Loading...
WA9601-CS 990416 ':,, f ') :-:, SHIMEK, JACOBS & FINKI.EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 - . ( .),) '- ROSS L. JACOBS, P.E. " '- RONALD V. CONWAY, P.E. ,/, ~ _ t~ / JOHN W. BIRKHOFF, P.E. -'~ JOER. CARTER, P.E. ' ' )., April 16, 1999 GARY C. HENDRICKS, P.E, 1. C. FINKLEA, P.E. Transmitted via Facsimile and U.& Mail Mr. Kenneth M. Griffin, P.E. City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Storage Tank Dear Mr. Griffin: We have reviewed the concrete cylinder pipe shop drawings for the Wagon Wheel Ranch Elevated Storage Tank project and the Sandy Lake Road Water Line project to determine if any pieces delivered to the Sandy Lake Road Water Line project could be used on the Wagon Wheel Elevated Storage Tank project. This pipe substitution was recently proposed by Landmark Structures because of their inability to receive concrete cylinder pipe until the end of April. The contractor plans to connect the tank to the 12" water line in Northpoint Drive and have water in the tank by the beginning of May. Installation of the concrete cylinder pipe is also necessary to continue the site work. Our review of the shop drawings from both projects indicates that a number of pieces can be used from the Sandy Lake Road Water Line project with the exception of an adapter piece (A1) and tee (T9), which are unavailable from the Sandy Lake Road project. A summary of the pieces required and their proposed substitutions is shown below. Wagon Wheel Elevated Storage Tank Project Sandy Lake Road Water Line Project Original Piece No. Piece Length (feet) Substitute Piece No. Piece Length (feet) A1 1.92 * 1.92 2 32.00 282 32.00 3 32.00 283 32.00 BX4 11.33 BX296 15.75 A5 1.07 A326 1.07 A6 1.41 A327 1.41 7 32.00 284 32.00 BX8 3.72 Not needed 0 T9 0 Not needed 0 Total Length 115.45 .......... 116.15 · Substitute piece not available from the Sandy Lake Road Water Line Project. \\ENGINEERING\ SJF_SJF_VOL2 SJF',PROJECTS'/CLERICAL'\COPPELL\96-149\LETTERS\CONST~C1TY4 DOC Mr. Kenneth M. Griffin, P.F"' T City Engineer City of Coppell 04/19/99 Page No. 2 If pieces A1 and T9 are available from the pipe manufacturer and delivered to the tank site within the next week, it is our opinion that it would be feasible to substitute the pieces from the Sandy Lake Road Water Line project to the tank project as noted above. Then, at the end of April, the pieces fabricated for the tank project would be delivered to the Sandy Lake project. It is our understanding after conversation ~vith Fox Contractors, that this substitution would not affect their schedule with the Sandy Lake project, as long as the substituted pipe is delivered by the end of April. It is also our understanding that the pipe substitution will be provided on a no cost/no credit basis. If Landmark Structures decides to proceed with the pipe substitution, we recommend they initiate communication and handle all coordination efforts with their pipe supplier and Fox Contractors to be certain it can be accomplished efficiently and not affect the schedule of either project. We are enclosing the concrete cylinder pipe submittals showing the affected pipe pieces and are available to discuss this project further at your convenience. ~ Sincere ;~ ( Enclosure ~ cc: Mr. Larry Davis Mr. Joe Swinnea, Landmark Structures, Inc. Mr. Bob Fox, Fox Contractors \\engin~ering\sjf-sjf-v~~2sjf~pr~.jects\c~erica~\c~ppe~~\96~~49\~etters\c~nst\city4d~c -'/ ~hGOA/ /A,'//-~J~II. ~ 5,, 7f REVIEW COPY T''''A u · n ,s D ,snnn ! I'I/~K J ~B j~T~3~ ooNT'D ON 6 NOT FOR F/P~ 0+97.O7-L ~ 514.5G W/1" THR OUT, UP OUT= 0+96.32 O CLASS 150 ' A5 i 24!' ADAPTOR BS/FLG D4 1.07 1.07 0+96.0(~- ~ 514.5Gb , --, cLAss 150 · b Bx4 I 24" B303 BS/BB D1 11.33 SHORT 11.33 _/~.~ ~ __a, 0+84.67- - 514.5(~ I .. 3 1 24" B303 BS/BB 32,00 ' 0+52 · 67- - 514 · 5[~ - . , 2 I 24" 9303 BS/BB 32.00 STD 32.00 0+20.67-- 514.5G~ : l,t ~_~. CLASS 150 AI: I 24" ADAPTOR MJPE/BB D4 1.92 . 1.92 0+18.75-- 514.5G h-'T,, . CONNECT TO 24" DIP FROM 0.0000 : , TANK WITH HJ COUPLING ~ | t BY OTHERS PIECE DET SPL INV DEFLECTION SLOPE QTY DESCRIPTION STATION ELEV PLAN NO · Slit HPL ( Ft ) DATA TANGENT ( Ft ) READ UP NOTE:READ 1JP DRAWN: DW HANSON Concrete Products, Inc, O CHK BY,' ~ , BY DATE REVISION DATE-' 3-18-99 COPPELL, TEXAS PROJECT-' 98-132B SHEET-' 5 REVIEW COPY HAR _1 ~ 1!199 coNT'D ON NOT FOR FABRICATION 41 TONS 0+41.53 514,26 OF THRU T CLASS 150 -0,44° ~]~ T9 I 24" BS x 24" BB x 24" 2,54 0,0077 . ' CPE TEE 2.54 0+38.99- 514,21- w/24" CPE 12" MJPE 1.87 REDUCER ATT'D 1.87 ! CLASS 150 -0.44° BXS 1 24" B303 BS/BB D?- 3,72 0,0077 SHORT 3,72 ' O+33.40--PULL O,Ol°Dn-- 514,26-- , ~ VPI= 0+02.00 (0.44°Dn) (514.50) CLASS 150 -0.43° 7 1 24" B303 BS/BB 32.00 0.0075 STD 32.00 0+01.4Oi-PULL 0.43°Dn- 514.5{> w/1" THR OUT, UP OUT= 0+00.84 O EQU= 0+00.00 Ah , 0+97.75 Bk VPI= 0+97.75 (0.00°) (514.50) cLAss i5o Dq o.ooo A6 1 24" ADAPTOR FLG/BB 1.41 0.0000 1.41 0+97.74- 514.5(> 0.00° 24" FLG BFV 0.67. 0.0000 BY OTHERS 0.67 0+97.07- 5i4.5~ CONT'D FROM PIECE DET SPL INV DEFLECTION SLOPE INV QTY DESCRIPTION STATION ELEV PLAN NO. SHT HPL ( Ft ) DATA TANGENT ( Ft ) READ UP NOTE:READ -UP DRAWN: DW HANSON Concrete Products, Inc. CHK BY: j NO. BY DATE. REVISION DATE: 3-18-99 COPPELL, TEXAS PROJECT: 98-132B SHEET: .. s~/,/oY' ~ W.L. FEB 1 I~ 1999 ;' rIGSUEDFORFABRICATiON OONT'D ON 36 105+34.19- .B&P 5.72 °Up 473.5~ - I CLASS 150 -4-71° 291 i !24" B303 BS/BB D~9 31.84 0.0824 _l BEVEL SPIG 5 · 00° 31.73 ~ 105+02.4~ .B&P 4.28eDx~ -- 476.1~ - , , VPI= 105+00.00 (4.63~Dn) (476.36) CLASS 150 -0.44e 290 I 24" B303 BS/BB 32. O0 0.0076 STD 32. O0 i 104+70. 46~ -PULL 0.35°Dr~- -- 476.4(> ,-- , CIASS 150 -0.09~ '289 i 24" B303 BS/BB 32.00 0.0015 STD 32. O0 104+38.46~ - -- 476.4~ , ', 288 CLASS 150 THRU 6 24" B303 BS/BB 192. O0 283 STD 192. O0 102+46.4~ - -- 476.74~ " . , , "' · w/8" FLG OUT, LT OUT= 102+38.00 . CLASS 150 -0-09e I. 2e2 I 24-n303 Bs/aB De 32.00 0.0015 , SPC 32. O0 102+14.4e- - - 476.78~ .. CONT'D FROM 34 PIECE DET SPL INV DEFLECTION SLOPE INV QTY DESCRIPTION STATION ELEV PLAN NO. SHT HPL ( Ft ) DATA TANGENT ( Ft ) RFAD UP NOTE:READ UP DRAWN: NWB HANSON Concrete Products, Inc. CHIC BY: .NO. BY DATE REVISION DATE: 2-04-99 COPPELL, TEXAS I PROJECT= 98-133B SHEET= 35 F E B 12 1999 ISSUED FOR FA( RICATION coN?' D ON 37 106+36 · ?& 475.8~ ' CLASS 150 0.688 1 24" 8303 /88 D~ 15.751 0.0118 SHORT 15.75 106+21 · 02- -PULL 0 · 90°Dr~ ~ - - 475 · 61- ~ -- , VPI= 106+20.00 (0.92°Dn) (475.60} CLASS 150 1-57° I 24" 8303 B/88 32.00 0.0274 i , STD 31 · 99 105+89.03--PULL O.03"Dr~- 474.74 'U CLASS 150 1.60° I 24" 8303 /BB 1.78 0.0279 2-cut Bg~ . o 0~3 1.78 S G 40 ~I= 105+87.25- 45.00°Lt- 474.69. 44'98°Cb 1.53 1.S3 I 105+85.72- - 474.64- CLASS 150 1.60° i 24" 8303 /BB D3 19.52 0.0279 SHORT 19.51 105+66.21--PULL 0.59°UF 474.10 ~--7 · VPI= 105+37.25~ (6.31°Up) (473.29) w/6" FLG Tang OUT, LT OUT= 105+37,25~ CLASS 150 D(o 1.00" i 24" 8303 . /BB 32.02 0.0175 BEVEL. PI . o D I I 32.01 105+34.19 .B&P 5.72 °Up 473 · 5a~ U SPIGOT VIEW CONT'D FROM 35 DET SPL INV DEFLECTION SLOPE INV i . QTY DESCRIPTION STATION ELEV PLAN NO SHT HPL ( Ft ) DATA TANGENT ( Ft ) READ UP DRAWN: NWB HANSON Concrete Products, Inc. , . ~ BY: . REVISION DATE: 2-04-99 COPPELL, TEXAS I PROJECTs 98-1338 I SHEETS 36 H 0 H · 0~0~ O0 t,J,t~ O0 ..J..J ..I) ~.O II II I-~ I-' I.-,. I-~ ~ I-. I.-' I-,, ~0 + + + + + + + + -,,I IN3 · .. I~ .~ ,.,o,-, .o o Q L,'zJ ulq)  el) I ,-- I I I I I · -.- · .1~ · · · · ~ m I I I ~ I-.I -' 0 -, FEB 1 1999  IBGUEO FOR FAB[ ICATION co~' O ON 43 . ' 116+01.73- 483 · 4~. w/24" FLEX PROTEX w/EXTRA BC 189 LF TUNNEL CIASS 150 ~b DE)411)N : 3311 !24" B303 BS/BB D7 32.00 TkP SPC 32.00 115+69.73 ~ 483.13- - , --, w/EXTRABC CLASS 150 , 330 I 24" B303 BS/BB D7 32.00 SPC 32.00 _ _ _ · 115+37.73 482.81. ' *, CIASS 150 · ' BX329 I 24" B303 BS/BB DH 16.oo SHORT 16. O0 115+21.73 ..... 482.65 · ' CLASS 150 0.57e '328 i !24" B303 BS/BB 32.00 0.0100 STD 32.00 ' ' 114+89.73 .PULL 0.15°D~- 482.33 ',: ' ' W/1" THR OUT, UP OUT= 114+89.08 O CLASS 150 0.73e /t327 i 24" ADAPTOR FLG/BB DI~ 1.41 0.0127 1.41 114+88.32 .... 482.31. VPI= 114+88.00 (0.348Dn) (482.31) 0.73° 24" FIB BFV 0.67 0.0127 BY OTHERS. 0.67 { 114+87.6~ - - - 482 · 3(~ ' CONT'D FROM 41 . DESCRIPTION STATION ELEV PlAN NO. Slit HPL ( Ft ) DATA TANGENT ( Ft ) READ UP NOTE:READ UP DRAWN: NWB HANSON Concrete Products, Inc. CilK BY: I I ' NO. BY DATE REVISION DATE: 2-04-99 COPPELL, TEXAS PROJECT: 98-133B SHEETs 42