ST8402-CN 890403"-~ CllANGE ORDEI~ ~ (Inslructiof~,.on reverse side) No. PROJECT: OWNER: (Name. Address) Denton Tap Road Improvements DATE OF ISSUANCE: from Sandy Lake Rd. to Denton Creek City of Coppell P.O. Box 478 Coppell, TX 75019 April 5, 1989 CONTRACI'OI~,: L.H. Lacy Co. OWNER's Project No. P.O. Box 541297 Dallas, TX 75354-1297 ENGINEER: Ginn, Inc. Consulting Engineers 17103 Preston Rd., Suite 100. CONTRACT FOR: Denton Tap Road Improvements Dallas, TX 75248 from Sandy Lake Rd. to Denton Creek ENGINEER's Project No. 379 You are directed It} make the following changes in the Contract Documents. Description: See Attachment "A" Purpose of Change Order: See ^ttachment "A" Attachments: (List documents snpporting change) 1) c.o. #1 2) Ginn, Inc. letter to 5) L.H; Lacy Co. letter L.H. Lacy Co. dated 1/31/89 to Ginn, Inc. dated 1/14/89 CIIANGE IN CONTRACT PI*,ICE: Original Contract Price $ 1,789,363.03 (estimated) Previous Change Orders No. 1 to No. & Field Changes 1 through 5 $ 4,489,83 (estimated) Contract i'ricc prior to this Change Order $. 1,793,852.86 (estimated) Net Increase ~ of this Change Order $ 6,808.00 (estimated) Contract Price with all approved Change Orders $. 1,800,660.86 (estimated) CI1ANGE IN CONTRACI' TIME: Original Contract Time 365 day.~ or dale Net change from previous Change Orders + 10 Conlract Time l'rior lo this Change Order 375 days m' dale Net Increase (decrease) of this Change Order increase 14 Contract Time with all approved Change Orders 389 tla¥~, ul dale Al'lq D: 'I~ROV F.I): Ih'¢pmcd by the F. nginccrs' Joi.t (?tml;'act I)ociliilciit~, ('o.lmiller aild c.dorscd by The A~,socialcd (teller;il ('olllraCtOl",l of America. Denton Tap Road Improvements from Sandy Lake Road to Denton Creek Change Order No. 3 EXHIBIT A Description= Nullify Change Order No. 1. Restore Pay Items 260, 264, and 641.1 to their Original Descriptions and Original Contract Unit Prices. Purpose of Change Order: The Contractor voluntarily abandoned Cement Treatment of Subgrade on this project as a result of difficulties encountered in achieving specified compaction on the Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road project. All subgrade treatment on this project to date has been performed under the Original Specifications for Lime Treatment, materials in place. The Contractor requests restoration of the Original Contract Unit Prices and Specifications pertaining to subgrade treatment.