Loading...
ST8402-CN 890317(Idslrucfions on rcvcrsc side) CIIAN(;E ORi)I,:I( I'ROJECI': Denton Tap Road Improvements from Sandy Lake Road to Denton Creek OWNER: City of Coppell (Na,,,c. P.O. Box 478 Addrcss) Coppell, TX 75019 I)ATF, OF ISSUANCE: March 17, 1989 CONTRAC~i'OR: L.H. Lacy Co. OWNF. IUs I','ojccl No. P.O. Box 541297 Dallas, TX 75554-1297 EN(;INI.:I~.R: Ginn, Inc. 17105 Preston Road, CONTRACI' FOIl: Denton Tap Road Improvements Dallas, TX 75248 from Sandy Lake Road to Denton Creek I'~NGINEI'.'R's I'rojccl No. 379 Suite 100 You ;irc directed Io m;ikc Iht ft)llowing changes ill Ihe Co,llrnct I)ocmncnls. i)cscription: See Attachment "A" i'urpose of Change Order: See Attachment "A" Allnchments: (I.isl documents supporting change) See Attachment "A" Ci IANGF. IN CONTRACT I'RICIk Original Contract I'ricc $ 1,789,363.03 (estimated) I'rcvious Chllli~ Orders No. 1 · and Field Changes No. $ 2,126.05 (estimated) h, No. 1 toNo. Conlracl Ih'icc prior to Ihis Chnngc Order $. 1,791,489.06 (esti~ted) Ncl Increase (dl~l~g~ I,f Ihis Change Order $ 52,081.27 Cest~-nated~ Colllracl I'rice wilh all approved Ch;mgc O,'dcrs $ 1,843,S70.33 (estimated) 1 CI IAN(;F. IN CON'I'RACF TIMF.: Original Ctmlracl Thne 365 calendar days Nc! change frmn prcviol,s Change Orders -0- Conh':lcl Time I'rior to this Change Order 36S calendar days Ncl Increase (decrease) of IhJs Change Order 10 ¢lay~ Colllr;Icl Ti,nc with :ill approved Change (),'dc,'s 37S calendar days RF. COM M F.N i)F,I): by/ ' '- /- F. JCI)C No. 1910-X-Il (1983 Edition) AI'I'ROVI~.I): AI'I'I(OVF. D: I'lrpplt'd hy IJil.' I~ngineer~' JOilll ('4llilf;icl J)octlm¢lll~ ('oluntillee and cn,Jol~ed I,y 'Jim A~.cialcd (;en¢~al {',illll;it'lOlt~ or Alneli¢:l. ATTACHMENT DESCRIPTION: Construct: Median openings at stations 182+44, 186+98 and 195+28; northbound left-turn lanes with the median openings at stations 182+44, 186+98 and 195+28; southbound left-turn lanes with the median openings at stations 178+17.77 and 195+98; and the west turnout for Parkway Blvd.; all in accordance with the drawings in the attached Drawing List and the Specifications. PURPOSE OF CHANGE ORDER: To provide access to planned developments on the adjacent properties. ATTACHMENTS: (List documents supporting change) 1.) 2.) 3.) 4.) 5.) Estimated Costs of Construction Drawing List Transmittal letter for drawings issued to Contractor on 1/17/89 L.H. Lacy Co. letter to Ginn, Inc. dated 2/27/89 Ginn, Inc. letter to L.H. Lacy Co. dated 3/17/89 J379C02 DENTON TAP ROAD IMPROVEMENTS from SANDY LAKE RD. to DENTON CREEK ESTIMATED COST OF ABQ DEV. AND UHIVEST DEV. REQUESTED MEDIAN OPENING AND LEFT TURN LANES 3 - 17 - 1989 CHANGE ORDER NO. 2 STATION 178+17.77 - SOUTHBOUND LEFT TURN LANE FOR UNIVEST DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT I 110 160 16& 260 26& 26&.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT Roadway Excavation PLace Topsoil - Median (6" thick) Broadcast Seeding (Common Berm) Lime treatment, mat. in place Lime slurry, Ty A., 5~ 22.5 #/ay Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 8" conc. pavement 3000 psi 6" Monolithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-sLipform) 6" conc. (Driveways & Median Noses) 6"x6" Jiggle Bar (refL.)(Type 1-C) 4" Traffic Button, ~hite(Non-RefL.)(P-7-U) 14. Traffic Button, ~hite(sing.-Reft.)(P-15-U) 2" PVC conduit (ach. 40) 3" PVC conduit (ach. 40) ~" PVC conduit (ach. 40) Puttboxes CY SY SY SY TON TON SY LF IsY IsY lEA lEA lEA ILF ILF ILF lEA 29.9 -147.09 -147.09 179.48 0 3.05 0 15.14 179.41 -32.31 10 0 0 -14.48 -7.2~ -7.24 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 $2.00 $6.00 $2.40 $3.00 S3.73 $127.00 $197.3~ ($73.55) ($61.78) $188.45 S0.00 S192.15 S0.00 $15.14 S2,992.56 ($775.44) $50.00 $0.00 $0.00 ($34.75)1 ($21.72)1 (S27.01)I so.oo I SUBTOTAL S2,641.40 STATION 182+44 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. XTE. I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT I BASE BID 6 LANE PAVEMENT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 Roadway Excavation ICy PLace Topsoil - Median (6" thick) ISY Broadcast Seeding (Common Berm) ISY Lime treatment, mat. in place IsY Lime slurry, Ty A., 5~ 22.5 #/sy ITOH Lime slurry, Ty A., 5~ 34 #/ay (9" Thick) ITOH 8" conc. pavement 3000 psi IsY 6" MonoLithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-sLipform) ISY 6" conc. (Oriveways & Median Noses) ISY 6"x6' Jiggle Bar (refL.)(Type 1-C) lEA 4" Traffic Button, ~hite(Non-Reft.)(P-7-~) lEA 4" Traffic Button, ~hite(sing.-RefL.)(P-15-~) lEA 2" PVC conduit (Sch. 40) {LF 3" PVC conduit (Sch. 40) ILF 4" PVC conduit (Sch. 40) ILF Puitboxes lEA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.84 181.2 58.57 0 -16 -16 119 119 119 4 S6.60 $0.50 $0.42 S1.05 S67.00 $63.00 S13.68 $1.00 $16.68 S24.00 $5.00 $2.00 $6.00 $2.40 $3.00 S3.73 $127.00 $188.30 ($119.90) (S100.71) S176.26 S0.00 $179.55 $0.00 (S179.84){ S3,022.42 $1,405.68 $0.00 ($32.00) ($96.00) S285.60 $357.00 $443.87 $508.00 SUBTOTAL $6,038.23 J379C02 STATION 182+44 ' NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT I Roadway Excavation ICY PLace Topsoil - Median (6" thick) ISY Broadcast Seeding (Common Berm) ISY Lime treatment, mat. in place ISY Lime slurry, Ty A., 5~ 22.5 #/sy ITON Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) ITON 8" conc. pavement 3000 psi IsY 6" MonoLithic Curb (3000 psi) ILF 8"' conc. pavement 3000 psi (non-sLipform) ISY 6" conc. (Driveways & Median Noses) ISY 6'x6" JiggLe Bar (refL.)(Type 1-C) lEA ~"' Traffic Button, ~hite(Non-RefL.)(P-7-~) lEA &" Traffic Button, Uhite(sJng.-RefL.)(P-15-g) lEA 2" PVC conduit (Sch. 40) ILF 3" PVC conduit (Sch. 40) ILF ~" PVC conduit (Sch. 40) ILF PuLLboxes lEA 33.44 -226.87 -226.87 200.68 0 3.41 0 -44.? 200.61 26.26 10 0 0 0 0 0 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 $2.00 $6.00 $2.40 $3.00 S3.73 $127.00 $220.70 ($113.44) ($95.29) $210.71 $0.00 $214.83 $0.00 ($44.70) $3,346.17 $630.24 $50.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUBTOTAL $4,419.24 STATION 186+98 - MEDIAN OPENING FOR UNIVEST DEV. AND ABQ DEV. ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT ========================================================================================================= 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 {BASE BID 6 LANE PAVEMENT {Roadway Excavation {PLace Topsoil - Median (6" thick) IBroadcast Seeding (Common Berm) ILime treatment, mat. in place ILime slurry, Ty A., 5~ 22.5 #/sy {Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 8" conc. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-sLipform) 6" conc. (Driveways & Median Noses) 6"x6" JiggLe Bar (reft.)(Type 1-C) 4" Traffic Button, ghite(Non-Reft.)(P-7-g) 4" Traffic Button, ~hite(sing.-Reft.)(P-15-~) 2" PVC conduit (Sch. 40) ~" PVC conduit (Sch. 40) &" PVC conduit (Sch. PuLLboxes CY SY SY SY TON TON SY LF SY SY EA EA EA LF LF LF EA 28.53 -239.79 -239.79 167.87 0 2.85 0 -179.8~ 181.2 58.57 0 -16 -16 119 119 119 $6.60 $0.50 S0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 $24.00 $5.00 $2.00 $6.00 $2.40 $3.00 $3.73 $127.00 $188.30 ($119.90) ($100.71) $176.26 $0.00 $179.55 $0.00 ($179.84) $3,022.42 $1,405.68 $0.00 ($32.00) (S96.00) $285.60 $357.00 $443.87 $508.00 SUBTOTAL $6,038.23 J379C02 STATION 186+98 - NORTHBOUND LEFT TURN LANE FOR ABQ DEV. (100' STORAGE) ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT ========================================================================================================= 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 6?6.2 618.1 618.2 618.3 IBASE BID 6 LANE PAVEMENT ~Roadway Excavation [PLace Topsoil - Median (6" thick) IBroadcast Seeding (Common Berm) ILime treatment, mat. in place Lime slurry, Ty A., 5~ 22.5 #/sy Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 8" conc. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-sLipform) 6" conc. (Driveways & Median Noses) 6"x6" JiggLe Bar (ref[.)(Type 1-C) 4" Traffic Button, Uhite(Non-RefL.)(P-?-U) 4" Traffic Button, Uhite(sing.-Ref[.)(P-15-~) 2" PVC conduit (Sch. &O) 3" PVC conduit (Sch. 40) 4" PVC conduit (Sch. 40) Pu[Lboxes CY SY SY SY TON TON SY LF SY SY EA EA EA LF LF LF EA 33.44 -226.87 -226.87 200.68 0 3.41 0 200.61 26.26 10 0 0 0 0 0 0 S6.60 S0.50 S0.42 S1.05 $67.00 S63.00 S16.68 S1.00 $16.68 $24.00 $5.00 $2.00 $6.00 $2.40 S3.00 S3.73 $127.00 S220.70 (S113.44) (S95.29) S210.71 S0.00 S214.83 $0.00 ($44.70) $3,346.17 $630.24 S50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUBTOTAL $4,419.24 STATION 195+28 MEDIAN OPENING FOR ABQ DEVELOPMENT ITEM J DESCR[PTION I UTS I QUANTITY [ UNIT PRICE I AMOUNT 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT Roadway Excavation ICY PLace Topsoil - Median (6" thick) ISY Broadcast Seeding (Common Berm) ISY Lime treatment, mat. in place IsY Lime slurry, Ty A., 5~ 22.5 #/sy Lime slurry, Ty A., 5~ 34 #/sy (9" Thick) 8" conc. pavement 3000 psi ISY 6" MonoLithic Curb (3000 psi) {LF 8" conc. pavement 3000 psi (non-stipform) {SY 6" conc. (Oriveways & Median Noses) ISY 6"x6" JiggLe Bar (ref[.)(Type 1-C) lEA 4" Traffic Button, ~hite(Non-Reft.)(P-7-~) lEA 4" Traffic Button, ~hite(sing.-RefL.)(P-15-U) lEA 2" PVC conduit (Sch. 40) {LF 3" PVC conduit (Sch. 40) ILF 4" PVC conduit (Sch. 40) ILF Pu[Lboxes lEA 26.6? -160 -160 146.67 1.65 0 0 -120 160 0 0 -16 -16 111 111 111 $6.60 $0.50 $0.42 $1.05 S67.00 S63.00 $13.68 $1.00 $16.68 S24.00 $5.00 $2.00 $6.00 $2.40 $3.00 $3.73 S127.00 $176.02 ($80.00) ($67.2O) S154.00 S110.55 $0.00 $0.00 ($120.00) S2,668.80 I S0.00 $0.00 ($32.00) ($96.00) $266.40 $333.00 $414.03 $508.00 SUBTOTAL $4,235.61 J379C02 STATION 195+28 NORTHBOUND LEFT TURN LANE (80' STORAGE) FOR ABQ DEVELOPMENT ITEM I DESCRIPTION I UTS I GUANTITY I UNIT PRICE I AMOUNT I 110 160 16~ 260 26& 26&.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT Roadway Excavation PLace Topsoil - Median (6" thick) Broadcast Seeding (Common Berm) Lime treatment, mat. in place Lime slurry, Ty A., 5~ 22.5 #/sy Lime slurry, Ty A., 5~ 3~ #/sy (9" Thick) 8" conc. pavement 3000 psi 6" MonoLithic Curb (3000 psi) 8" conc. pavement 3000 psi (non-sLipform) 6" conc. (Driveways & Median Noses) 6"x6' JiggLe Bar (reft.)(Type 1-C) &" Traffic Button, Uhite(Non-Ref[.)(P-7-~) 4" Traffic Button, Uhite(sing.-Ref[.)(P-15-U) 2" PVC conduit (Sch. 3" PVC conduit (Sch. 40) ~" PVC conduit (Sch. ~0) PuLLboxes I IcY IsY IsY IsY ITON ITON sY LF SY SY EA EA lEA ILF ILF ILF lEA 29.7~ -20~.65 -20~.65 178.~6 0 3.03 0 -~5.36 178.38 26.26 8 0 0 0 0 0 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 $1.00 $16.68 524.00 $5.00 $2.00 $6.00 52.40 $3.00 $3.73 $127.00 S196.28 (S102.33) (585.95) $187.38 $0.00 $190.89 $0.00 ($45.36) $2,975.38 $630.24 540.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUBTOTAL $3,986.54 STATION 195+28 SOUTHBOUND LEFT TURN LANE (100' STORAGE) FOR ABQ DEVELOPMENT ITEM I DESCRIPTION I UTS I QUANTITY I UNIT PRICE I AMOUNT I 110 160 164 260 264 264.1 360.1 360.2 360.6 530.1 672 676.1 676.2 618.1 618.2 618.3 624 BASE BID 6 LANE PAVEMENT Roadway Excavation IcY PLace Topsoil - Median (6" thick) ISY Broadcast Seeding (Common Berm) ISY Lime treatment, mat. in place ISY Lime sLurry, Ty A., 5~ 22.5 #/sy ITON Lime slurry, Ty A., 5~ 3~ #/sy (9" Thick) ITON 8" conc. pavement 3000 psi ISY 6" MonoLithic Curb (3000 psi) ILF 8" conc. pavement 3000 psi (non-stipform) IsY 6" conc. (Driveways & Median Noses) ISY 6"x6" JiggLe Bar (refL.)(Type 1-C) &" Traffic Button, ~hite(Non-Ref[.)(P-7-~) lEA ~" Traffic Button, Uhite(sing.-RefL.)(P-15-U) lEA 2" PVC conduit (Sch. ~0) ILF 3" PVC conduit (Sch. &O) ILF &" PVC conduit (Sch. &O) PuL[boxes lEA 25.76 -180.84 -180.84 154.65 1.74 0 0 -&5.36 154.58 26.26 10 0 0 0 0 0 0 $6.60 $0.50 $0.42 $1.05 $67.00 $63.00 $13.68 51.00 $16.68 524.00 $5.00 $2.00 $6.00 S2.~0 S3.00 53.73 $127.00 S170.02 ($90.&2) (S75.95) S162.38 $116.58 $0.00 $0.00 (545.36) S2,578.39 $630.2~ $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUBTOTAL $3,495.88 J379C02 EST]HATED COST OF ADDITION OF UEST SIDE TURNOUT AT THE DENTON TAP RD./PARKWAY BLVD INTERSECTION (CITY OF COPPELL) ]TEH I DESCR]PT]O# I UTS I QUANTITY I UNiT PRICE I AHOUNT I 100 110 131 133 260 264.1 360.2 360.3 360.4 530.1 530.2 530.3 618.2 62& 666.1 BASE BID 6 LANE PAVEHENT Prepare R.O.W. Roadway Excavation Borro~ (Detiv.)(d.c.),Type B, Ct.3 Remove/Replace unstabte material iLime treatment, mat. in place Lime sturry, Ty A., 5~ 34 #/sy (9" Thick) 6" gonotithic Curb (3000 psi) Concrete street header 8" Conc. Pavement Int. Streets 6" conc. (Driveways & Hedlan Hoses) Brick pavers (Uni-Decor) Brick pavers (Hot[and I) 3" PVC conduit (Sch. 40) Pu[tboxes 18" Stop Bar I ISTA CY CY CY SY TON LF LF SY SY SY SY LF 0.35 0 0 0 385 6.6 42 60 370 17 168 17 898 10 34 $~,051.00 $6.60 $0.10 $5.OO $1.05 $63.00 $1.00 $3.00 $16.00 $24.00 $21.00 $21.00 $3.00 $127.00 $5.00 $1,417.85 $0.00 $0.00 $0.00 $404.25 $415.80 $&2.00 $180.00 $5,920.00 S408.00 S3,528.00 $357.00 S2,694.00 $1,270.00 $170.00 SUBTOTAL $16,806.90 Sheet No, 3 13 14 15 16 17 24 25 26 27 28 DRAWING LIST DENTON TAP ROAD IMPROVEMENTS FROM SANDY L~KE ROAD TO DENTON CREEK CHANGE ORDER NO. 2 Description Sheet Index and Summary of Quantities Paving Sta. 174+00 to 179+00 Paving Sta. 179+00 to 184+00 Paving Sta. 184+00 to 189+00 Paving Sta. 189+00 to 194+00 Paving Sta. 194+00 to 199+00 Drainage Sta. 174+00 to 179+00 Drainage Sta. 179+00 to 184+00 Drainage Sta. 184+00 to 189+00 Drainage Sta. 189+00 to 194+00 Drainage Sta. 194+00 to 199+00 Revision NO. 5 3 2 3 4 4 4 3 4 5 6 P GINNo INC. Consulting Engineers i7103 Preston Road Suite ]00. LB-Il8 DALLAS. TEXAS 75248 · (2].4) 248-4000 1 ~:,".' [] Shop drawings '1-1 Prints Plans [] Samples VI Specifications .... · ,. ,, [] Copy of letter [] Change order '[] DATE NO. DESCRIPTION '~!~!~ ~ -~1~.~, si,,,.,...~- ~,,/,? .~ ' .... ~.,/~.Z~ ~ I(,/~, /~ /, 1,42/~n ,, :.'~W~¢.' rZA.~ ,, ,, ~¢~.,,~, , ,, as checked below: [] Approved as submitted [] Approved as noted I-I Returned for corrections 19 [] Resubmit PI Submit [] Return copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US )rOYal '~or'YOur use Uested I~ iF bi; reVlew and comment ?:,}.D' Fo'R BIDS DUE 1'7 10.3 F'RI~EST'ON SLIIT'E ].00. /..,IF-.118 I.)AL..L..A~'~ ~ ;;' ,' · II .... A,.~ ~:,i~!::~'..!i'~)l'.l 'f,:~,~.'..' P?,.J;'d) Ir"IF"F?O'..,gi}:ME, N"I' FROM SAND"Y L, AI<:[{ TO DE:N"I'Ohl f::REEK i'''''~ t'':~'T ~ .......... ,. < '.:.!i 79 ) l I.I. I.. Pd.': Y ,,J i. ,..L Al i)l::( l:'i!i E! 'f'O CI-..IANi.iJE (.)I:~I)ER '::.',, PR(:)',/I I)ED L-] I Nlq., I NC · , AP, H) "f'l.lE C]:"I'Y ['I1:'. .... "])~.I..I:.L..L. WIL. L A['~REE 'I'D THE FOL. LOWING: 1) /.:~!i:; Y!]!..i S'f'A'f'E:D IN YOUR LE"I"TER, THIS CHANGE ORDER INCREASES 'l"Hlii:i SCOPE OF 140R,kl, THAT IhlCRE~.ISED SCOF'E OI:-- WORK IS AN :I:t"JCI:Y~F:ASE I/iF 2.66%, CALCULATED BY ES'FIMA'I'ED DOLLAR VOLUMES I....ISTli!i]:.> ON 'TI..IE I::'AC!!!:. OF' THE f.',H(iINGE £]I:?DE[.~. FOR THIS iNCF,'EASED SCOI';~E OF::' W[]RK L.. H. LACY NEEDS :10 CALENDAR DAYS ADDED 'TO ]'I..t!Z:.: C'ONTRA[:T T I ML:.. ,, 2) "l'l"l:l:!i~; INCREA!.!~i!i:I') SCL)PE.: L3F' WORK ALSO CHANGES THE SCOF'D' OF WORK 1:':1'31:'/ "1 FIE L · I"1. LACY Ct']MF"ANY. Iii JR I N l T ! Al.. El I D F'R I Cl.:.': f:CIR Fl"lt!". l'T'li:i]'"l .X,':~C). ;I tt!!)" CI.')I"JC'. P,AVEIvlE]NT ._'Z, O00 PSI) ]'~-~ EIASED Ora A 1:.~/4T I (] OF MA[iH :£ I',IE WORI< 'l"[J HAND WORK. "1H I.' ;..~c., RAT I O I-'IA,:~' c-. BEliN AF'F't!i:'[:I E:.'? ,c',i::'I:'"R,'.;.':C I P,I"-;[...Y ,, AI',IO L.. ~.1 · L.~-~I(.".;Y I'-I['~EI)S q~:.'~ · ADDIT'iONAI....~ OR P, LINI']" PR]iCE CJI:-" $.t6.68~'SY, FOR 'T'HE P4)DEi'D [)Y 'FI. ItS CH;.~,htl~:Hii] L'.II.';,'I:)ER. 'T'H.[S IS Atxl '~.4.:::;().'}:-',.(,0' JNCf:d:!!i/:,SE f]VI;:::I~ WI'-IAT I,<...'.-; NOW ,SHOWN ON T'H~" Ct-tANGE (]1 ,ti') I/ii F,'. ;,,I., l.l.,=t,:. ~ F:'OF,' AL.L F-'AF, tTIL:.iS INVOLVED. IF-' WE: CAN (q£-JREE ON 'l]..li}]: l[.,Ji']) L:[')?,Ii}I')IL. ,L::, t'::;'!"A"fkL)} ABOVE, WE bJlLL.. BE GLAD ]'O SIGN THE C'l-iP, f,.~t!;E.j' ' ".. ,,) t. ." ' .'~,. L. H. Lacy Company General Contractors 214/357-0146 RI:..,~I: ~-C 'lr ,- IJLL Y SUBM I ]"'f ED, DAV ID M %1",t FD[ R,, I . I':'] ... :' . ,!'~ '. ~::",.::, . I-F-~O,.)EC] MANAGER -- ~,'~ A 10888 Shady Trail ~,,, ~.2~2.':,~ ........ P.O. Box 541297 Dallas, Texas 75354-1297 "Quality Construction for over 65 Years" GINN, INC. CONSULTING ENGINEERS March 17, 1989 Mr. David M. Snyder, P.E. L. H. Lacy Company P.O. Box 541297 Dallas, Texas 75354-1297 Re: Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - Change Order No. 2 - Revised. Dear Mr. Snyder: We are enclosing six (6) copies of Revised Change Order No. 2 to the subject Contract. This Change Order No. 2 increases the scope of work of the subject Contract to include the construction of the following: ae One southbound left turn lane at the median opening located at Station 178+17.77. Be One northbound left turn lane and a median opening at Station 182+44. One northbound left turn lane and a median opening at Station 186+98. One northbound and one southbound left turn lane and a median opening at Station 195+28. E. The west turnout of Parkway Boulevard. This work is to be accomplished in accordance with the Drawings transmitted to you on January 17, 1989, list attached, and the Contract specifications. Payment for the work included in this Change Order No. 2 for items A. through E., above, shall be in accordance with the Unit Prices in the Contract, with the exception of Pay Item 360.1, for items A. through D. above. We concur with your letter of February 27, 1989, copy attached, that the existing Contract Unit Price for Item 360.1 - 8" Concrete Pavement (3000 PSI) should apply to the work included in the original scope of work of the Contract and the left turn lanes and median openings added to the project by this Change Order No. 2 which would be slip-formed. Therefor, we propose the establishment of a new Pay Item, No. 360.6, 8" Concrete Pavement (3000 PSI) (For Additional Left Turn Lanes and Median Openings placed by other than slip-form paving machines), at the Unit Price proposed in your letter of February 27, 1989 of $ 16.68 per Square Yard (measured in place). Pay Item No. 360.6 shall only apply to construction of the left turn lanes and median openings, included in items A. through D. above, by methods other than slip-form. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 In preparation of the estimated construction costs accompanying the subject Change Order, we have used the price for proposed Pay Item No. 360.6. This sets the anticipated upper limit of costs associated with this Change Order No. 2. If some of the work included herein is done by the slip-form method the lower price for Pay Item 360.1 will be applied and the total construction cost associated with this Change Order No. 2 will be reduced accordingly. As we have previously discussed, the work included this Change Order No. 2 shall not be allowed to proceed until the City of Coppell has received the financial commitments pledged by the property owners who have requested these additional median openings and left turn lanes. Therefore, we will notify you of the City Council approval or disapproval of this Change Order as soon as possible after the Council meeting at which it is considered; and we will notify you to proceed with the work once the adjacent property owners fulfill their financial obligations with the City. This revised Change Order No. 2 shall also include the addition of 10 calendar days to the Contract time to allow for the construction of items A. through E. above. If you are in agreement with the terms of this Change Order No. 2, please execute all six copies and return them to this office. We must require your response to this proposed Change Order No. 2 by Monday, April 3, 1989 in order to have it placed on the agenda for the April 11, 1989 City Council meeting. Once approved by the City, we will return two copies with original signatures to you. Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer enclosures CC: H. Wayne Ginn, P.E. Russell Doyle, P.E. Randy Fleming File J - 379 a:lhlco2n2 d GEC¥IONI ~ ~TA, 1~)'2 + '~o (X-~--'T~c~ ~tqow~t -~T~, I$?. 4 Go.) ~CAL~,', I~':ZO' ~-- ~ I"-- ~' V, SEC. TI ON E ¢~'¥~. ~ STX. 18~ ~-~o II BOURHEM et ux ~8l +OIo ' J 11-12' REC'D, INLET (MOD~i IT.C.= 4 69.17 E.= 465.67 I PAY ITEM 475.3.1 NOTE= EXTRA DEPTH TO BE ADJUSTED,I BY OTHERS N'--~TE, STUBOUT D-ga IS FOR~ FUTURE USE & WILL I SERVICE AREA 6 AND I s~~+oo'-' ..... A PORTION OF AREA 7.i 18' POURED-IN-PLACE " ' ~5'x4'RCBC TO 7'x4'RCBC ITRANSITION. SEE DETAIL I I THIS SHEET x J PAY ITEM 475.70 LINE "D" STUe$o,, RcpD-ga 4' RCBC A BO DEVELOPMENT COt?P bi STA. 182+95.87 P.I.] A = 2* 50'0.0" RT. j FTA. 18$+50 J 1-14' REC'D. INLETI 460.52 I LPAY ~TEM 475.~40 J ION ESM'T il 2-2" PVC 500 LF eo. 103 - I STA. 181 +00 I 1-12' REC'D. INLET i T.C.= 468.78 J ELL-- 464.28 I L.~Y ITEM 475'50 J ._~ TBM ELEV. J ADJUST F.H.--7 I PA¥ ITEM 5e~.31 466.77 C~t, EtE orzl:)~-tz w 'DKtls'. &- laP-,F: 51.~. ¢-¢',4' ~ ptA;183 + 50 I-12 REC'D INLET (MOD.)I I T'C'= 464.34 E.: 460. 58 tPAY ITEM 475.-'5?- .NOTE; SHALLOW INLET ~': STUBOUT D-6a FOR FUTURE SE & WILL SERVICE ORTIONS OF AREAS ! AND 8. J STA. 185 +88.94 J 2-10' REC'D. INLETS J TC = 461.95 ~ = 457.45 J PAY I~M 475.20 j 20NSTRUCTION ESM'T /-2-7'x 4' RCBC :AUTION !! i EXIST GTE D~T IN A~A. JNOTE-' STUBOUT D-5a IS FOR 1 J FUTURE USE I~ WILL SERVICEI AREA 9 AND PORTIONS OF I J AREAS 8 ~ I0. LINE "D" STA. 187 -t- 50 ! I TC = 462.66 IT.. = 458.16 J ITEM 475.20 r- -7'X, ~>" TA~G VALV~ I0~ LP-- l" PV¢, biZ,14. 2-2" PVC 500 LF eo, W W i,i W ON m w ,,,, Ex/st I0' Water Note: This Inlet shall be Modified to :5,5' width inside to accomodate 30" Lateral. See Detail- Sheet ~>9 of 56. I i I I · M. OOUGLAS AOKINS THUS TEE [ADJUST F.H. IPAY ITEM 58Z.31 TBM ELEV. 465, 47 SmA. + '--'2' RECID, INLET(MO0) I~ = 465.~ I PAY ITEM 475.32 I NOTE.' SHALLOW INLE~ i ISTA 194+50 I1-1(~' REC'D. INLET (MOD) llC.--464.46 456.96 IPAY ITEM 475.21 I EXIST. G.T.E.M.H. TO BE 11 I ADJUSTED BY OTHERS] INOTE: EXTRA DEPTH INLET ,~ · '~" I ':' /? ' ~?Z".".'.'?Z';:~:~'"' ............ .v. ~~~,,,~w/iJJi~ . -"::::::,. ...........~ ~~i~ -- ...................... ................... ..? ,...~..........................,,................. .......,......., ~.~:: ....... · .~........ ~ .................~.:.:.~.:.:.~.,......................................~ ~ ~ . 2-~'x 4' F~C~C '~ ) ,,, ~ ~D" _ .~ - - ' t ?_.-;~" PVC 205 LF ea.~ uJ R ~ ~, '"' ! o'~ , - , ,--~- -, I J + -i-~ ,.>, V )' "' '"'"'""'-'" _.-s_'m,;.~ , ,..,,, ,0.,,. ,. ,/i l - ] ~ ~,,.Ji.,~,~__~. : T_~ --- II~ ' ° ' ' ~l.i?' .... ~Jl~ .... I o~-~ ~g I 'Y/J_s 'e N 01 .LDEG BOURHEM et ux 1~-~2' REC'D, INLET (MOD.) J JT.C.: 469.17 E.: 465.67 PAY ITEM 475,$1 J NOTE: IN6TE: STUBOUT D-ga IS FOR~ I FUTURE USE & WILL I TO BE ADJUSTED, BY OTHERS SERVICE AREA 6 AND A PORTION OF AREA 7. 18' p OUR ED - IN-_P~ .A, _C~.: I 5'x4'RCBC TO 7x4 RCBC JTRANSITION. SEE DETAIL J J THIS SHEET I I PAY ITEM 475.70 __ __ / £X. GT£ LINE "D" STUB D-go RCP C 'x 4' RCBC A BO DEVELOPMENT CORP 61 jSTA. 182+95.87 PJ'.I A = 2° 30'0.0" RT. i ,SrST 8 +50 II- 14' REC'D. INLET Jt.c.: 464.82 E._ = 460.52 J..~Y ITEM 475.:'40 'ION ESM'T T GTA. I81+~O J I-I?-' RECD. INLET j I T.C.= 468.78' !~_= 464.z8 I IPAY ITEM 475.$0~J 2-2" PVC 500 LF ea. ! ADJUST F.H.----J I PAY iTEM 58~_.3! TBM ELEV. 466.77 Line C] ,W II- 12' REC O INLET (MOD.) J I ~C. = 464.-~4 = 460. 58 ioPAY ITEM 475.52 TE.: SHALLOW IN. LET. -STU~OUT ~-~o "!1 :OR FUTURE ] "& Will SF_.RVlC~ I ~D 8.. , ~ll STA. 185 +88.94I 2-10' REC'D. INLETS I TC = 461.95 E.. = 457. 45 I PAY ITEM 475. 2 O__ I ESM'T N- /- 2 - 7 'x 4' RCBC CAUTION II EXIST. GTE DUCT IN AREA. INO'J'E-' STUBOUT D-50 I'~'-~r FUTURE USE & WILL SERVICE AREA 9 AND PORTIONS Of AREAS 8 ~ I0. TA. 187 + 50 2- I0' REC'D. INLETS TC = 46?_.66 17.. = 458.16 ImY iT,EM 475:20 LINE "D" T -7' x4' 185 2-2" PVC 500 LF ea~ 182' Water Esm"t. /~" ~r~ ate: This Inlet shall be Modified to 3,5' width inside to occomodate Lateral. See Detail Sheet 29 of ~. i AZ)K/NS T,~U S TEE A~-S~F~ L~AY ITEM 5~.3i TBM ELEV. 465.47 STA. I87 't' 50 PA~::: ~ ' I q" 86 1-12' REC'D. 'NLET(MOQ)iK~. TC = 463.40 P~,r n'E~ ~.~ I ~' NOTE: SHALLOW INLET,I ~¢/~L~: I'~