Ó¿·² ¬ò¼»ª»´±°³»²¬ ½±²½»°¬«¿´ °´¿² Þ»¬¸»´ α¿¼ ß´¬»®²¿¬» ½·¬§ ±º ½±°°»´´ Ѱ·²·±² ±º Ю±¾¿¾´» ½±²¬®«½¬·±² ½±¬ ß«¹«¬ ïïô îððç ESTIMATORCHECKED BYACCOUNT NO CJPOFF09041 ITEMDESCRIPTIONQUANTITYUNITUNIT PRICETOTAL GENERAL Remove Existing Concrete Paving4,000.0SY$6.20$24,800.00 Unclassified Roadway Excavation 550 CY$8.00$4,400.00 Erosion Control 1 LS$1,000.00$1,000.00 Traffic Control 1 LS$12,000.00$12,000.00 General Item Subtotal$42,200.00 PAVING IMPROVEMENTS Street Paving 8" Concrete Pavement (3600 psi)(Main St.) 5,000 SY$35.00$175,000.00 8" Lime Treated Subgrade 5,250 SY$2.35$12,337.50 Lime 71 TON$135.00$9,585.00 Sidewalk 5" Sidewalk 17,170 SF$3.90$66,963.00 Pavement Markings Pavement Markings 1 LS$4,500.00$4,500.00 Traffic Signs 4 EA$410.00$1,640.00 Paving Item Subtotal$270,025.50 PAVING SUBTOTAL $312,225.50 CONTINGENCY30%$93,670.00 PROJECT TOTAL$405,896 Page 1 of 1 Coppell_OPCC_MainSt