John
The contact information is :
Jay Reinke
Corporate Development
Energy Future Holdings, Luminant
500 N Akard, Lincoln Plaza, LP-1035B
Dallas, TX 75201
Office: 214-875-8815 / Mobile: 214-436-4477
ken g
>>> John Rutledge <JLR@freese.com> 9/19/2011 3:52 PM >>>
Our permitting folks would like to visit the North lake site this Thursday, if possible. With whom should
they talk to arrange access?
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
[cid:image001.gif@01CC76E4.1F769D30]
Please consider the environment before printing this message.
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is addressed.
This message, together with any attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the information as confidential and
privileged and to not disclose or use the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited. If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any computer. Thank you for your
cooperation.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPgrpwise\4E7863B0...11/23/2011
(11/23/2011) Ken Griffin - Re: access to NLPage 1
From:
John Rutledge <JLR@freese.com>
To:
Ken Griffin <kgriffin@coppelltx.gov>
Date:
10/17/2011 4:50 PM
Subject:
Re: access to NL
Not a big surprise. Thanks for the help
John Rutledge
On Oct 17, 2011, at 3:47 PM, "Ken Griffin" <kgriffin@coppelltx.gov> wrote:
> John
>
> We continue to work with Luminant on access to the property. The City Manager had a meeting last
week with representatives of Luminant and he is hopeful that access will be granted shortly. Wish I had
better news.
>
> Ken Griffin
>
> >>> John Rutledge <JLR@freese.com> 10/13/2011 10:49 AM >>>
> I talked with Jay Reinke at Luminant and he said he has everything he needs from the City and us and
he didn't see any problems with us getting access but that it was going through their process. He Wasn't
sure how long it would take. Given the result on the request for information regarding the outlet, I'll remain
a bit skeptical, but hopefully it won't take much longer.
> John
>
>
> Sent from my iPad
>
> On Sep 30, 2011, at 8:29 AM, "Ken Griffin" <kgriffin@coppelltx.gov<mailto:kgriffin@coppelltx.gov>>
wrote:
>
> John
>
> Right now we are waiting on Luminant/Oncor to grant permission to the site. We have what we need
from you at this time.
>
> Ken Griffin
>
> >>> John Rutledge <JLR@freese.com<mailto:JLR@freese.com>> 9/30/2011 8:27 AM >>>
> We have not heard anything so I was checking on the status or if there is any problem. Is there anything
you're waiting on from us? The insurance was sent last week
> Thanks
> JLR
>
> John L. Rutledge, P.E.
> Freese and Nichols, Inc.
> 4055 International Plaza St 200
> Fort Worth, TX 76109
> 817-735-7284
> jlr@freese.com<mailto:jlr@freese.com>
>
> <ATT00001.gif>
>
> From: Ken Griffin [mailto:kgriffin@coppelltx.gov]
> Sent: Thursday, September 22, 2011 4:40 PM
(11/23/2011) Ken Griffin - Re: access to NLPage 2
> To: John Rutledge
> Subject: Re: FW: access to NL
>
> John
>
> We're trying to work this access issue out. This time Luminant wants certificates of insurance before
they allow access to the property. We have our's. However, there was not a certificate of insurance
included in your contract. I know the contract language discusses liability and indemnification. However,
what we need is a certificate of insurance from F&N that also names the city of Coppell as an additionally
insured party.
> Thanks
> ken g
>
> >>> John Rutledge <<mailto:JLR@freese.com>JLR@freese.com<mailto:JLR@freese.com>>
9/22/2011 9:00 AM >>>
> Keeping you in the loop. I don't understand, but what Luminant wants is similar to last time. Assuming
Clay takes care of it, you don't need to do anything
>
> Thanks
> JLR
>
> John L. Rutledge, P.E.
> Freese and Nichols, Inc.
> 4055 International Plaza St 200
> Fort Worth, TX 76109
> 817-735-7284
> <mailto:jlr@freese.com>jlr@freese.com<mailto:jlr@freese.com>
>
> [cid:image001.gif@01CC7906.041A0300]<mailto:[cid:image001.gif@01CC7906.041A0300]>
>
> From: Reinke, Jay
[mailto:Jay.Reinke@energyfutureholdings.com]<mailto:[mailto:JayReinke@energyfutureholdings.com]>
> Sent: Thursday, September 22, 2011 8:21 AM
> To: John Rutledge
> Cc: Clay Phillips
> Subject: access to NL
>
> John,
>
> I got your message; good to hear your voice.
>
> Before F&N can access the site, Luminant must receive from the Landlord a properly-addressed notice
and request under the Lease. I just send Clay an email reiterating this.
>
> Thanks,
>
> Jay
>
>
> _____________________
> Jay Reinke
> Corporate Developement
> Energy Future Holdings, Luminant Generation Corp
> 500 N. Akard St., LP 10-030B
>
> Dallas, TX 75201
(11/23/2011) Ken Griffin - Re: access to NLPage 3
> Office: 214-875-8815 Mobile: 214-435-4477
>
> Confidentiality Notice: This email message, including any attachments, contains or may contain
confidential information intended only for the addressee. If you are not an intended recipient of this
message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this
message or its attachments is strictly prohibited. If you have received this message in error, please notify
the sender immediately by reply message and delete this email message and any attachments from your
system.
> Please consider the environment before printing this message.
>
> ________________________________
> This electronic mail message is intended exclusively for the individual or entity to which it is addressed.
This message, together with any attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the information as confidential and
privileged and to not disclose or use the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited. If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any computer. Thank you for your
cooperation.
(3/5/2012) Ken Griffin - North LakePage 1
From:
John Rutledge <JLR@freese.com>
To:
Karl Hoffman <KWH@freese.com>
CC:
"Ken Griffin (kgriffin@coppelltx.gov)" <kgriffin@coppelltx.gov>, SteveWa...
Date:
1/18/2012 8:03 AM
Subject:
North Lake
Attachments:
image001.gif
Karl,
If I'm reading the agreement correctly, it looks like you need to email Patrick McInroe at
patrick.mcinroe@luminant.com<mailto:patrick.mcinroe@luminant.com> with a copy to Paul Martin at
Vinson and Elkins (pmartin@velaw.com<mailto:pmartin@velaw.com>) and Andy Wright at
awright@energyfutureholdings.com<mailto:awright@energyfutureholdings.com> with your notice of the
day you want to go. You need a minimum of 48 hour notice. Please copy Ken and me.
Since I'm guessing none of the 3 will be the ones to actually let you in at the site, you'll have to ask them
whom you should coordinate with for instructions to enter the site.
The agreement says you have to be between 9 and 5. If you'll need more than one day, let them know.
Provide them a brief description of your planned schedule and activities.
Ken, if you see anything I'm missing, please let us know.
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
[cid:image001.gif@01CCD5B6.6D17C420]
Please consider the environment before printing this message.
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is addressed.
This message, together with any attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the information as confidential and
privileged and to not disclose or use the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited. If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any computer. Thank you for your
cooperation.
Page 1 of 1
Ken Griffin - North Lake site visit/jurisdictional determination
From: Karl Hoffman <KWH@freese.com>
To: "patrick.mcinroe@luminant.com" <patrick.mcinroe@luminant.com>
Date: 1/18/2012 11:17 AM
Subject: North Lake site visit/jurisdictional determination
CC: John Rutledge <JLR@freese.com>, "pmartin@velaw.com" <pmartin@velaw.com>,...
Mr. McInroe,
It is my understanding that I need to coordinate with you in regard to access to the North Lake impoundment.
The purpose of the site visit would be to conduct a preliminary jurisdictional determination (JD) of existing
waters of the U.S., including the documentation of inflows, the functional outflow, and the receiving water
body. I am hoping to conduct the site visit/JD next Tuesday (December 24). The site visit would likely take a few
hours, depending on access around the perimeter of the impoundment. The data I plan to collect will be
needed for our consultation with the U.S. Army Corps of Engineers (USACE) when discussing options for
lowering the conservation pool and re-establishing jurisdictional limits.
Please let me know if a site visit next Tuesday would be possible, as well as who I would contact for actual
entrance to the site.
Sincerely,
Karl Hoffman
Environmental Scientist
Freese and Nichols, Inc.
(817) 735-7389
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F16AA30C...3/5/2012
Page 1 of 2
Ken Griffin - RE: North Lake site visit/jurisdictional determination
From: "McInroe, Patrick" <Patrick.Mcinroe@luminant.com>
To: Karl Hoffman <KWH@freese.com>, "Ray, Kyle" <William.Ray@luminant.com>
Date: 1/18/2012 11:21 AM
Subject: RE: North Lake site visit/jurisdictional determination
CC: John Rutledge <JLR@freese.com>, "pmartin@velaw.com" <pmartin@velaw.com>,...
th
Karl – no problem for next Tuesday (I assume you mean January 24!) I can be at the front gate to meet you at
either 9am, or at 1pm – your choice, thx.
Regards,
PJM
From: Karl Hoffman [mailto:KWH@freese.com]
Sent: Wednesday, January 18, 2012 11:12 AM
To: McInroe, Patrick
Cc: John Rutledge; pmartin@velaw.com; Wright, Andy; Ken Griffin (kgriffin@coppelltx.gov)
Subject: North Lake site visit/jurisdictional determination
Mr. McInroe,
It is my understanding that I need to coordinate with you in regard to access to the North Lake impoundment.
The purpose of the site visit would be to conduct a preliminary jurisdictional determination (JD) of existing
waters of the U.S., including the documentation of inflows, the functional outflow, and the receiving water
body. I am hoping to conduct the site visit/JD next Tuesday (December 24). The site visit would likely take a few
hours, depending on access around the perimeter of the impoundment. The data I plan to collect will be
needed for our consultation with the U.S. Army Corps of Engineers (USACE) when discussing options for
lowering the conservation pool and re-establishing jurisdictional limits.
Please let me know if a site visit next Tuesday would be possible, as well as who I would contact for actual
entrance to the site.
Sincerely,
Karl Hoffman
Environmental Scientist
Freese and Nichols, Inc.
(817) 735-7389
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F16AB3D...3/5/2012
Page 2 of 2
Confidentiality Notice: This email message, including any attachments, contains or may contain
confidential information intended only for the addressee. If you are not an intended recipient of this
message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this
message or its attachments is strictly prohibited. If you have received this message in error, please notify
the sender immediately by reply message and delete this email message and any attachments from your
system.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F16AB3D...3/5/2012
(3/5/2012) Ken Griffin - North lakePage 1
From:
John Rutledge <JLR@freese.com>
To:
"Ken Griffin (kgriffin@coppelltx.gov)" <kgriffin@coppelltx.gov>
Date:
2/3/2012 8:48 AM
Subject:
North lake
Attachments:
image001.gif
Ken,
They made their site visit to North Lake the other day and everything went well on that. They're pulling
together their information and trying to set up a visit with the Corps to try to get a handle on exactly how
far we can go to reduce permitting efforts. The schedule for development is to have the lake lowered and
some edge work done to allow development of their Phase 2 in Nov. of 2013. I don't know how that fits
the City's schedule, but to match it would mean starting construction in the fall of this year to lower the
lake, which backs into starting the field exploration and the design this spring. Those are general dates
without any scheduling effort behind them. I wanted to start the discussion about how the City wants to
proceed and thought it might be helpful for me to come to your office to meet and go over the next phases
and make sure I understand the City's commitments and constraints and how you want to proceed. Next
week, I'm available Tuesday 2:30 or later, anytime Wed, and Friday afternoon. Would any of those times
work for you?
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
[cid:image001.gif@01CCE24F.5130ACE0]
Please consider the environment before printing this message.
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is addressed.
This message, together with any attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the information as confidential and
privileged and to not disclose or use the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited. If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any computer. Thank you for your
cooperation.
Page 1 of 2
Ken Griffin - Re: North lake
From:Ken Griffin
To:John Rutledge
2/7/2012 8:44 AM
Date:
Subject:Re: North lake
CC:Clay Phillips
John
Unfortunately, I'm not available any of the times listed. I was out of the office last week and my
schedule is paying the price. I have time late afternoon on Monday 2/13 (after 3 p.m.), Tuesday
morning 2/14 (around 11 a.m.) and Wednesday afternoon 2/15 (after 2 p.m.). Do any of those times
work for you?
Also, on the Corps visit, we need to ensure that Luminant is kept in the loop based on the access
agreement which gives them the right to control how the information obtained during the site visit is
shared with other agencies. And, if we need to start in the fall, we probably need to revisit
the Luminant access requirements so we can begin the next phase of access to the site for testing
purposes.
Ken Griffin
>>> John Rutledge <JLR@freese.com> 2/3/2012 8:43 AM >>>
Ken,
They made their site visit to North Lake the other day and everything went well on that. They're pulling
together their information and trying to set up a visit with the Corps to try to get a handle on exactly
how far we can go to reduce permitting efforts. The schedule for development is to have the lake
lowered and some edge work done to allow development of their Phase 2 in Nov. of 2013. I don't know
how that fits the City's schedule, but to match it would mean starting construction in the fall of this
year to lower the lake, which backs into starting the field exploration and the design this spring. Those
are general dates without any scheduling effort behind them. I wanted to start the discussion about how
the City wants to proceed and thought it might be helpful for me to come to your office to meet and go
over the next phases and make sure I understand the City's commitments and constraints and how you
want to proceed. Next week, I'm available Tuesday 2:30 or later, anytime Wed, and Friday afternoon.
Would any of those times work for you?
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
[cid:image001.gif@01CCE24F.5130ACE0]
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F30E46DC...3/5/2012
Page 2 of 2
Please consider the environment before printing this message.
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is
addressed. This message, together with any attachment, may contain the sender's organization's
confidential and privileged information. The recipient is hereby notified to treat the information as
confidential and privileged and to not disclose or use the information except as authorized by sender's
organization. Any unauthorized review, printing, retention, copying, disclosure, distribution,
retransmission, dissemination or other use of, or taking of any action in reliance upon, this information
by persons or entities other than the intended recipient is prohibited. If you received this message in
error, please immediately contact the sender by reply email and delete all copies of the material from
any computer. Thank you for your cooperation.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F30E46DC...3/5/2012
Page 1 of 2
Ken Griffin - RE: North lake
From: John Rutledge <JLR@freese.com>
To: Ken Griffin <kgriffin@coppelltx.gov>
Date: 2/7/2012 9:35 AM
Subject: RE: North lake
Monday at 3:00 will work best for me of those times. I’ll plan on seeing you then, unless I hear anything
different.
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
From: Ken Griffin [mailto:kgriffin@coppelltx.gov]
Sent: Tuesday, February 07, 2012 8:44 AM
To: John Rutledge
Cc: Clay Phillips
Subject: Re: North lake
John
Unfortunately, I'm not available any of the times listed. I was out of the office last week and my
schedule is paying the price. I have time late afternoon on Monday 2/13 (after 3 p.m.), Tuesday
morning 2/14 (around 11 a.m.) and Wednesday afternoon 2/15 (after 2 p.m.). Do any of those times
work for you?
Also, on the Corps visit, we need to ensure that Luminant is kept in the loop based on the access
agreement which gives them the right to control how the information obtained during the site visit is
shared with other agencies. And, if we need to start in the fall, we probably need to revisit
the Luminant access requirements so we can begin the next phase of access to the site for testing
purposes.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F30F04FCi...3/5/2012
Page 2 of 2
Ken Griffin
>>> John Rutledge <JLR@freese.com> 2/3/2012 8:43 AM >>>
Ken,
They made their site visit to North Lake the other day and everything went well on that. They're pulling
together their information and trying to set up a visit with the Corps to try to get a handle on exactly
how far we can go to reduce permitting efforts. The schedule for development is to have the lake
lowered and some edge work done to allow development of their Phase 2 in Nov. of 2013. I don't know
how that fits the City's schedule, but to match it would mean starting construction in the fall of this
year to lower the lake, which backs into starting the field exploration and the design this spring. Those
are general dates without any scheduling effort behind them. I wanted to start the discussion about how
the City wants to proceed and thought it might be helpful for me to come to your office to meet and go
over the next phases and make sure I understand the City's commitments and constraints and how you
want to proceed. Next week, I'm available Tuesday 2:30 or later, anytime Wed, and Friday afternoon.
Would any of those times work for you?
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
[cid:image001.gif@01CCE24F.5130ACE0]
Please consider the environment before printing this message.
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is
addressed. This message, together with any attachment, may contain the sender's organization's
confidential and privileged information. The recipient is hereby notified to treat the information as
confidential and privileged and to not disclose or use the information except as authorized by sender's
organization. Any unauthorized review, printing, retention, copying, disclosure, distribution,
retransmission, dissemination or other use of, or taking of any action in reliance upon, this information
by persons or entities other than the intended recipient is prohibited. If you received this message in
error, please immediately contact the sender by reply email and delete all copies of the material from
any computer. Thank you for your cooperation.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F30F04FCi...3/5/2012
Page 1 of 3
Ken Griffin - RE: North lake
From:Ken Griffin
To:John Rutledge
2/13/2012 1:52 PM
Date:
Subject:RE: North lake
John
It seems like Roy Wilshire and Bill Walker will be joining us this afternoon. There is more discussion
on the lake edge and they have updated maps.
Just didn't want you to be surprised.
Ken Griffin
>>> John Rutledge <JLR@freese.com> 2/7/2012 9:30 AM >>>
Monday at 3:00 will work best for me of those times. I'll plan on seeing you then, unless I hear anything
different.
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
From: Ken Griffin [mailto:kgriffin@coppelltx.gov]
Sent: Tuesday, February 07, 2012 8:44 AM
To: John Rutledge
Cc: Clay Phillips
Subject: Re: North lake
John
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F3915A6C...3/5/2012
Page 2 of 3
Unfortunately, I'm not available any of the times listed. I was out of the office last week and my
schedule is paying the price. I have time late afternoon on Monday 2/13 (after 3 p.m.), Tuesday
morning 2/14 (around 11 a.m.) and Wednesday afternoon 2/15 (after 2 p.m.). Do any of those times
work for you?
Also, on the Corps visit, we need to ensure that Luminant is kept in the loop based on the access
agreement which gives them the right to control how the information obtained during the site visit is
shared with other agencies. And, if we need to start in the fall, we probably need to revisit
the Luminant access requirements so we can begin the next phase of access to the site for testing
purposes.
Ken Griffin
>>> John Rutledge <JLR@freese.com> 2/3/2012 8:43 AM >>>
Ken,
They made their site visit to North Lake the other day and everything went well on that. They're pulling
together their information and trying to set up a visit with the Corps to try to get a handle on exactly
how far we can go to reduce permitting efforts. The schedule for development is to have the lake
lowered and some edge work done to allow development of their Phase 2 in Nov. of 2013. I don't know
how that fits the City's schedule, but to match it would mean starting construction in the fall of this
year to lower the lake, which backs into starting the field exploration and the design this spring. Those
are general dates without any scheduling effort behind them. I wanted to start the discussion about how
the City wants to proceed and thought it might be helpful for me to come to your office to meet and go
over the next phases and make sure I understand the City's commitments and constraints and how you
want to proceed. Next week, I'm available Tuesday 2:30 or later, anytime Wed, and Friday afternoon.
Would any of those times work for you?
Thanks
JLR
John L. Rutledge, P.E.
Freese and Nichols, Inc.
4055 International Plaza St 200
Fort Worth, TX 76109
817-735-7284
jlr@freese.com
[cid:image001.gif@01CCE24F.5130ACE0]
Please consider the environment before printing this message.
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is
addressed. This message, together with any attachment, may contain the sender's organization's
confidential and privileged information. The recipient is hereby notified to treat the information as
confidential and privileged and to not disclose or use the information except as authorized by sender's
organization. Any unauthorized review, printing, retention, copying, disclosure, distribution,
retransmission, dissemination or other use of, or taking of any action in reliance upon, this information
by persons or entities other than the intended recipient is prohibited. If you received this message in
error, please immediately contact the sender by reply email and delete all copies of the material from
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F3915A6C...3/5/2012
Page 3 of 3
any computer. Thank you for your cooperation.
file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPGrpWise\4F3915A6C...3/5/2012