ST0501-CS110127
Page 1 of 3
George Marshall - RE: FW: st05-01 Deforest
From:<lguay@wellscoinc.com>
To:"Marshall, George" <gmarshall@coppelltx.gov>
Date:1/27/2011 1:47 PM
Subject:RE: FW: st05-01 Deforest
George.
Did we get the changes needed on the corner.
Larry
lguay@wellscoinc.com
From: George Marshall <gmarshall@coppelltx.gov>
Sent: Thursday, January 27, 2011 12:58 PM
To: Larry Guay <lguay@wellscoinc.com>
Subject: Re: FW: st05-01 Deforest
Thank You!
>>> "Larry Guay" <lguay@wellscoinc.com> 1/27/2011 11:38 AM >>>
George
Here are the changes you have requested.
Larry Guay
OSP Obligatory Planner
Wellsco Inc. (Verizon)
lguay@wellscoinc.com
Cell 940-231-3606
From: keith [mailto:k.dancer@verizon.net]
Sent: Thursday, January 27, 2011 10:33 AM
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D41777ECity...10/31/2011
Page 2 of 3
To: 'Larry Guay'
Cc: gmarshall@coppelltx.gov
Subject: RE: st05-01 Deforest
Here go Larry,
Keith Dancer
Planner/OSP Engineer
Wellsco Inc/VERIZON
From:
Larry Guay [mailto:lguay@wellscoinc.com]
Sent:
Thursday, January 27, 2011 9:00 AM
To:
'keith'
Cc:
lguay@wellscoinc.com
Subject:
FW: st05-01 Deforest
Keith I have marked up the drawings per Georges request, If you would please update your sheet and
return to me and
George Marshall. E-mail address is below.
Thanks
Larry Guay
OSP Obligatory Planner
Wellsco Inc. (Verizon)
lguay@wellscoinc.com
Cell 940-231-3606
From:
George Marshall [mailto:gmarshall@coppelltx.gov]
Sent:
Thursday, January 27, 2011 8:44 AM
To:
Larry Guay
Subject:
st05-01 Deforest
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D41777ECity...10/31/2011
Page 3 of 3
Larry, Attached is the plat as discussed.
George Marshall, PE
City of Coppell
Engineering
972-304-3562
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D41777ECity...10/31/2011
Verizon to bore and place
100'2-4" PVC
proposed pedestal &
12" SS
proposed 2' x 3' hand
2' x 3' hand hole
proposed Verizon cable/
proposed Verizon cable/
hole(rated 20K)
(rated 20K)
30" FM
duct @ 48" min depth 3'
duct 48" min depth
inside R.O.W.
8"W
proposed 2' x 3' hand
12" W
5' off edge of S/W
hole (rated 20K)
3' inside
16" FM
R.O.W.
8"W
12"W
existing tel
cabinet
12"W
proposed Verizon
Verizon to bore and
3' x 3' vault and
place 50' 2-4" PVC
FDH cabinet
Verizon to bore and
place 30' 2-4" PVC
proposed Verizon cable/duct @
extra depth due to proposed
DETAIL
removal of 18" storm drain; place
(not to scale)
duct1' min under existing drain
proposed Verizon cable/
duct @ 48" min depth
below existing grade
444.0
bore elevation
2' min
N
clearance
Verizon
CONSTRUCTION NOTES:
Southwest
IT IS THE CONTRACTOR’S RESPONSIBILITY TO HAVE ALL UTILITIES LOCATED BEFORE
CONSTRUCTION COMMENCES; CALL 1-800-DIG-TESS FOR ALL NON-MUNICIPAL UTILITIES.
POTHOLE ANY FACILITY TO DETERMINE EXACT LOCATION IF WITH CLOSE PROXIMITY TO
PROPOSED ROUTE.
CONTRACTOR MUST ADHERE TO ALL CONSTRUCTION STANDARDS APPROVED BY THE CITY
DeForest Rd Widening
OF COPPELL, WHICH INCLUDES BUT IS NOT LIMITED TO: EROSION CONTROL ORDINANCE,
WO# 7P0A0AF,3PFA0PT
COMPACTION REQUIREMENTS, AND BARRICADING ACCORDING TO THE TEXAS MANUAL ON
Exch Code: 5647Wire Center: 4620Completed: 1/2011
UNIFORM TRAFFIC CONTROL DEVICES.
KEEP APPROVED PERMIT ON JOB SITE AT ALL TIMES.
SHEET 1 0F 8
OSP Engineer: Wellsco, Inc.
10'