ST1002-CN090320
Page 1 of 1
Ken Griffin - Freese & Nichols Last Proposals
From: "Greg Yancey" <gregyancey@verizon.net>
To: "'Clay Phillips'" <cphillips@ci.coppell.tx.us>, "'Ken Griffin'" <KGRIFFI...
Date: 3/20/2009 9:59 AM
Subject: Freese & Nichols Last Proposals
CC: "'Charles Cotten'" <Charles@CSECRE.com>
Attachments: privatescope.pdf; publicscope.pdf; Freese Scope Summary 03-08.xls
I think these would require updating since we’ve already had them do some TH work and you had the ROW
drawings done as well.
Probably need to address what the City is doing on the square now.
The excel spreadsheet is what I gave her as my understanding of the deal.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\49C36905City_...11/15/2011
City design fees
1. Coppell Road extension, signal, traffic islands
2. S. Coppell Road design, angled parking
3. Public streets
4. Public parking on square and on Coppell Road Extension
5. Stormwater infrastructure
6. Sanitary sewer infrastructure
7. Water infrastructure
8. Earthwork for streets, drainage and finished lots
9. Silt fencing
10. Square pavilion
11. Square playground
12. Square restrooms
13. Square streetscape & landscape
14. Kirkland home relocation
15. Oncor underground electric on Coppell Road outside the site?
CSE design fees
1. Preliminary concept plan for submission prior to closing per LOI II.H.
2. Water taps, meter locations
3. Sanitary sewer taps, stubs to selected lots
4. Storm water futures? Drop inlets?
5. Private streetscape on CSE lots? No – deferred until vertical development
6. Irrigation masterplan
7. Landscape screen south border with irrigation
8. Private parking areas at retail services west; townhomes east; square north
9. Verizon telephone service infrastructure coordination
10. Atmos gas service infrastructure coordination
11. Oncor electric service coordination
12. Phase I Buildout:
Cottages 1&2; Retail 1; Restaurant 1; Townhomes 1-32