Loading...
ST8201-AG 900410~.~u TIF UI. FU fUIRE AGENDA REQUEST FORM CITY COUNCIL MEETING April 10, 1990 ITEM NO.~___ ITEM CAPTION: T,:~ ccns ider an ordinance clcsz, ng the public hearing on the assessments, levying assessments, for the payment of a portion of the cost of the improvements to :_~:~.~,~,.~ ;~.p Road from Beltline Road to Sandy Lake Road and fixing a charge and !Len against said properties, and the real anf~ true owners thereof. SUBMITTED BY: ....... sTA-FF REP/.' Frank Trando, Deputy C.M.. / ~ ...~ F~hance Dir. (Director s OT~ER RE~ . EVALUATION OF ITEM: DATE: /~ ?? APPROVED CtTY coUNCIL DATE ~ A~o---~'- BUDGET AMT.: CO~ENTS: AMT. ESTIMATED: AMT. +/- BUDGET: FINANCIAL REVIgW BY: LEGAL REVIEW BY: ,~,':~-*~n~ RFO FORM, REVIEWED BY CM: PAVING AND DRAINAGE ASSESSMENT ROLL DENTON TAP ROAD IMPROVEMENTS (FROM BELT LINE ROAD TO SANDY LAKE ROAD) FROM STATION 89+82 TO STATION 162,27.70 WHICH IS 7245.7 LINEAL FEET EAST SIDE PROPERTY OWNER PROPERTY DESCRIPTION ABUTTING FEET PAVING & DRAINAGE ASSESSMHNT PRELIMINARY SPECIAL BENEFIT ENHANCEMENT I WILLIAM G. THOMPSON 8333 DOUGLAS AVE. I 1§10 DALLAS, TX ?5225 2 VANTAGE RESIDENTIAL 8144 WALNUT HILL 1550 DALLAS, TX 75231 ST. LOUIS & SOUTHWESTERN RAILROAD 3 NORTHLAKE NURSERY & LANDSCAPING 794 DENTON TAP RD. COPPBLL, TX 75019 4 WILLIAM G. THOMPSON 5 8333 DOUGLAS AVE. 11510 DALLAS, TX 75225 6 RONALD D. VAN NESS 114 MASON CT. COPPELL, TX 75019 MCKINNEY & WILLIAMS SURV VOL. 180106, PG.1302 & VOL. 1752§2, PG. 2031 MCKtNNEY & WILLIAMS HURV ABHT.{1054 MCKINNEY & WILLIAMS SURV ABHT.II05{ MCKINNEY & WILLIAMS SURV ABST.t1054 VOL. 186109, PG. 0882 MCKINNEY & WILLIAMS SURV ABHT.{1054 EDWARD A. CROW SURVEY, ABST. 1301 VOL. {84076, PG. 5591 622.23 165.42 103.53 585.46 986.66 180.31 $80,118.33 $21,299.48 $13,330.52 $75,383.83 $127,042.34 $23,216.72 $12,900.00 $17,560.00 S36,950.00 S1,080.00 S52,270.00 $12,900.00 S13,330.52 $17,560.00 $36,950.00 $1,080.00 7 STEVEN CARL PARSONS 102 MEADOWCREEK 1101 COPPELL, TX 75019 EDWARD A. CROW SURVEY, ABST. 1301 VOL. 184181, PG.1044 120.{9 $15,514.29 $2,050.00 $2,050.00 9 NCNB Nancy ~uters P.O. BOX 830106 DALLAS, TX 75283-0106 10 WILLIAM C. STEARMAN III, D.V.M. 504 S. DENTON TAP COPPELL, TX 75019 1i ROANLD D. VAN NBHS 114 MASON CT. COPPELL, TX 75019 13 EDWARD EUGENE & WILLIAM DAVID GADDY 2241 ROYAL LANE DALLAS, TX 75229 EDWARD A. CROW SURVEY, ABST. 1301 vOL. I, PG. EDWARD A. CROW $URVBY, ABST. 1301 VOL. 179061, PG. 1084 EDWARD A. CROW SURVEY, ABHT. 1301 VOL. {81079, PO 2244 EDWARD A. CROW SURVEY, ABST. 1301 VOL. 180120, PG. 2525 206.62 67.81 150.00 112.66 SCHEDULE 1 Page 2 of 5 526,604.39 $8,731.22 $19,314.00 $18,368.90 $15,?00.00 $2,710.00 $11,400.00 $10,220.00 S15,700.00 S2,710.00 S11,400.00 $10,270.00 14 15 17 18 19 21 NORTHLAKE WOODLANDH CENTER 7TH NLH REALITY 1226 P.O. BOX 758 HOUHTON, TX 77001 EDWARD A. CROW SURVBY, ABST. {301 VOL. 181234, PO. 1447 LUCY FIELD BELNKAP, LUCY ROSE MAYFIBLD & EDWARD A. CROW SURVEY, ABHT. 7301 MARY JO DELAHAYE VOL. 3900 8HENANDOAH DALLAS, TX 75205 COPPELL BANK NATIONAL ASHOCIATION FDIC 5080 SPECTRUM lO00B DALLAS, TX 75248 EDWARD A. CROW HURVEY, ABS?. 1301 VOL. 185141, PO. 300? BRAEWOOD CENTRE TEXAS AMERICAN BANK DALLAS P.O.BOX 35207 DALLAS, TX 75235 EDWARD A. CROW HURVEY, ABST. 7301 VOL. {84241, PO. 1666 TOWN OAKH CENTRE LOT 3 MINYARD PROPBRTIBH ATTN: RBAb BHTATE P.O.BOX 518 COPPELL. TX 15019 EDWARD A. CROW SURVEY, ABHT. 7301 VOL. 84248, PO. 5137 124.99 $16,093.71 1435.88 $184,883.91 200.00 $25,752.00 495.30 $63,774.$3 286.64 $36,907.77 SUBTOTAL 5834.00 $756,336.24 *~ AHSEHSMENT FIOURE$ DETERMINED BY MUbTIPbYINO ABUTTINO FBET BY $128.76 WHICH I8 BAHBD ON ESTIMATED CONHTRUCTION COHTH DETERMINED FROM THE LOW BID RECEIVED. *~ ASHBSSMBNT FIOURBS DETERMINED BAHED ON INITIAL ENHANCEMENT STUDY. $9,000.00 $111,160.00 911,500.00 $41,610.00 945,520.00 $381,730.00 $9,000.00 $111,160.00 $11,500.00 $41,610.00 S36,907.?? 9386,398.29 SCHEDULE 1 Page 3 of 5 PHING IND DRAINAGE ISIi~NENT RO~ DENTON TIP ROAD IN?ROVEMENT$ {FRON IE~? LINE ROlO TO SANDY ~AIE ROAD} FROM ~ATIOW 89~82 TO ~?A~IO# 162~27.70 WHICH IS 7245.7 LINEAL FEET PROPERTY OWNER ABOTTING PROPERTY DESCRIPTION FEET 46 NORTHLAKE ESTATES A.E.GADDY & HENRY DAVIS 9817 KINGSLEY RD. DALLAS, TI 75238 ST. LOUIS & SOUTHWESTERN RAILROAD P.O.HOX 1319 HOUSTON, TX 77251-1319 45 BAPTIST FOU#HATION OF TEXAS 2001 BRYAN [1500 DALLAS, TX 75201 44 DENTON TAP JOINT VBNTURB 102 MBADOWCREEK RD. IlO1 COPPELL, TX 75019 43 JOSEPH COLLUM THWEATT RT. 1 BOX 188 COPPELL, TX 75019 42 JOSEPH COLLUM THWEATT RT. 1 BOX 188 COPPELL, TX 15019 41 COMMODORB SAVINGS ASSOCIATION P.O.BOX 2910 DALLAS, TX 75221 39 B.T. ARDINUBR, dR. 9040 GOVBRNORS ROW DALLAS, TX 75247 38 SANDY LAKE CROSSING, LOT 5, BLOCK A KENTUCKY FRIED CHICKEN P.O.BOX 35420 bOUISVIbLB, KY 40232 J.A. SIMMONS SURVEY, ABST. 11296 VObUMB 45, PAGB 65 753.58 J.A. SIMMONS SURVEY, ABST. 11296 103.53 d.A. SIMMONS SURVEY, AHT. 11296 VOL. 167199, PG. 0785 EDWARD A. CROW SURVEY, ABST. {301 VOL. U4038, PG. 3474 BDWARD A. CROW SURVEY, ABST. 1301 VOL. 177093, PG. 0009 EDWARD A. CROW SURVBY, ABST. t301 VOL. 189, PG. 2382 EDWARD A. CRON SURVBY, ABST. t301 VOL. 188002, PG. 3005 EDWARD A. CROW SURVBY, AB;T. t301 VOL. 180198, PO. 3516 1208.11 533.07 1540.19 1032.79 833.92 704.38 EDWARD A. CROW SURVEY, ABST. 4301 163.49 37 SANDY LAKE CROSSING, LOT 1, BLOCK A MCDONALDS CORP. TR. AMF OHARE P.O.BOX 66207 CHICAGO, IL 60666 BDWARD A. CROW SURVEY, ABST. 1301 195.00 {MCDONA{.DS-VOL I ,PO. ) SCHEDULE 1 Page 4 of § PAVING & DRAINAGE $97,030.96 $13,330.52 S155,556.24 $68,638.09 8198,314.86 $132,982.04 $107,375.54 $90,695.97 $21,050.97 $25,108.20 PRBLIMINARY SPBCIAL BBNBFIT BNHANCBMBNT 829,390.00 $27,320.00 $12,260.00 $16,800.00 $21,480.00 $33,360.00 $56,350.00 $26,320.00 $35,880.00 NB? ASSBSSMBNT $29,390.00 $13,330.52 S77,320.00 $12,260.00 $16,800.00 $21,480.00 $33,360.00 $56,350.00 821,050.97 $25,108.20 36 SANDY hAKE CROSSING, hOT 3, ghOC~ 1 EXXON CORP. P.O.BOI §3 HOUSTON° TX 71001 EDWARD A. CROW SURVEY, ABST. {301 19.83 $2,5§3.31 {EXXON TRACT-VOb. ! , PG. ) $1q,680.00 $2,553.31 SUBTOTAL 7081.89 $912,636.72 $326,840.00 $309,003.00 AHHESHMBNT FIGURBH DETERMINED BY MULTIPLYING ABUTTING FEET BY $128.76 WHICH IS BASED ON ESTIMATED CONSTRUCTION COST DETERMINED FROM THE LOW BID RECEIVED. *** ASSEHSMBNT FIGURES DETERMINED BASED ON INITIAL ENHANCEMENT STUDY. SCHEDULE 1 Page 5 of 5