ST0501-CS111024 THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document A305
Contractor's Qualification Statement
1986 EDITION
This form is approved and recommended by The American Institute of Architects (AIA)
and The Associated General Contractors of America (AGC) for use in evaluating the
qualifications of contractors. No endorsement of the submitting party or verification of the
information is made by the AIA or AGC.
The Undersigned certifies under oath that the information provided herein is true and sufficiently
complete so as not to be misleading.
SUBMITTED TO: The City of Coppell, Texas
ADDRESS:
SUBMITTED BY: T i s e o Paving C o. Corporation X --
NAME: Partnership
ADDRESS: 419 US Hwy. 80 East Individual
Mesquite, TX 75150
PRINCIPAL OFFICE: Joint Venture
Other
NAME OF PROJECT (if applicable):
TYPE OF WORK lfilc sepal a:c form for each Classification of Work).
Gcncral Construction I1VAC
kft i ical
Other — .__ ---
(rIcasc spccif )
Cop_,rieh: 1904. 1969. 1979. f19d6 by The Americzn Insti!utr of Architects. 1735 New York Avenue. N.V'., Washington. D.C.
.. n ky L,r:h,a ..,1 •he in:::rnal I:,rein ur su! ::::tot: i's provisions wnhout wr itten permission of the AIA violates
■ .., •.ii .a i.. t,.. ;.., , !nil;,I •,� ,.. ::nd wi!I h >ubiee:.o L__•;i! prn -clu IOn
0, I)Ot \'I 5::41:: I i., li iF: :< �'LP : �I. Ili)\ _�L: •1rr v ; AIAUO(!1
n a ,,. 1 :, t'ur :K ! V \L :, s sc AS. FON, u.C. 20006 A305 -1986 1
1. ORGANIZATION
1.1 How many years has your organization been in business as a Contractor?
37 Years
12 How many years has your organization been in business under its present business name?
37 Years
121. Under what other or former names has your organization operated?
None
1.3 If your organization is a corporation, answer the following:
1.3.1 Date of incorporation: 1974
1.3.2 State of incorporation: Michigan
1.3.3 President's name: Arthur Tiseo
Y _ .4 Vice President's name(s): Angelo Tiseo
Robert Caudill
1.3.5 Secretary's name: Louis Tiseo
1.3.6 Treasurer's name: Louis Ti seo
1.4 If your organization is a partnership, answer the following:
1.4.1 Date of organization:
1.4.2 Type of partnership (if applicable):
1.4.3 Name(s) of general partner(s):
N/A
1.5 If your organization is individually owned ans.ver following:
1.5.1 Date of organization:
1.5.2 Name of owner:
N/A
n�a 1), Th1I -\1 A305 CONTRACF(n' c , iA:. IF!CA1ION STATEMENT 19m, EDITION 0 AIA00 I9S6
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE. N.P., WASHINGTON, D.C. 20006 A305-1986 2
1.6 If the form of your organization is other than those listed above, describe it and name the principals:
N/A
2. LICENSING
2.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and
indicate registration or license numbers, if applicable.
2.2 List jurisdictions in which your organization's partnership or trade name if filed.
N/A
3. EXPERIENCE
3.1 List the categories of work that your organization normally performs with its own forces.
Subgrade Stabilization
Concrete Paving
3.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.)
3.2.1 Has your organization ever failed to complete any work awarded to it?
No
3.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your
organization or its officers?
No
3.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts
within the last five years?
No
3.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of
another organization when it failed to complete a construction contract? (If the answer is yes, please attach
details.)
No
• IA UUCU\n:N - I A305 O EON I (!UR S QUALIFICATION STATEMENT [ 19 EDI I ION 0 MAO
THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE. N W.. WASHINGTON. D.C. 20006 A305 -1986 3
3.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of
project, owner, architect, contract amount, percent complete and scheduled completion date.
3.4.1 State total worth of work in progress and under contract: Attached
3.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the
name of project, owner, architect, contract amount, date of completion and percentage of the cost of the work
performed with your own forces.
3.5.1 Sltate average annual amount of construction work performed during the past five years:
Attached •.
3.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your
organization.
Attached
4. REFERENCES
4.1 Trade References:
Attached
4.2 Bank References:
Attached
Hartford Fire Insurance
4.3 .2 Name and address of agent:
Valenti Trobec Chandler Agency
1175 W. Long Lake, Troy, MI 48098
A305-193 4
5. FINANCING
5.1 Financial Statement Available Upon Request
5.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and
income statement showing the following items:
Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued
income, deposits, materials inventory and prepaid expenses):
Net Fixed Assets:
Other Assets:
Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income
taxes, advances, accrued salaries and accrued payroll taxes);
Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, eamed
surplus and retained eamings).
5.1.2 Name and address of firm preparing attached financial statement, and date thereof:
N/A
5.1.3 Is the attached financial statement for the identical organization named on page one?
N/A
5.1.4 If not, explain the relationship arid financial responsibility of the organization whose financial statement
is provided (e.g., parent- subsidiary).
N/A
5.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction?
N/A
i, inx, :"eN, _,z„<oco: 5'. ALAD0019sM
i i {r -,M RICAN INSTITUTE OF nrciirri'.CI .r:5 NEW \URKnri,:c =. , .. , :'.VIINGlON. D.C.2000e A305 -1986 5
6. SIGNATURE
6.1 Dated at Masquite, TX this 24 dayof October, 2011.
Name of Organization: Ti seo Pay ' g ._1 • .
By:
Title: Louis Tise %, Secretary Treasurer
6.2
M being
duly swom deposes and says that the information provided herein is true and sufficiently complete so as not to be
misleading.
Subscribed and sworn before me this 24 day of October, 2011.
Notary Public: j
My Commission Expires: ' I I ►A
o offM // //
•
•
* •
J bo .��
DOC('>I ENT \3{P ri r. )N I RA( - 1 ( 1'.∎ )\ WS( EDITION 0 AIA0 D19SP.
THE AMERICAN INSTITUTE Of ARCHI i=(" I S. IT: > NEV. YORK AVENUE. N. \V.. WASHINGTON, D.C. 20000 A305-1986 6
TISEO PAVING COMPANY PROJECTS . i
JOB DESCRIPTION CONTRACT OWNER OWNER CONTACT PERCENT
NO AMOUNT PHONE NO. NAME COMPLETE
2478 BETHEUBASS PRO $ 9,553,158.00 CITY OF COPPELL 972 - 304 -3684 RICK O'DELL 100
2479 SEAGOVILLE VILLA $ 303,013.00 TEXAS UNITED 972 - 446 -2585 DENNIS GULLEY 100
2480 BELT LINE ROAD $ 6,758,805.00 DALLAS COUNTY 214 - 653 -6423 DALE DAVIDSON 100
2482 PLANO PARKWAY $ 2,342,644.10 CITY OF PLANO 972 - 941 -7152 DENNIS FREEMAN 100
2483 BRAZOS BLVD. $ 1,482,402.55 CITY OF HIGHLAND VILL 469- 446 -0612 TIM BRUEDIGAN 100
2484 EMPIRE CENTRAL $ 5,459,227.96 CITY OF DALLAS 214 - 948 -4250 FEL BOULTON 100
2485 BELT LINE ROAD $ 3,149,412.00 CITY OF CARROLLTON 972 - 466 -4701 TOM GEIER 100
2486 CHRISTINE STREET $ 231,788.03 J &T EXCAVATION 214 - 329 -3110 DOUG HAEUSSLER 100
2487 PAIGE ROAD $ 5,861,057.05 CITY OF THE COLONY 972 - 624 -3195 GORDAN SCRUGGS 100
2488 OLD DENTON RD. $ 7,167,567.95 CITY OF CARROLLTON 972 - 466 -4701 MIKE MCKAY 100
2489 PHASE IIIB $ 5,914,789.87 CITY OF THE COLONY 972 - 624 -3195 GORDAN SCRUGGS 100
2490 BRAND ROAD $ 3,239,726.40 CITY OF RICHARDSON 972 - 238 -4230 CHUCK SCHAEFER 100
2491 FOX AVENUE $ 3,788,327.33 CITY OF LEWISVILLE 972 - 219 -3490 DAVID SALMON 100
2492 ALASKA $ 589,547.50 CITY OF DALLAS 214 - 948 -4250 BILL MORRIS 100 a
2493 QUEBEC $ 1,478,891.00 CITY OF DALLAS 214 - 948 -4250 BILL MORRIS 100
2494 TURTLE CREEK $ 3,368,765.45 CITY OF DALLAS 214 - 948 -4250 YOGI PATEL 100
2495 COCKRELL HILL $ 9,494,215.68 DALLAS COUNTY 214 - 653 -6423 JOHN MEARS 100
2496 POINT ROYAL $ 4,974,831.00 CITY OF ROWLETT 972 - 463 -3910 SHAWN POE 100
2497 PARKWOOD $ 4,145,990.86 CITY OF PLANO 972 - 941 -7152 DENNIS FREEMAN 100
2498 BRONX AVE. $ 2,170,626.10 CITY OF DALLAS 214 - 948 -4250 BILL MORRIS 100
2499 PIPESTONE BLVD. $ 2,961,465.60 CITY OF DALLAS 214 - 948 -4250 YOGI PATEL 100
2500 COUNTRY CLUB $ 5,178,426.55 DALLAS COUNTY 214 - 653 -6423 DALE DAVIDSON 100
2501 COPPELL ROAD $ 2,858,626.15 CITY OF COPPELL 972 - 304 -3684 RICK O'DELL 100
2502 RANDOL MILL $ 8,512,803.00 CITY OF ARLINGTON 817 - 265 -3311 STU BOWMAN 100
2504 RING ROAD $ 979,655.80 CITY OF RICHARDSON 972 - 238 -4230 CHUCK SCHAEFER 100
2505 TRINITY MILLS $ 10,396,363.76 TEXAS DEPT OF TRANS 972 - 225 -0474 GARY MOONSHOW 100
2506 DICKERSON PKWY $ 8,434,703.00 CITY OF CARROLLTON 972 - 466 -4701 MIKE MCKKAY 100
2507 INDEPENDENCE PK $ 1,234,791.90 CITY OF PLANO 972 - 941 -7152 HAMZA HUSSEIN 100
2508 RICHARDSON CMAC $ 3,862,063.69 CITY OF RICHARDSON 972 - 238 -4230 CHUCK SCHAEFER 79.55
2509 EL DORADO PKWY $ 8,719,172.18 CITY OF FRISCO 972 - 335 -5580 JASON BRODIGAN 100
2510 CHURCH STREET $ 2,401,110.80 CITY OF CORINTH 940 - 498 -3250 JUSTIN BROWN 100
2511 ASLBURY $ 1,336,645.34 CITY OF BURLESON 817 - 459 -6577 LANCE BARTON 100
2512 FM 544 $ 7,974,082.87 TX DOT 972 - 225 -0474 GARY BAILEY 0
2513 PRINCETON ROAD $ 3,152,145.50 CITY OF ROWLETT 972 - 463 -3910 SHAWN POE 100
2514 LONG CREEK DR. $ 335,230.00 TOWN OF SUNNYVALE 214 - 503 -0555 MICHAEL STACEY 100
2515 MEDICAL DISTRICT $ 3,268,011.00 TX DOT 972 - 225 -0474 GARY BAILEY 67.3
2516 FM 982 $ 4,887,963.00 TX DOT 972 - 225 -0474 GARY BAILEY 93.16
2517 MCDERMOTT $ 2,132,270.00 CITY OF PLANO 972 - 941 -7152 LEE STIMPSON 100
2518 MONTE CARLO $ 2,666,356.00 CITY OF PRINCETON 214 - 217 -2200 CALEB THORNHILL 100
2519 MIDWAY ROAD $ 768,509.00 CITY OF CARROLLTON 972 - 466 -4701 MIKE MCKKAY 100
2520 FM 407 $ 5,419,912.00 TX DOT 972 - 225 -0474 GARY BAILEY 7.22
2521 MORRIS GERAULT $ 14,011,110.00 TOWN OF FLOWER MND 972 - 874 -6320 KIP GOODCHILD 66.73
2522 LAKE RIDGE DR. $ 1,884,114.85 DALLAS COUNTY 214 - 653 -6423 JOHN MEARS 61.35 l `
2523 FLOWER MOUND $ 1,844,658.40 TOWN OF FLOWER MND 972 - 874 -6320 KIP GOODCHILD 100
2524 CORINTH /DOBBS $ 975,465.51 CITY OF CORINTH 940 - 498 -3250 JUSTIN BROWN 100
2525 FM 546 $ 2,609,836.52 TX DOT 972 - 225 -0474 GARY BAILEY 96
2526 LEGACY /LEBANON $ 3,039,127.45 CITY OF FRISCO 972 - 335 -5580 JASON BRODIGAN 94
2527 BEXAR $ 1,393,631.00 CITY OF DALLAS 214 - 942 -4250 YOGI PATEL 29.4
2528 STONEBROOK $ 4,398,537.00 CITY OF FRISCO 972 - 335 -5580 JASON BRODIGAN 96.68
2529 CHAMPION CL $ 1,199,940.00 CITY OF CARROLLTON 972 - 466 -4701 MIKE MCKAY 78.73
2530 N. COLONY BLVD. $ 5,904,522.00 CITY OF THE COLONY 972 - 624 -3195 GORDAN SCRUGGS 84.14
2531 PIONEER ROAD $ 10,559,524.50 DALLAS COUNTY 214 - 653 -6423 JOHN MEARS 12.63
2532 AIRPORT ROAD $ 2,918,487.04 CITY OF ROCKWALL 972 - 771 -7700 CHUCK TODD 26.52
2534 LONE STAR RANCH $ 1,593,257.32 PCR LAND COMPANY 73.32
2535 INDEPENDENCE PK $ 3,245,294.35 CITY OF FRISCO 972 - 335 -5580 JASON BRODIGAN 0.89
2536 BARNETT CONN. $ 90,795.00 CITY OF HIGHLAND VILL 469- 446 -0612 TIM BRUEDIGAN 5.42
2537 BROWN STREET $ 7,918,059.00 CITY OF WYLIE 972 - 335 -5580 CHAD PENDLEY 7
2538 STREET GROUP $ 2,191,730.05 CITY OF DALLAS 214 - 942 -4250 YOGI PATEL 0
2539 STREET GROUP $ 987,053.50 CITY OF DALLAS 214 - 942 -4250 YOGI PATEL 0
2540 CENTRAUPEARL $ 12,473,919.00 CITY OF DALLAS 214 - 942 -4250 RAJ GUTNER 0
2541 BELLAIRE HEIGHTS $ 2,343,363.00 CITY OF LEWISVILLE 972 - 219 -3490 DAVID SALMON 0
2542 COCKRELL HILL $ 5,218,992.00 DALLAS COUNTY 214 - 653 -6423 JOHN MEARS 0
2543 LAWSON ROAD $ 2,648,751.00 DALLAS COUNTY 214 - 653 -6423 JOHN MEARS 0
ALL PROJECTS BONDED BY:
HARTFORD INSURANCE COMPANIES
ONE HARTFORD PLAZA
HARTFORD, CT 06115
AGENT:
VALENTI TROBEC CHANDLER AGENCY
(248)828 -3377
TISEO PAVING CO.
KEY PERSONNEL /OFFICERS
YEARS
NAME TITLE EXP TYPE OF WORK CAPACITY
Arthur Tiseo President 54 Concrete /Underground Owner, CEO
Robert Caudill Vice President 41 Concrete /Underground Engineer
Angelo Tiseo Vice President 37 Concrete /Underground Superintendent
Albert Tiseo Safety Director 12 Concrete /Underground Safety Officer
1
Louie Tiseo
From: Robert Caudill
Sent: Friday, October 22, 2010 4:42 PM
To: Louie Tiseo
Subject: FW: Flower Mound Road Reconstruction
Robert Caudill
Vice President
Tiseo Paving Company
(972) 289 -0723
From: wafter mitchell [mailto:barnobas @yahoo.coml
Sent: Friday, October 22, 2010 3:43 PM
To: Robert Caudill
Subject: Fw: Flower Mound Road Reconstruction
Forwarded Message - - --
From: Edith Marvin <edith.marvin @flower - mound.com>
To: barnobas @yahoo.com; Tracy LaPiene <tracy.lapiene @flower - mound.com>
Cc: Matthew Hotelling <matthew.hotelling @flower- mound.com >; Tiffany Bruce <tiffany.bruce @flower - mound.com>
Sent: Fri, October 22, 2010 12:02:29 PM
Subject: Flower Mound Road Reconstruction
This was a nice article:
Thanks,
Edith
Archives > Flower Mound Leader > News
Flower Mound Road project ahead of schedule
By Chris Roark, croark
Published: Friday, October 15, 2010 1:36 PM CDT
Those frustrated with the traffic congestion on Flower Mound Road should see some relief next week.
Kent Collins, assistant town manager, said Flower Mound Road from Vanderbilt Drive to Old Settlers Road will open Tuesday,
freeing up some traffic that has resulted from a reconstruction project on Flower Mound Road .
The $2.4 million project, which is funded by street maintenance dedicated sales tax money, features reconstruction from Old
Settlers Road to about 300 feet west of Long Prairie Road. The project is aimed to replace the aging pavement on the road, as
well as improve site distance and grade issues. The realignment at the intersection of Stanford Drive will improve sight lines and
safety and will provide additional storage lengths of turn lanes.
"That area is a roller coaster ride, to say the least," Collins said.
The project began in August, and it's expected to be complete by July.
1
Crews began the project with reconstruction of the north side of the road (westbound) lanes first, shifting traffic to the southern
two lanes. Because of that, a bottleneck was created just west of Old Settlers Road . But Collins said Tuesday's opening will
help.
"This will significantly improve traffic at that intersection," Collins said.
Collins said the section opening will also allow the town to operate traffic signals eastbound and westbound on Flower Mound
Road at the same time.
Collins said because of the traffic problems the project has created, the town strived to reduce the length of time of the project.
"Through discussions with the town staff and the contractors, they've gotten it down to a five -month project, so that's more than
half the time that they took off of it," Collins said. "A lot of it had to do with phasing and traffic control. So we're way far ahead of
our original schedule."
Collins also credits TISEO Paving Company, which was awarded the project, for the quick process.
"TISEO has been really good to work with," Collins said. "They brought all of their resources to the project to get it done as fast
as they can. It's been pretty impressive to watch."
TISEO is also the company that is working on the Morriss /Gerault Road Improvement Project, as well as the FM 407 TxDOT
project.
In a separate project, Flower Mound Road from Skillern Road to FM 1171 is being redone to turn a two -lane asphalt road into a
four -lane concrete road. Also, two existing 90- degree curves will be softened on the road.
For road construction updates, go to www. flower - mound.com /construct /construct info.php.
2