Loading...
ST0501-CS100817 (10/28/2011) George Marshall - Re: Fwd: ST05-01 Deforest RoadPage 1 From: Keith Marvin To: Garza, Michael; Marshall, George Date: 8/17/2010 4:09 PM Subject: Re: Fwd: ST05-01 Deforest Road I thought we were just talking about eliminating a bunch of TxDOT detail sheets... I don't see what difference it make where the tables are, or which symbols are used... Keith >>> Gsm Work <gmarshall@coppelltx.gov> 8/17/2010 4:00 PM >>> FYI!! Not quite sure she understands some of our comments. I didn't think we were asking them to redesign the plans but to incorporate our typical signal design. Sent from my iPhone Begin forwarded message: > From: "Kim Brawner" <kbrawner@lee-eng.com> > Date: August 17, 2010 3:41:42 PM CDT > To: "'George Marshall'" <gmarshall@coppelltx.gov> > Cc: "'Dharmesh Shah'" <dshah@lee-eng.com>, "'Lowell DeGroot'" <ddegroot@burnip.com > > > Subject: RE: ST05-01 Deforest Road > > George, > > Dan and I have met to review the traffic signal comments. Thank > you for the specifications that you forwarded. We will modify the > technical specifications to incorporate the City's pay items. We do > have a couple of questions that we need clarification on: > > 1. This traffic signal layout that we originally utilized to > establish the sheet layouts was based on a previously completed > project: Sandy Lake Road - Phase 1 (North Coppell and Sandy Lake). > We met on March 26 in your office with our preliminary plans and on > April 6 in the field, the modified layout sheets were not discussed > at either meeting. > > 2. Because the project is at 95% review, making major > modifications at this stage is difficult. We have reviewed the > sample plan set and all of the information shown in the sample plan > set is shown in our plans. Actually, our plans sheets show more > information than the sample plans set. We can relocate design > tables as shown in the Sandy Lake at Riverchase signal plans. We > would like to continue to utilize the existing legend and symbols > since it would require major rework to match them with the sample > plan set. > 3. Can you forward a copy of the City of Coppell signal pole > detail sheets? We will incorporate the revised detail sheets. > > We have also read your technical specs for mast arm pole assembly > (Page 6-6-13) and have a few questions. The specifications say in > accordance with the "American Association of State Highway and Trans (10/28/2011) George Marshall - Re: Fwd: ST05-01 Deforest RoadPage 2 > portations Officials", but it does not specify which AASHTO version > nor is there a design detail sheet. The contractor and the pole man > ufacturer would not know which version of AASHTO specifications to u > se. Does the City have an on-call contract with a pole manufacturer? > 4. We also wanted to raise awareness of a possible issue. Dan > let us know that city has decided to replace the existing ADA ramps > on the west side of the intersection. Dan is going to forward us > the ADA ramp modifications that he has completed. Hopefully, the > signal layout can be modified without the addition of extra poles. > Additional poles (and design) may be necessary if we cannot > accommodate the ADA ramps within the existing design. Once we > review the changes, we will know more. > > Kimberly Brawner, PE, PTOE > Project Engineer > Lee Engineering, LLC > 3030 LBJ Freeway, Suite 1660 > Dallas, TX 75234 > Office: 972-248-3006 > Cell: 972-310-0185 > Fax: 972-248-3855 > > > From: George Marshall [mailto:gmarshall@coppelltx.gov] > Sent: Tuesday, August 03, 2010 4:01 PM > To: Lowell DeGroot; Kim Brawner > Subject: ST05-01 Deforest Road > > > Dan & Kim, > > Please use the attached plans & specifications with regards to the > traffic signal on Deforest. > > If you have any questions, please call either me or Per. > > Thank You, George > > George Marshall, PE > City of Coppell > Engineering > 972-304-3562