Loading...
SW0801-CS110322 Page 1 of 1 George Marshall - SW08-01 Sidewalk on the Cotton Belt Line From:   George Marshall To:   D. Guido Date:   3/22/2011 11:28 AM Subject:   SW08-01 Sidewalk on the Cotton Belt Line Attachments:   Fwd: Denton Tap Sidewalk Infill   Guido,   A few weeks ago, DART sent us the attached email.  Through discussions at the City we are trying to figure out our options.  Because of this, I would like to determine what it would cost the City, today, to install pedestrian gate equipment on the existing signal.  I understand FWWR contracts through Railroad Signal International so I have contacted them as well.  I determined earlier that the Signal is a Western-Cullen-Hayes model 3590 gate controller which has a sidewalk gate kit for around $700-800 and install should be about 2 hours each.   Thank You, George   George Marshall, PE City of Coppell Engineering 972-304-3562 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D8887D2City_...11/3/2011