ST0501-CS100728 (2)
Page 1 of 2
George Marshall - RE: ST05-01 Deforest Road
From: George Marshall
To: Michael Wisniewski
Date:7/28/2010 11:38 AM
Subject:RE: ST05-01 Deforest Road
Michael,
Thank you for the update. We are still planning on the 4th quarter of this year.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
>>> "Michael Wisniewski" <michael.wisniewski@tritextech.com> 7/28/2010 11:18 AM >>>
I have evaluated the Atmos gas line and I have a design on paper but I have to up-load the design into Atmos’
system to make sure that it works. If I have no problems I should be able to get you something by the end of
next week.
What is the time line on this project? When does the city plan on starting construction?
Thanks,
Michael Wisniewski
TriTex Technologies, Inc.
5339 Alpha Road, Suite 215
Dallas, TX 76240
Office: (972) 233.2536
Fax: (972) 233.5160
From: George Marshall [mailto:gmarshall@coppelltx.gov]
Sent: Wednesday, July 28, 2010 11:04 AM
To: Michael Wisniewski
Subject: ST05-01 Deforest Road
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C5016A7City...10/28/2011
Page 2 of 2
Michael,
I was wondering where you might be at on the relocation design for Deforest Road here in Coppell? We
discussed this back on Feb 18th 2010. At this point we have acquired all the ROW except two parcels and the
design is at 95%.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972-304-3562
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C5016A7City...10/28/2011