Loading...
Royal Oaks-LR111103 (2) °(//16 0 /V5 Conatser Construction TX.LP Fort Worth TX 76119 1. Royal Oaks Subdivision Coppell Texas, ATTN: Rick Odell 2. The purpose of this MEMO is to document Testing on SS Line A, Royal Oaks Subdivision. A. Air Test was completed on 2 November, 2011, from Station 0 +00 to Station 8 +60 in sections IAW Standard SS testing Procedures. B. A test Mandrel was also completed without any Issues on 3 Nov, 2011. C. Any questions can be directed to myself, Scott Nyre (817) 825- 4084. Scott Nyre Project Manager 4 2 q/AC Pit WATER ENGINEERING & FISCAL SERVICES VACUUM TEST MANHOLES Line Stades a D Holding Pass ss Fail! Date Manhole Time Tested Not Tested Example Line A 0 +00 48" 48" 0:40 0 ❑ 05/03/00 ❑ ato a �f / 0 ' G ' y o [J ❑ /1 6 3 /I ❑ AL Y;, " /1' 0:tlo 5 ❑ /! a ❑ �_,►..� A r. ���s ' " �' o;ya i ❑ // del / - ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ D o 0 a 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ 0