Loading...
SW0801-CS101207 Page 1 of 1 George Marshall - SW08-01 Denton Tap Sidewalk From:   George Marshall To:   roger_3dcontracting@verizon.net Date:   12/7/2010 3:24 PM Subject:   SW08-01 Denton Tap Sidewalk CC:   Michael Arellano Attachments:   Grade_Excavation.pdf   Roger,   This is in regards to the fill dirt placed on the property south of "Grow It".  We have your letter from the property owner giving permission for you to place fill dirt on the property.  There are several things we need... 1) Silt fence around the grading area and for you to abide by all necessary SWPP requirements. 2) A site grading permit be filled out for our records. (Plans are not necessary) 3) No fill dirt to be placed in the floodplain. 4) No tree removal. 5) Maintain existing drainage patterns.  I.e. Drain to east.   Thank You, George     George Marshall, PE City of Coppell Engineering 972-304-3562 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CFE51AFCity_...11/8/2011