Loading...
ST8402-CS 890213A BODevelopment February 13, 1989 Mr. Russell Doyle City Engineer P. O. Box 478 Coppell, Texas 75019 ABQ Development Corporation 625 Silver SW Suite 200 PO Box 25625 Albuquerque, NM 87125 Tel 505 242 3330 RE: Denton Tap Median Opening/Left Turn Lanes Dear Mr. Doyle: In accordance with previous established procedures, ABQ Development Corporation requests and agrees to the following items regarding median openings and left turn lanes in Denton Tap Road. 1) ABQ Development agrees to pay for the Engineering, Testing, Inspection, and Construction of the median openings and left turn lanes in Denton Tap Road. Attached is a summary of this cost (25,705.46) 2) ABQ Development agrees to deposit the funds with the City of Coppell within five (5) business days after City Council approval of a change order. This letter supersedes our letter of January 4, 1989. The cost of the northern median opening addressed in the January 4th letter is in this summary. Therefore, ABQ Development is agreeing to pay our prorata share, a total of $25,705.46, for all of the median openings and left turn lanes in Denton Tap. If you have any questions, please let me know. Sincerely, A. Chester, P.E. Project Manager Attachments J379C02 SUHNARY AND DISTRIBUTION OF CONSTRUCT]ON COSTS: NEOIAN OPENINGS: STATION 182+44 STAT[ON 186+98 STATION 195+28 SU8TOTAL NED[AN OPENINGS LEFT TURN LANES: STATION 178+17.77 STATION 182,44 STATION 186+98 STATION 195+28 NORTH 60UND STATION 195+28 SOUTH 60UND ABO DEV. UN]VEST DEV. TOTAL $2,747.32 $2,741.32 $5,494.63 $2,747.32 S2,147.32 $5,494.63 $3,755.61 S0.00 $3,755.61 $9,250.24 $5,494.63 $0.00 $2,103.17 $2,103.17 $3,817.41 $0.00 $3,817.41 $3,817.41 $0.00 $3,817.41 $3,451.40 $0.00 $3,451.40 $3,032.14 $0.00 $3,032.14 SU6TOTAL LEFT TURN LANES $14,119.36 $2,103.11 $16,221.54 TOTAL EST]HATED CONSTRUCTION COST $23,368.60 $7,597.80 $30,966.40 ENGINEERING, TESTING ANO INSPECTION e lOT $2,336.86 $759.78 $3,096.64 GRANO TOTAL $25,?05.46 $8,351.58 $34,063.04