Loading...
ST0501-CS101209Page 1 of 1 George Marshall - Re: Alley Repair From: Glenn Hollowell To: George Marshall Date: 12/9/2010 8:12 AM Subject: Re: Alley Repair CC: Keith Marvin; Per Birdsall Looks like some thing that we can handle George. They have several small projects to work on right now courtesy of the Utility Ops. team but they should be able to get to it within the next month or so. It really depends on how much work Utility Ops creates for them. file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4DO08F61 City... 10/28/2011 Page 1 of 1 George Marshall - Alley Repair From: George Marshall To: Glenn Hollowell Date: 12/9/2010 8:07 AM Subject: Alley Repair CC: Keith Marvin Attachments: 900 Brentwood alley repair.PNG Glenn, I understand from Keith that you may be looking for some concrete street work to perform that is not included within this years annual street and alley contract. I have had a request from Mar Harrienger at 900 Brentwood (Near the end of Deforest). At the alley entrance to the east of his property there is a failure that would require full depth replacement. Is this something your crew might be able to handle? We were thinking about just adding it to this years work if the money was in the budget but unfortunately that is not the case. Please see attached picture. The location directly at the Alley entrance is the worst. Thank You, George George Marshall, PE City of Coppell Engineering 972 - 304 -3562 file: / /C: \Documents and Settings \radloo \Local Settings \Temp \XPgrpwise \4D008E5ACity... 10/28/2011 lip c �r r - .` i 4 %11.� % T= � r 7 46 7' u 04 Ll IL OL a yL '` mil■ .L Area inckude in Deforest Brentwood Or I L L ' ■ f e • �e 0 . 705 at 701 4