby agreed that work associated with Change Order No. 5, will add no additional working days to this project. Original Contract Time 460 Calendar days Time, Change Order No. 1 0 Calendar days Time, Change Order No. 2 0 Calendar days Time, Change Order No. 3 0 Calendar days Time, Change Order No. 4 0 Calendar days Time, Change Order No. 5 0 Calendar days Revised Contract Time 460 Calendar days Wagon Wheel Ranch Elevated Storage Tank (C. O. #5) Page 1 of 2 (5/7/99) \~sjf~jf_vo12\projecux~lerical\coppell\96-149~pecs\co-5 .doc E. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Landmark Structures, Inc., do hereby agree to append this Change Order No. 5 to the original contract between themselves, dated March 10, 1998. City of Coppeli, Texas Landmark Structures, Inc. Owner Contractor By: By: Date: Date: Attest: Attest: Wagon Wheel Ranch Elevated Storage Tank (C. O. #5) Page 2 of 2 (5/7/99) \XsjfXsjf_vo12\projects\clerical\coppell\96-149~specs\co-5.doc