ST9902-CN111108 Responsive Service. Reliable Results. /7' TEAGUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services 1. Scope of Work TNP shall provide professional civil engineering services, as outlined below, for completing the preparation of design plans for the West Sandy Lake Road reconstruction project. This modification is for additional services associated with the existing contract. The portion of roadway between North Coppell Road and South Coppell Road (also referred to as Phase 2A) is adjacent to Thweatt Park and entails the design of an 8 -foot wide trail that diverges away from the roadway and meanders through the park before connecting to a trail along South Coppell Road. The following are anticipated additions to the scope of work: • Additional meetings and correspondence with City representatives. • Additional topographic survey of the remainder of Thweatt Park to establish existing contours within the park and verify flowlines of creek, pond (two cross sections), headwalls, and pond outfall. • Additional tree survey of trees 6 -inch diameter and larger to help in defining grading and routing options that minimize impacts to existing trees within park. • Prepare plan for dredging of existing pond and grading plan to improve pond depth to approximately 10 -feet, and provide bank slopes for proper maintenance. Old PVC liner will be replaced with new clay liner. • Prepare plan for sizing and design of new pond outfall structure and discharge pipe to creek, and provide design for emergency spillway. • Plan modifications to reflect a revised trail alignment through the park based on pond design. • Prepare cost estimates for the above option and alternatives. 11. Project Schedule The work will generally proceed in conjunction with the remaining schedule for the West Sandy Lake Road project, as determined jointly by the City and TNP. It is anticipated that this phase will bid for construction in early 2012. 111. Compensation The Engineer shall be paid an additional lump sum fee for the above described Additional Scope of Services in an amount of Seventeen Thousand, and no /100 Dollars ($ 17,000). This amount includes the following increases: Additional Tree Survey $ 1,000 Additional Topographic Survey (w/ pond sections) $ 8,000 Additional Engineering Design $ 8,000 TOTAL $ 17,000 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 214.461.9867 phone 214.461.9864 fax www.tnp-online.com Fort Worth • Dallas • Denton • Sherman TEAGUE NALL AND PERKINS, INC. Opinion of Probable Construction Cost CONSULTING ENGINEERS Client: City of Coppell Date: 11/8/2011 Project: Pond at Thweatt Park - Sandy Lake Road and South Coppell Road Prepared By: KAB TNP No.: CPL00243 Checked By: CBS Title: COST OPINION FOR POND OPTIONS Sheet: 1 of 3 (Sheet Number Item Description Total Cost 2 OPTION #1 - REGRADE POND AND RECONSTRUCT OUTFALL $ 269,000 3 OPTION #2 - FILL POND AND EXTEND 72" RCP $ 314,000 TOPOGRAPHIC SURVEY ENGINEERING DESIGN Basis for Cost Projection: (J No Design Completed ,:,] Preliminary Design Final Design TEAGUE NALL AND PERKINS, INC. Opinion of Probable Construction Cost CONSULTING ENGINEERS Client: City of Coppell Date: 11/8/2011 Project: Pond at Thweatt Park - Sandy Lake Road and South Coppell Road Prepared By: KAB TNP No.: CPL00243 Checked By: CBS Title: OPTION #1 - REGRADE POND AND RECONSTRUCT OUTFALL Sheet: 2 of 3 II No. Spec Item Item Description Quantity Unit Unit Cost Item Cost I 11 -1 Excavate and Remove Existing P\/„Q Liner 50,000 SF $ 0.25 $ 12 500.00 11 -2 Silt Excavation & Haul -off 4 k_sA „..j 9,000 CY $ 15.00 $ 135 000.00 # 11-3 Install 12” Thick Clay Liner 50,000 SF $ 0.60 $ 30,000.00 11 -4 Stand Pipe with Grate 1 LS $ 3,500.00 $ 3,500.00 11-5 36" RCP 360 LF $ 75.00 $ 27,000.00 11-6 36" Headwall 1 LF $ 3,000.00 $ 3,000.00 11 -7 Trench Safety 360 LF $ 2.00 $ 720.00 11-8 Remove Existing stand pipe & plug 1 EA $ 500.00 $ 500.00 11-9 Irrigation (repair existing) 1 LS $ 5,000.00 $ 5,000.00 ' 11-10 Hydromulch & Sod 1 LS $ 12,000.00 $ 12,000.00 11-11 18" RCP 30 LF $ 55.00 $ 1,650.00 11-12 Safety End Treatment (18 ") 2 EA $ 1,500.00 $ 3,000.00 - SLS -fnr W•?i1i -ction' Subtotal: $ 233,870 ❑ No Design Completed Conting. ( %, + / -) 15 $ 35,130 El Preliminary Design 'Total: II $ 269,000 ❑ Final Design This total does not reTiect engineering or technical services. TEAGUE NALL AND PERKINS, INC. Opinion of Probable Construction Cost CONSULTING ENGINEERS Client: City of Coppell Date: 11/8/2011 Project: Pond at Thweatt Park - Sandy Lake Road and South Coppell Road Prepared By: KAB TNP No.: CPL00243 Checked By: CBS Title: OPTION #2 - FILL POND AND EXTEND 72" RCP Sheet: 3 of 3 No. Spec Item Item Description Quantity Unit Unit Cost Item Cost 11 -1 Pipe - 24" RCP (Subtract) -400 LF $ 65.00 $ (26,000.00) 11 -2 Pipe - 24" RCP (Add) 245 LF $ 65.00 $ 15,925.00 _ 11 -3 Pipe - 30" RCP (Subtract) -180 LF $ 70.00 $ (12,600.00) 11 -4 Pipe - 72" RCP (Add) 35 LF $ 220.00 $ 7,700.00 11 -5 Pie - 78" RCP Add 485 LF $ 260.00 $ 126,100.00 11 -6 30 Headwall (Subtract) -1 EA $ 2,500.00 $ (2,500.00) 11 -7 78" Headwall (Add) 1 EA $ 7,000.00 $ 7,000.00 11 -8 4'x4' Manhole (Subtract) -1 EA $ 3,000.00 $ (3,000.00) 11-9 Remove Existing 72" Headwall & Rip -Rap 1 EA $ 3,000.00 $ 3,000.00 11-10 Lower 12" Water line 1 EA $ 6,000.00 $ 6,000.00 11 -11 Place and compact Fill 7,800 CY $ 15.00 $ 117,000.00 11-12 Trench Safety 185 LF $ 2.00 $ 370.00 11 -13 Remove Existing stand pipe & plug 1 EA $ 500.00 $ 500.00 11-14 Irrigation (new & repair) 1 LS $ 15,000.00 $ 15,000.00 11 -15 Hydromulch & Sod 1 LS $ 18,000.00 $ 18,000.00 R,asic.fnr_CAM.Prninction: Subtotal: $ 272,495 ❑ No Design Completed Conting. ( %, + / -) 15 $ 41,505 le Preliminary Design (Total: 11 $ 314,0001 ❑ Final Design This total does not reflect engineering or technical services.