Re: L edie Tract Development Coordination — NEC of Bait Line Read and
lHackberry Road
Dear Mr. Ramsey:
As you develop your property in Coppell, which is adjacent to Billingsley
Company's property in Dallas, Billingsley has requested the following provisions
as it affects Billinpley Company's. If you agree with these provisions, please
sign the acceptance block below and return to me:
Storm Drainase:
It i4 understood that the Leslie Tract plans to drain storm water onto Billingsley's
property to the north. The Leslie Tract development shall:
I. Detain all developed drainage flows to match current undeveloped
conditions.
2. Relau concentrated detained drainage flow, calculated to be 85 cis, at
the northeast corner of the Leslie Tract (see attached Exhibit A).
3. It K- recokmized that temporary grading will be required on the
Billingsley property to accommodate that flow, but note that a permanent
easement is not anticipated. You shall comply with the following:
a. Construction will be for grading purposes only. You will
provide appropriate erosion control and restoration of disturbed
property.
b. The temporary grading will follow the limits of grading and the
amount of grading as shown on the Pacheco Koch Consulting
Engineers plan dated September 49, 2011 (see attached Pacheco
Koch plan).
c. You will also contact James Lockridge at (214) S00 -4871 prior
to construction to assist in the protection of livestock on
Billingsley property.
d. You will provide temporary fencing during construction
adequate to control livestock.
e. Your will provide full restoration of the property fence after
coordination with James Lockridge and disntption of the
property fence is complete.
f. If any issues arise with the livestock on Billingsley's property
(i.e. livestock exits premises), then the Leslie Tract will be held
liable.
K:NDAL Cive1063973W2-CypmssWnwsl4wc 1MdminU.a iioTM K=4hnotiioO4XRcvismL'}dw
20%10 - 3108 » fax P Ill
g Grading and fuU fence restoration must be complete by midnight
on January 31 ', 2012, subject to force majeure or delays caused
by the City of CoppelI.
h. You will provide Billingsley Company a past eort truetion
Record Survey of the improvements on Billingsley's property
and upstream 50 feet within your prolmy.
4. Provide an appropriate storm water quality control device via a wet
detention pond for all drainage from gas stations and other individual
developments on the property.
WaACW&W
The City of Coppell is requiring the wastewater flow generated from the Leslie
Tract and from Billingsley Company's property be combined into one (1)
wastewater line for one (1) bom crossing across Bch Line Road in lieu of two (2)
separate bore crossings. It is anticipated that Billingsley's property will generate
approximately 1250 GPM and is to discharge into the City of Coppell system in
Belt Line Road According to your Engineer's calculations, it is anticipated that
the Leslie Tract will generate approximately 536 GPM, and is also to discharge
into the same City of Coppell system in Belt Line Road, The Leslie Trace will
retain the right to any excess sanitary sewer capacity above the combined 1254
GPM from Billingsley and 536 GPM from the Leslie Tract projected to flow
through the proposed 15" line.
Billingsley Company plans to tic its wastewater main into the Leslie Tract
wastewater main at a manhole installed by the Leslie Tract as shown on attached
Exhibit B. The downstream wastewater main after the combined flow of 1250
GPM and 536 GPM will treed to be a 15" wastewater main in lieu of the 12"
wastewater main that is currently proposed by you. This 15" wastewater main
will extend 1430' north along Belt Lim Road, then bore across Belt Line Road to
an existing manhole at an existing 15" City of Coppell wastewater line (see
attached Exhibit B). Billingsley Company will agree to pay for one - half the
actual coat of this construction downstream of the shared manhole, which total
cost is estimated to be $50,152.50, based on your OPC dated September 2, 2011.
In the event Billingsley has to construct this downstream connection due to
schedule requirements, then Billingsley will utilize the Leslie Tract Engineer's
City approved plans for construction, and you will agree to reimburse, at time of
connection, one -half the cost of actual construction of this downstream
improvement. You will not be responsible for the sanitary sewer design within
Billingsley's property of obtaining permits to allow Billingsley's use thereof.
Regards,
SILLINCSLEYCOMPAIVY Arc ed_Bv
e: Nam
William Q. Walker
Senior Vice President Tit 1 C rL !� ✓�
KADAL. C'iVO\%3973002d')prassWv1wx 4mw I\Adning c4ieTfadCouWim iuit4XRevlsed?}do,
Pa I of 2
Rhonda Ad loo - Fwd: FW: SR Si Billin A - Adobe Acrobat
Standard
From: Michael Garza
To: Rhonda Adloo
Date: 11/9/2011 11:07 AM
Subject: Fwd: FW: SR Si Billin A - Adobe Acrobat Standard
Attachments: DOC125.PDF
Can y ou place this in the lesle retail addition file? (East Dividend Drive)
thanks,
Mike
>>> On 11/7/2011 at 8:48 AM, in messa
<958CDOF66DOF804682391360997E27E202786823@EXlPKDAL.pkce.com>, "Ja C. London"
<jlondon@pkce.com> wrote:
Mike,
Please find attached the letter of a between our client and the Billin propert pertainin to
dischar of draina and g radin g on the Billin propert
Thanks, JCL
Ja C. London, P.E.
Senior f:'roject Mana
8350 N. Central Ex Y, Suite 1000
Dallas, Texas 75206 -1612
P- 972.235.3031 �� F- 972.235.9544
From: brad.moss@kimle [maiIto:brad.moss@kimle
Sent: Tuesda November 01, 2011 1:55 PM
To: Ja C. London lack Evans
Subject: FW: SR Si Billin A - Adobe Acrobat Standard
Attached is the full executed Letter. Please forward on to y our client for records.
Itradle Moss, PE ( TX, OK, Nc LEED8 AP
file: 11C: \Documents and Settin Settin EF 8 Cit 11/9/2011
Pa 2 of 2
Dallas,Texas 75251
Ph- 972-770-1300 Fax- 972-239-3820
*rad.moss@kimle -
file: 11C: \Documents and Settin Settin EF 8 Cit 11/9/2011