ST1002-EM100316 (2) Page 1 of 1 Ken Griffin - RE: Old Town Coppell - Cost Estimates From:   Caleb Thornhill <bct@freese.com> To:   "KGRIFFIN@ci.coppell.tx.us" <KGRIFFIN@ci.coppell.tx.us>, Mindi Hurley <m... Date:   3/16/2010 4:48 PM Subject:   RE: Old Town Coppell - Cost Estimates CC:   Tricia Hatley <thh@freese.com>, CPL09446 <CPL09446@freese.com>, DanPrend...   Ken/Mindi,   Meant to include this earlier with the cost estimate.  The estimated additional fee will be approximately $31,500 to design the remainder of the Old Town Coppell Infrastructure Improvements.  Once you guys have had a chance to sit down and verify the responsibilities of the City and the developer, we can sit down and discuss which route you guys would like to take.   Hope this helps.  Trish will be out the rest of this week.  If you need anything else regarding this project, let me know.   Thanks.   B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 From: Caleb Thornhill Sent: Tuesday, March 16, 2010 11:10 AM To: 'KGRIFFIN@ci.coppell.tx.us'; 'Mindi Hurley' Cc: Tricia Hatley; 'cpl09446@freese.com'; Dan Prendergast Subject: Old Town Coppell - Cost Estimates   Ken/Mindi,   Attached are the updated cost estimates for Old Town Coppell Infrastructure Improvements.  The “New Format” is an estimate for the infrastructure improvements in our current contract based on our discussion last week.  The “Full Build Out” is an estimate for all infrastructure improvements.  Please review and let me know if you have any questions.  If you need additional information, feel free to call.   Thanks.   B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. Main: 214-217-2200  Direct: 214-217-2282  Fax: 214-920-2565  Email: bct@freese.com    This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPgrpwise\4B9FB661...11/17/2011 (11/17/2011) Ken Griffin - Old Town Coppell - Cost EstimatesPage 1 From: Caleb Thornhill <bct@freese.com> To: "KGRIFFIN@ci.coppell.tx.us" <KGRIFFIN@ci.coppell.tx.us>, Mindi Hurley <m... CC: Tricia Hatley <thh@freese.com>, CPL09446 <CPL09446@freese.com>, DanPrend... Date: 3/16/2010 11:16 AM Subject: Old Town Coppell - Cost Estimates Attachments: Old Town OPCC-New Format 3-12-10.pdf; Old Town OPCC-New Format-FULL BUILD- OUT3-12-10.pdf Ken/Mindi, Attached are the updated cost estimates for Old Town Coppell Infrastructure Improvements. The "New Format" is an estimate for the infrastructure improvements in our current contract based on our discussion last week. The "Full Build Out" is an estimate for all infrastructure improvements. Please review and let me know if you have any questions. If you need additional information, feel free to call. Thanks. B. Caleb Thornhill P.E. Project Manager [cid:image001.jpg@01CAC4F8.9FC98C80] Freese and Nichols, Inc.<http://www.freese.com/> * Main: 214-217-2200 * Direct: 214-217-2282 * Fax: 214-920-2565 * Email: bct@freese.com<mailto:bct@freese.com> ________________________________ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. (11/17/2011) Ken Griffin - Old Town OPCC-New Format-FULL BUILD-OUT3-12-10.pdfPage 1 OLD TOWN COPPELL -FULL BUILD OUT INFRASTRUCTURE IMPROVEMENTS COPPELL, TX OPINION OF PROBABLEC ONSTRUCTION COST ARCH M12,2010 ESTIMATORCHECKED BYACCOUNT NO DRPCPL09446 ITEMDESCRIPTIONQUANTITYUNITUNIT PRICETOTAL PAVING IMPROVEMENTS 8" Reinforced Concrete Pavement 13,600SY$35.00$476,000.00 8" Reinforced Stamped Concrete Pavement 850SY$105.00$89,250.00 Remove and Dispose of Existing Asphalt (Bethel) 1,500SY$6.00$9,000.00 Asphalt Transition 560SY$20.00$11,200.00 8" Lime-Cement Stabilized Subgrade 14,960SY$3.00$44,880.00 On-Street Parking 9,110SY$29.00$264,190.00 Median Nose 4EA$1,200.00$4,800.00 Monolithic Curb as part of Median Structures 200LF$25.00$5,000.00 Lime (Hydrated) 202TN$135.00$27,264.60 Temporary Pavement for Traffic Control (2" HMAC, 6" Agg, Base) 1,000SY$135.00$135,000.00 Traffic Signs 15EA$410.00$6,150.00 Pavement Markings 8,500LF$1.25$10,625.00 Concrete Sidewalk 24,000SF$4.20$100,800.00 Solid Pavement Markings 240LF$4.00$960.00 Handicap Symbols 18EA$150.00$2,700.00 Parking Space Striping 5,920LF$0.60$3,552.00 Intersection Signalization (Bethel Rd & Main St) 1LS$150,000.00$150,000.00 Paving Item Subtotal$1,341,371.60 DRAINAGE IMPOVEMENTS 18" RCP 200LF$40.00$8,000.00 24" RCP 800LF$45.00$36,000.00 30" RCP 250LF$55.00$13,750.00 36" RCP 900LF$65.00$58,500.00 Trench Safety & Support 2,150LF$1.25$2,687.50 10' Curb Inlet 9EA$2,500.00$22,500.00 15' Curb Inlet 2EA$3,500.00$7,000.00 4' SDMH 2EA$4,000.00$8,000.00 30" Headwall 1EA$3,500.00$3,500.00 Rock Rip Rap 12SY$80.00$960.00 Drainage Grading Improvements 1LS$50,000.00$50,000.00 Drainage Item Subtotal$210,897.50 UTILITY IMPROVEMENTS 10" PVC C-900 945LF$35.00$33,075.00 8" PVC C-900 3,065LF$30.00$91,950.00 6" PVC C-900 290LF$28.00$8,120.00 8" Gate Valve 9EA$500.00$4,500.00 Fire Hydrant 10EA$3,000.00$30,000.00 16"x10" TS&V 2EA$5,000.00$10,000.00 16"x8" TS&V 2EA$4,800.00$9,600.00 10"x8" TS&V 2EA$4,500.00$9,000.00 8"x6" TS&V 2EA$4,000.00$8,000.00 Fittings and Bends 2TN$2,500.00$5,000.00 Water Service Connection (short) 7EA$650.00$4,550.00 Water Service Connection (long) 9EA$900.00$8,100.00 8" PVC SDR-35 (Sanitary Sewer) 2,545LF$40.00$101,800.00 Sewer Service Connection (short) 19EA$600.00$11,400.00 Sewer Service Connection (long) 1EA$900.00$900.00 Manholes 11EA$3,500.00$38,500.00 Trench Safety & Support 6,845LF$1.25$8,556.25 Utility Item Subtotal$383,051.25 LANDSCAPE AND IRRIGATION IMPROVEMENTS Landscape Planting (3" Cal, 8' HT, 5' Spread) 51EA$1,984.00$101,184.00 Landscape Planting (shrubs, etc) 77EA$600.00$46,200.00 Planters 40EA$800.00$32,000.00 Irrigation System 1LS$35,000.00$35,000.00 Street Lighting Assembly 42EA$3,000.00$126,550.00 Street Lighting Foundation 42EA$750.00$31,637.50 2" PVC Electrical Conduit 2,531LF$8.89$22,500.59 Landscape Item Subtotal$395,072.09 SUBTOTAL:$2,330,400 CONTINGENCY20%$466,080 PROJEC OL$2,796,500 TTTA Developer's Responsibility On-Street Parking 4,300SY$29.00$124,700.00 Water Service Connection (short) 7EA$650.00$4,550.00 Water Service Connection (long) 9EA$900.00$8,100.00 Sewer Service Connection (short) 19EA$600.00$11,400.00 Sewer Service Connection (long) 1EA$900.00$900.00 Developer Total$149,650 CIY OF COPPELL OL$2,646,850 TTTA Page 1 of 1 OdTownOPCC-NewFora-FULLBULD-OUT3-12-10xsx l mt I.l (11/17/2011) Ken Griffin - Old Town OPCC-New Format 3-12-10.pdfPage 1 OLD TOWN COPPELL -ORIGINAL SCOPE INFRASTRUCTURE IMPROVEMENTS COPPELL, TX OPINION OF PROBABLE CONSTRUCTION COST MARCH 12, 2010 ESTIMATORCHECKED BYACCOUNT NO DRPCPL09446 ITEMDESCRIPTIONQUANTITYUNITUNIT PRICETOTAL PAVING IMPROVEMENTS 8" Reinforced Concrete Pavement 9 ,450SY$35.00$330,750.00 8" Reinforced Stamped Concrete Pavement 7 00SY$105.00$73,500.00 Remove and Dispose of Existing Asphalt (Bethel) 1 ,500SY$6.00$9,000.00 Asphalt Transition 5 60SY$20.00$11,200.00 8" Lime-Cement Stabilized Subgrade 10,395SY$3.00$31,185.00 On-Street Parking 6 ,800SY$29.00$197,200.00 Median Nose 4 EA$1,200.00$4,800.00 Monolithic Curb as part of Median Structures 2 00LF$25.00$5,000.00 Lime (Hydrated) 1 40TN$135.00$18,944.89 Temporary Pavement for Traffic Control (2" HMAC, 6" Agg, Base) 1 ,000SY$135.00$135,000.00 Traffic Signs 1 5EA$410.00$6,150.00 Pavement Markings 7 ,500LF$1.25$9,375.00 Concrete Sidewalk 24,000SF$4.20$100,800.00 Solid Pavement Markings 2 40LF$4.00$960.00 Handicap Symbols 1 2EA$150.00$1,800.00 Parking Space Striping 5 ,700LF$0.60$3,420.00 Intersection Signalization (Bethel Rd & Main St) 1 LS$150,000.00$150,000.00 Paving Item Subtotal$1,089,084.89 DRAINAGE IMPOVEMENTS 18" RCP 1 40LF$40.00$5,600.00 24" RCP 5 60LF$45.00$25,200.00 30" RCP 1 75LF$55.00$9,625.00 36" RCP 6 30LF$65.00$40,950.00 Trench Safety & Support 1 ,505LF$1.25$1,881.25 10' Curb Inlet 9 EA$2,500.00$22,500.00 15' Curb Inlet 2 EA$3,500.00$7,000.00 4' SDMH 2 EA$4,000.00$8,000.00 30" Headwall 1 EA$3,500.00$3,500.00 Rock Rip Rap 1 2SY$80.00$960.00 Drainage Grading Improvements 1 LS$50,000.00$50,000.00 Drainage Item Subtotal$175,216.25 UTILITY IMPROVEMENTS 10" PVC C-900 9 45LF$35.00$33,075.00 8" PVC C-900 2 ,670LF$30.00$80,100.00 6" PVC C-900 1 40LF$28.00$3,920.00 8" Gate Valve 7 EA$500.00$3,500.00 Fire Hydrant 8 EA$3,000.00$24,000.00 16"x10" TS&V 2 EA$5,000.00$10,000.00 16"x8" TS&V 1 EA$4,800.00$4,800.00 10"x8" TS&V 2 EA$4,500.00$9,000.00 8"x6" TS&V 2 EA$4,000.00$8,000.00 Fittings and Bends 2 TN$2,500.00$5,000.00 Water Service Connection (short) 4 EA$650.00$2,600.00 Water Service Connection (long) 7 EA$900.00$6,300.00 8" PVC SDR-35 (Sanitary Sewer) 1 ,910LF$40.00$76,400.00 Sewer Service Connection (short) 5 EA$600.00$3,000.00 Sewer Service Connection (long) 1 EA$900.00$900.00 Manholes 7 EA$3,500.00$24,500.00 Trench Safety & Support 5 ,665LF$1.25$7,081.25 Utility Item Subtotal$302,176.25 LANDSCAPE AND IRRIGATION IMPROVEMENTS Landscape Planting (3" Cal, 8' HT, 5' Spread) 5 1EA$1,984.00$101,184.00 Landscape Planting (shrubs, etc) 7 7EA$600.00$46,200.00 Planters 4 0EA$800.00$32,000.00 Irrigation System 1 LS$35,000.00$35,000.00 Street Lighting Assembly 4 2EA$3,000.00$126,550.00 Street Lighting Foundation 4 2EA$750.00$31,637.50 2" PVC Electrical Conduit 2 ,531LF$8.89$22,500.59 Landscape Item Subtotal$395,072.09 SUBTOTAL:$1,961,550 CONTINGENCY20%$392,310 PROJECT TOTAL$2,353,900 Developer's Responsibility On-Street Parking 2 ,675SY$29.00$77,575.00 Water Service Connection (short) 4 EA$650.00$2,600.00 Water Service Connection (long) 7 EA$900.00$6,300.00 Sewer Service Connection (short) 5 EA$600.00$3,000.00 Sewer Service Connection (long) 1 EA$900.00$900.00 Developer Total$90,375 CITY OF COPPELL TOTAL$2,263,525 Page 1 of 1 Old Town OPCC-New Format 3-12-10.xlsx