George Marshall - Re: Alley Repair
From:
Glenn Hollowell
To:
George Marshall
Date:
12/9/2010 8:12 AM
Subject:
Re: Alley Repair
CC:
Keith Marvin; Per Birdsall
Looks like some thing that we can handle George. They have several small projects to work on right now
courtesy of the Utility Ops. team but they should be able to get to it within the next month or so. It really
depends on how much work Utility Ops creates for them.
file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4DO08F61 City... 10/28/2011
Page 1 of 1
George Marshall - Alley Repair
From:
George Marshall
To:
Glenn Hollowell
Date:
12/9/2010 8:07 AM
Subject:
Alley Repair
CC:
Keith Marvin
Attachments:
900 Brentwood alley repair.PNG
Glenn,
I understand from Keith that you may be looking for some concrete street work to perform that is not included
within this years annual street and alley contract. I have had a request from Mar Harrienger at 900 Brentwood
(Near the end of Deforest). At the alley entrance to the east of his property there is a failure that would require
full depth replacement. Is this something your crew might be able to handle? We were thinking about just
adding it to this years work if the money was in the budget but unfortunately that is not the case. Please see
attached picture. The location directly at the Alley entrance is the worst.
Thank You, George
George Marshall, PE
City of Coppell
Engineering
972 - 304 -3562
file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4D008E5ACity... 10/28/2011
lip
c
�r r -
.`
i
4 %11.� %
T=
� r
7
46
7'
u
04
Ll
IL OL
a
yL '`
mil■
.L
Area inckude in Deforest
Brentwood Or
I L
L '
■
f
e
• �e
0 .
705
at
701 4