ST0501-CS100728 (2) Page 1 of 2 George Marshall - RE: ST05-01 Deforest Road From:   George Marshall To:   Michael Wisniewski     Date:7/28/2010 11:38 AM     Subject:RE: ST05-01 Deforest Road   Michael,   Thank you for the update.  We are still planning on the 4th quarter of this year.   Thank You, George   George Marshall, PE City of Coppell Engineering 972-304-3562 >>> "Michael Wisniewski" <michael.wisniewski@tritextech.com> 7/28/2010 11:18 AM >>> I have evaluated the Atmos gas line and I have a design on paper but I have to up-load the design into Atmos’ system to make sure that it works.  If I have no problems I should be able to get you something by the end of next week. What is the time line on this project?  When does the city plan on starting construction?     Thanks,   Michael Wisniewski TriTex Technologies, Inc. 5339 Alpha Road, Suite 215 Dallas, TX 76240 Office: (972) 233.2536 Fax:    (972) 233.5160 From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Wednesday, July 28, 2010 11:04 AM To: Michael Wisniewski Subject: ST05-01 Deforest Road file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C5016A7City...10/28/2011 Page 2 of 2   Michael,   I was wondering where you might be at on the relocation design for Deforest Road here in Coppell? We discussed this back on Feb 18th 2010. At this point we have acquired all the ROW except two parcels and the design is at 95%.   Thank You, George   George Marshall, PE City of Coppell Engineering 972-304-3562 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C5016A7City...10/28/2011