Loading...
ST1002-CS100319 Page 1 of 2 Ken Griffin - Re: FW: Proposed Well at W. Bethel and S Coppell Road From:Ken Griffin     To:Frank Clark     Date:3/19/2010 2:13 PM     Subject:Re: FW: Proposed Well at W. Bethel and S Coppell Road     CC:Keith Marvin       We have located the site where your proposed well will be located.  My project engineer for Coppell Rd., Keith Marvin, will evaluate that location against our construction plans on Monday to determine if the location is in conflict with any proposed improvements.  He should be in touch with you next week.  Do not drill the well until you have heard from Keith.   Thanks,     Ken Griffin, P. E., CFM Director of Engineering & Public Works 972-304-3686 kgriffin@coppelltx.gov >>> Frank Clark <fclark@wh-m.com> 3/19/2010 1:54 PM >>> Hi Ken-   I wanted to be sure you received this message from Wednesday morning.  We are planning on drilling th the proposed well next Wednesday, March 24, if that is ok with you.   Let me know, thanks   Frank   From: Frank Clark Sent: Wednesday, March 17, 2010 8:52 AM To: 'kgriffin@ci.coppell.tx.us' Subject: Proposed Well at W. Bethel and S Coppell Road   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BA386A4City...11/22/2011 Page 2 of 2 Hello Ken-   We have marked a proposed location for the well we discussed a few weeks ago behind the barber shop at 460 W. Bethel Road (see attached plan).  The pavement is marked with a white circle and cross- hairs.   We will contact DigTess to clear private utilities, please let me know if there are any city utilities in the area we need to be aware of.  We would like to complete the work early next week if possible.   Thank-you.   Frank   Frank W. Clark, PE, PG   W&M Environmental Group, Inc. 906 E. 18th Street Plano, Texas  75074   972-509-9611 Direct   972-516-4145 Fax 214-668-4467 Cell fclark@wh-m.com  please don't print this e-mail unless you really need to.   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4BA386A4City...11/22/2011