Loading...
ST1002-CS110818 (3) (10/26/2011) Keith Marvin - Fwd: Old Town / Bethel Road ImprovementsPage 1 From: Keith Marvin To: drp@freese.com Date: 8/18/2011 10:34 AM Subject: Fwd: Old Town / Bethel Road Improvements Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Chris Hardwick" <hardwickcj@verizon.net> 8/7/2011 9:09 PM >>> Chris and/or Keith, We're working on relocations for Time Warner along Bethel Road and the new development of the Old Town Center. To date, we have downloaded the 100% construction plans for Old Town (project # ST 10-02) and the 90% construction plans for Bethel and Coppell Road(Project # ST 03-01). The purpose of this email is to request AutoCAD dwg (MicroStation dgn is also ok) files for the projects mentioned above. Please send the following files at your earliest convenience: . Existing topo . Existing ROW . Existing utilities (water, sanitary sewer, storm sewer, etc) . Proposed paving and any bridges, retaining walls or other structures . Alignment (centerline stationing) . Proposed ROW . Proposed utilities (water, sanitary sewer, storm sewer, etc) . Existing and proposed contours (if available) . Any other pertinent files that may impact our design Please feel free to contact myself at 469-358-3147 or David Hatton at 214-670-2113 should you have any questions or require any additional information. (10/26/2011) Keith Marvin - Fwd: Old Town / Bethel Road ImprovementsPage 2 Regards, Chris Hardwick DFW Telecom, Inc.