Royal Oaks-LR111103 (2) °(//16 0 /V5
Conatser Construction TX.LP
Fort Worth TX 76119
1. Royal Oaks Subdivision Coppell Texas, ATTN: Rick Odell
2. The purpose of this MEMO is to document Testing on SS Line A, Royal
Oaks Subdivision.
A. Air Test was completed on 2 November, 2011, from Station 0 +00
to Station 8 +60 in sections IAW Standard SS testing Procedures.
B. A test Mandrel was also completed without any Issues on 3 Nov,
2011.
C. Any questions can be directed to myself, Scott Nyre (817) 825-
4084.
Scott Nyre
Project Manager
4 2 q/AC Pit
WATER ENGINEERING & FISCAL SERVICES
VACUUM TEST MANHOLES
Line Stades a D
Holding Pass ss Fail! Date Manhole
Time Tested Not Tested
Example Line A 0 +00 48" 48" 0:40 0 ❑ 05/03/00 ❑
ato a �f / 0 ' G ' y o [J ❑ /1 6 3 /I ❑
AL
Y;, " /1' 0:tlo 5 ❑ /! a ❑
�_,►..� A r. ���s ' " �' o;ya i ❑ // del / - ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ o 0
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
D o 0
a 0
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
O 0 0
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
O ❑ 0