ST8402-CN 890403"-~ CllANGE ORDEI~ ~
(Inslructiof~,.on reverse side)
No.
PROJECT:
OWNER:
(Name.
Address)
Denton Tap Road Improvements DATE OF ISSUANCE:
from Sandy Lake Rd. to Denton Creek
City of Coppell
P.O. Box 478
Coppell, TX 75019
April 5, 1989
CONTRACI'OI~,: L.H. Lacy Co. OWNER's Project No.
P.O. Box 541297
Dallas, TX 75354-1297 ENGINEER: Ginn, Inc. Consulting Engineers
17103 Preston Rd., Suite 100.
CONTRACT FOR: Denton Tap Road Improvements Dallas, TX 75248
from Sandy Lake Rd. to Denton Creek
ENGINEER's Project No. 379
You are directed It} make the following changes in the Contract Documents.
Description: See Attachment "A"
Purpose of Change Order: See ^ttachment "A"
Attachments: (List documents snpporting change)
1) c.o. #1
2) Ginn, Inc. letter to
5) L.H; Lacy Co. letter
L.H. Lacy Co. dated 1/31/89
to Ginn, Inc. dated 1/14/89
CIIANGE IN CONTRACT PI*,ICE:
Original Contract Price
$ 1,789,363.03 (estimated)
Previous Change Orders No. 1 to No.
& Field Changes 1 through 5
$ 4,489,83 (estimated)
Contract i'ricc prior to this Change Order
$. 1,793,852.86 (estimated)
Net Increase ~ of this Change Order
$ 6,808.00 (estimated)
Contract Price with all approved Change Orders
$. 1,800,660.86 (estimated)
CI1ANGE IN CONTRACI' TIME:
Original Contract Time
365
day.~ or dale
Net change from previous Change Orders
+ 10
Conlract Time l'rior lo this Change Order
375
days m' dale
Net Increase (decrease) of this Change Order
increase 14
Contract Time with all approved Change Orders
389
tla¥~, ul dale
Al'lq D: 'I~ROV F.I):
Ih'¢pmcd by the F. nginccrs' Joi.t (?tml;'act I)ociliilciit~, ('o.lmiller aild c.dorscd by The A~,socialcd (teller;il ('olllraCtOl",l of America.
Denton Tap Road Improvements
from Sandy Lake Road to Denton Creek
Change Order No. 3
EXHIBIT A
Description=
Nullify Change Order No. 1. Restore Pay Items 260, 264, and
641.1 to their Original Descriptions and Original Contract Unit
Prices.
Purpose of Change Order:
The Contractor voluntarily abandoned Cement Treatment of Subgrade
on this project as a result of difficulties encountered in
achieving specified compaction on the Denton Tap Road
Improvements from Belt Line Road to Sandy Lake Road project. All
subgrade treatment on this project to date has been performed
under the Original Specifications for Lime Treatment, materials
in place. The Contractor requests restoration of the Original
Contract Unit Prices and Specifications pertaining to subgrade
treatment.