Loading...
Lesley Retail (QT)-PT111128 T H E• C I T Y O F C OF'FELL CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant: \--\ A N2v-A ba Date Submitted: Address of Applicant: ) (y7,,3 ]� �,� ~76 1/1 Phone Number: c, t`1 FAX NUMBER: 1 `Z - &'&- S Location of Construction (address, if available): (442,z\-- L4SLEy 1 ADJ 4 ZLdcl.S A f-3 S bdivision Section # Block # Lot # OR a utK "T'Z,t Survey /Abstract # Acreage Location description (attach vicinity map): 1. Type of proposed construction or development: ( ) Residential ( ) Alteration of a natural waterway drainage course (4 Non - residential ( ) Other (describe & attach drawing or sketch) ( ) Placement of Fill (in right -of -way or on private property) 2. Description of Construction Permit requested: (>0 Paving ( ) Median or Landscaping ( ) Box Culvert (0 Sidewalk (X) Water Main ( ) Rip Rap ()() Drive Approach (j R.C.P. ( ) Fill Area ( ) Excavation (A4 Sanitary Sewer Main ( ) Drainage Channel Excavation ()0 Fire Lane ( ) Flume ( ) Slope Protection /Retaining Wall ( ) Bridge ( ) Inlet ( ) Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4. Applicant shall provide a copy of approved plans, specifications and related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ 0% .1 Date Paid: \i,V \ NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way not approved by the City Engineer. • Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972 - 304 -3600 Street Department @ 972 - 462 -5150 Fire Department @ 972 - 304 -3500 Engineering Dept. @ 972 - 304 -3679 • Attach barricade plan / trench safety plan of a lane or street closure. (Required) • It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As- Builts consist of 1 set full size paper copy, 1 set full size mylar and CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.nz. until 3:00 p.m. ONLY unless otherwise approved by City Engineer. • A pre- construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. # 11P Signature of Applicant Printed Name Contact Number 4/&.0e-r L ICO45 - Ito 14‘9, City Inspector Contact Number(s) FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? ( ) YES (` j'NO If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? ( ) YES ' NO Are other federal, state, or local permits required? ( ) YES �Jj NO ,ERMIT APPLICATION APPROVED () PERMIT APPLICATION DENIED N2Y Approval Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. w tu -° E gy a U E 'co 11 V -. \ f+ (} N U V • ct o y yC f4\ �• ..c.4— • °' & ,t czt to .10 ° ° a) 0 y C a) a, ;�° zE- ::., Wz ° C w 0 N • "zi �� i aw a, u ° v w cn � L� ~ g 9 • 4 w w .O .� ~ O Q O �J � ry V C/1 0 o .- �U w � C o -tt o a) O V a 4•" z a ; ' V ct° rip . U 11 I y ! cC p er • , V V "' /1 at y u ^ 1..a , V at (� (� t N ♦_ w . u^� ��1 A I 1- , U • 4 . '� Z O L7 E c1�:� �Z o N, a 5 p Z ty b A U > 6> U O a . co — � N 9 o o w a z ,� • • al z = v �� r -0 -6 F. A a • v at a) tID a� c.� .- SM. = c, • E Cll W a c,_, ;� -.— � � , y am ' y W e CL) O V o • E* U 0 o Z w .Y. O h o es Z W H 3 p , W Q, .� o d ,_,71 O W Q x ° "E:$ ° — cd E- W ,-, H a Q W -� 4 - u a v] V� V � 0 o U Frost Bank 30- 9/1140 028767 Harman Construction, Inc. Alta Mesa 1 Rogers Float] I DATE r CHECK NO f AMOUNT Fart +;Vurth. TPx1 6 ''U:' 11/22/2011 28767 1 $5,483.56 (817) '336 -5730 j L I VOID At=TEH 120 DAY ******* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *FIVE THOUSAND FOUR HUNDRED EIGHTY -THREE AND 56 / 100 DOLLARS CITY OF COPPELL i i ., 255 PARKWAY BLVD C'OPPELL TX 75019 A t h rize Agent n H/'P. r t, , : rla _ ,, _ 1 CHECK DATE I 1 /22/201 1 CHECK NO. 28767 INVOICE. INV DATE DESCRIPTION GROSS AMOUNT ADJUSTMENTS NI_ I AMOUNT INSPFEES 1 1 %211201 1 qt coppell 5,483.56 5,483.56 VI, NDOR NO. VE NDOR NAME "I OlAL GROSS 101 \I, AD.I. 101 \I, NI 1 03119 CITY OF COPPELL 5,483.56 5,483.56 i = '' •_. 9,01i, It 2.2J/ 1 . H, A- • - 4 � V:.+' N ii / ♦ e; -4..- I / e t/ �rn 1 c 483.56i rU ,, � o _�.' ` tom 1 .Z ri Q CA 2 F �w N 3 r , .,. ' of S ' F'M1' �: - - r 12/28/2011 09:53 8173365797 HARMAN AND SON PAGE 01/06 1633 Rogers Road Fort Worth, Texas 76107 Harman 817- 336 -5780 Construction, l nc, Fax 336 -5797 Fax To: Coppell Engineering DepartmentFrom: Greg Chambers Fax: 972 -304 -3570 Pages: 6 (Including Cover) Attn: Mike Garcia Date: 11.28-11 Re: Quiktrip 969 cC; ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle • Comments: Attached are the overall estimate and the utility breakdown for the inspection fees. We would like to schedule the preconstruction meeting as soon as possible. Thanks, • 11/28/2011 09:53 8173365797 HARMAN AND SON PAGE 02/06 Copy Information to Clipboard for QulkTrip Use Only After unprotecting this sheet, Click on this Copy lnformellon to Clipboard button, than click on the Cost Estimate file and click on the Paste Information from Clipboard Button to copy from this Bid File to the Cost Estimate File — CONTRACTOR BID FORM PROJECT: gum Trip Store No, 909 — CONTRACTOR NAME; Hannan Construction, Inc, DATE: 10/1712011 Description _ Gip Totals Capital Totals I at GAneref Re ulrements Comments Home Oflite Overhead — St0,467.11 . Warman Constructbn, Inc. HarnSan Conatrucliph, Inc., Servpro Of Prjiitnt Ovemena - • . 602 334.00 Eaai Fort Worth Profit % of Cortetruclten (Emer % only) 2,5095 $41 310,91 9$83 93 Harman COnstructlm int. Construction Tax Arizona On Enter 'N, onl 0.00% 50.00 $0.00 NIA l � r Total' 01 General , ' '' `u ReOa•IemarltR $134,138.02 , 60,563.93 ' :..' iI i , ,:, 02 Site Conditions ., , , " ! j1 '� ' Demolition , ., „ 1 i,l , c.. � _ .� $2, $00.00 , R In_Cupp Construction, L.P. Remedratlon I „ j,, ;' ' it ' I'I` r IhG� , r , + ,1 W • u' , ;il Total; 02 Slte 40.00 — N/A �.. ,r •, „j „ ii • Conditions �n '��' ,' � li2'` 250o0D ,i, ' 03 Con y-me — . Concrete for Building Footings and Slab Only, Includes ragging, forming, rednforcing steel, wire , dowers,_ top footings s, �� , etc. - T;37,835.00 h 7 B and Concrete, Inc„ Finley Concrete for Trash Enclosure Footings and Concrete Only, Includema itr and Pest Control s digging forming reinforcing steel. wire, dowers step footings, slab, gVE Precision GonOrete, Inc., Finley 02,80D 00 1 :r Termite and Post Control Total: 03 Concrete 640 G36.00 I ,221111=177,, 04Meacnry Building Incwd c '! '� . g e, b ric k, block, mortar, rebar, grout, stone, EFTS, stucco, etc,, (See arawtngs & speclgc3tlons for OF equipment.) 663 500.00 i• 5 & W Construction Trash Enclosure. includes brick, block, mortar, roper, grout, stone, FFIS, stucco,: tlr ewin es & epec ifieatfons for Dl equipment.) 500 OO f , I • '' " `,, S & W Construction ry Fuel Canopy Includes prick block mortar, rebar, grout, atone, FFIS, --- for OF equipment.) I ; 315,x00,00 S & W Construction � stucco etc. (See drawings & spaclflca[lana P � Total: Mason 1 . il ry 4ag,000 00 515,200.00 I 1 Si -; ' ,r 05 Motile Building Structure( Steel • includes structural steel, framing Joists, roof decking, accros ladder, wafer heater &fond, sink supper! breckelc, i'•,.‘ f Falling, decorative metal:, trash enclemire bollards, etc. (See drewln s & s clncefiens for Dr• a ul menl. Fuel Cane - 00,00 B1 OWNER Canopy Includes structural steel, framing Joists, support r 7 ,1 brackets bollards, decorative motets etc (See drawing: R 4 xpetfflcallone for OF e•ut • men!. . ' 1 ,1 00,00 BY OWNER :.. ,. . • , '�A,. ., ' TOGII:O5Metals 00.00 &DDO ',, '1 :� ;, i 06 Wood & PInstics Millwork Install: Overhead. storage cabinet. bathroom vanity top, r bathroom stall doors, sink cabinet, cove base and hand sink install. r See drawings & specificatlb fo r OF egulbmertt.) 07197 00 . Millwork Fascia Install, etc, (See drawings & speclFcatlons for OF T S TI•ton G P O ul moo : Millwork Installation - Fountain Bar, lap, etc. (See drawings & , r i ti.7 S' e85•DO TI • ton G P a ecticauons for OF c u meet Food Bar Install, etc. (See drawings & SPeclffcstlons for OF , i $4,160,00 Tipton G P equipment,) — 1 3 Millwork Installation Coffee Bar, lop, etc. (See drawings & ` + •°'" 2 029.00 Ti ton G P e Ifeation for OF eg ul g ment,,) 9r *I Millwork Installation - Checkstand, top, carpel, 63 950.00 TI•ton G P P dtc. (See tl .'Swinge & ; , r apeciSCationa for OF equipment) r, .. 0 44 750.00 TI•tan G P Millwork rork Installation h Bedsta ear, top, etc, (See drawing; & ' i 1'I - rr, s�Seci for OF enui a nt ; j, ' !.', '. d «., { i 02 790 00 TI !en G P • r �•. �',, ;, - ! r ,:TOtel:oeWeodA . 'J""` "� Plaetics 07 104.00 2446100 , 4 ir "'. li ; 07 Thermal & Moisture Protection Includes dempproofinp, waterproofing, well & roof Insulation, roof membrane & acoescorles, metal flashing, all caulking associated with i l il ` ^ ^ building, building Oxterlor, etc, Also Includes all wood blocking . .- i2 • associated with the roof. (See drawings & spentneations for OF A " , `t ` BOUiement. r 641,192,00 1 i. {, .,.. - t ,' r Toter Roofing & Recon ptruction 11/28/2011 09:53 8173365797 HARMAN AND SON PAGE 03/06 i" Total; 07 Thermal & I I --' � Motseuro Protection Sat 792.00 � ` +I 08 Doors &Windows _ Includes doors, windows, storefront, roof hoick louvers, vents, access ' ' door pencils, restroom doors, hardware, access cantrol hardware, glazing, mirrors, etc. Also includes all wood bleckinp associated with doors and windows. (see. drawings & sprelfreation8 for OF equipment) F a F Woodard Builder g apply, County Glas: & $35,437,35 ' p Mirror Inc ' • � ., �, , .A. " „I r Windows �' : 1� , $3s : � �, _, , 09 Finishes incudes non - structural wood or metal Framing, drywall, tape R — , ; -,,1 mudding, the (wall, floor, etc.). bedding materlat, ceiling gad & tiles, acoustic Insulation, 'fierier painting, ° p rig, shades, etc, Also includes any !, Newport Builders, Flarman Construction, wood blocking in webs, plywood aheeth nSl, RFP, etc. (Sec drawings & s cificetlons tar OF a ui men!, Inc„ act Paint Cort,pany, Texas The .13g 118,00 (�Contractore Painting Exterior (Sete) — 36 412.00 The Paint Com • .”' - 1 + 09 Finishes X 149 '` � ,' T6tAk The o tractors Fuel Island Tile CFC 5775 CO Texas TI • ' I 53DO0 5775.OD ,:j1',' ' ' r 10 Specialties Includes wall & door protecllen, toilet eccessorieS, mall boxes, etc, See drawings & ap I equipment) ' $2 400 00 I ` ( eeiFlGatlons fo r OF — Tbtan G P Hernia II. Construction, Inc, 12 , r ', ' , „ ',; a, '. l I „ , Total. 10 Specialties 52,460 00 6' , 1' 11.ulpment ' i • ' . ". ill ,,�� "+l .`, 11,;' ' ') includes signage (Interior & exlcrlor), building LEO, display cases, air oomp(CSSor, banking, refrigeration display equipment, weik•fn w1 freezer /cooler& freezer /cooler frames & doors, double aCtlor cooler I doors food dispensing Oda Ice machines ro edge gusn etc I See drawtngg & speclflcattor s for OF equipment) ll '' 1 724,'13 Slmpeon s Services Total 11 Equipment $12 724 33 {' 21 Fire Suppression Building Fire Suppmssion - water service piping, standpipes, sprinkler systems, ale 510,010,00 "., ` Flrotrol Fire Protection sy,:hems tle r S ep. re slon - w a piping standpipes, a Tota1.21 in ` , Fuel Canopy pp arse seals i A 'i si s rinKier a ,. , „ , , Fire .. '' Supprazalon $19,01G,00 ,..0',. n 1 }p i_[Mr� 000 /A ,, � .n . ,„ ,, , 22 Plumbmp T ' Piping, pumps, Sanit waste & venting pipe, FOG disposal systems (Inside building grease interceptors), roof drains, water heaters," • plumbing fixtures, natural gas lines, etc. All utilities ere to ne extended 5 °inside of building for tie Ins. (See drawings & specifications for OF equipment) $65,80D DO - � � Pioneer Plumbing Contractors 23 HVAC Includes HVAC units, duce week, duct Insulation, nxheust units, e tc. See drawings & specifications for OF equipment) $4.1 830,00 I'.' r : ' ..). C & S Air, Inc. 1t Include., refrigeration piping refrigeration compressors and condensate units See drewin s & S cflcellona for OF Pf ul•ment. ;,, �y, •e y -. $49 551.88 Horton Commercial Refrigeration scion ,..'.,•:,.,, •' •,,,, • . . Total: 23 HVAC $41 2B Electrical Electric • Building (See drawings & apeclfia Lions for OF equipment) 591 425 7 '' '' j ! Close Electric OclecIrlc - Site (See drawings & specifications for OF equipment,) $49 510.00 I , + ' C'1 Close Electric •rs- �y Checkstand Electrical • Oen 111 stores only m ` ` ti, , ' 54,975,00 Close EloOtrtC Electric -- Fuel system and Canopy Electrical: All electrician work Ir ' ; ,yrw;r, releted to the feel system, including power, low voltage and �` f communication condulueonductore es required, excavation and backfili i , t r, 4 ",, 11 for such, both in the tank area and 01 the dispensers, power to the canopy for lighting, LED and spare conduits and installation of related u ' f I ` { ` Y r , tl , hi. eq q uip 1 pmenE lights etc (See drawings & specifications tor OF , : 1' ! t : ! ; * ' ". +•'f $_42,780.00 Class F , , �., ' Total 28 Electrical '; , { , ) ;• { S14a 93s oD $a7 7ss,90 ' ' + , r ' t = munication 27Gom Communlce(4Qn W,nn (Te lap0o a da etc) 7 i i + 64 200.00 Close Electric `' r,,., , ^ 6+ i + , . � 76181 27 ' a 14 t, , nicati6n a al p 11s t r;1610t $4.200,0D ,.. Gomrnu ,„ � .0 ,,. 28 Electronic Safety & Security ., fa ' ` ` r ",( $3 600 00 Close �._ Safat 6 Secure video & fire etc 1 ` • •r . ' . { ' �� •. - rota!: 28 Electronic r 3 +l j,, ),� ly'� , . Safety & Secur1, N!fare..UC f+'4 51,400.00 .. .. ' r 1.1/28/2011 09:53 8173365797 HARMAN AND SON PAGE 04/06 31 Earthwork Mobilization drthwork a I . E Cupp t Clear a grubbing, earth stripping & stock Inn , raam S2 500.00 r I excavation & frll etc P g grading {rough & one), I a R-E, Cupp Construction, ConglructWn L,P. L P„ Harman Sind 035'90 _ , Inc, onetruclfon In Erosion a sediment controls, slope s, soil treatment & R.E, Cupp Construction, 1-,1 North •rotectfon etc, Z. '.t. / Texas Erosion Spectencts, Harman Piles tun cite etc $74 070,2 , l 0 Construction Inc 30,00 I N/A 32 EXterior Concrete paving aggregate fabric, cur bs 8 p Q utlrrs, sidewalks, n get ,, ,.. � ' Pole baser, sidewalks, radius protectors, stamped concrete, acoont r I ' concrete, handicap ramps, reinforcing steel, mtaininglscreen waits, miscellaneous concrete etc. TVs_ Precision Concrete Inc • , „ North 5407 344,00 y w Texas 8omenhr. Inc. -0,00 I . 1 N/A 313 693,00 -II J, Parker 30,00 $tees used rails ornamental Iron fenctn etc. N/A Bollards Around Building (See drawings a specifcations of OF 50,00 N/A e • ul •men[. Wood tench. etc. • 000.00 "BVE Precision Concrete, Inc. $0.00 Parkin. tot stridn• road sin .In• ate, � N/A .2 985.00 ' - 1 Sirt • . -A.• one Landscaping - includes topsoil, sod nr decomposed granite or -..-_- landsca• . rock sod seed droseedint shrvbbe trees etc. Irritation etc. 373 375.00 i Unl•ue Environments Inc, Special Projects - Includes trams signal work, public roadwork $24 000.00 Improvement: Escrow accounts etc, Unl. a EnWronme�lts, Inc. Fuel Cane • Foetln Exoaveuon 5tee13Concrele 3000 N/A h ii'+ r i Total; 32 rior 2 Exte row Exto $49 482 BVE Precision Concrete, Inc ' i +++ m utilities • Im x569 397 D0 49 492 00 l ! a ; 1,,. + y I ' 1 ` `'`, i piping In p fi equipment, etc. All Water utility distribution f & - extended to within 5' of build! • for tie -Ins. are to be Natural pat utility distribution piping &equipment, etc, Natural pas tin- 374 763'00 i More COnstruasan inc. ins MI be at the meter •laced b •rovider Sanitary O.DO ' g distribution piping g equipment, etc. /111 utllnles BY OWNER ry utlnry sewage are lo be extended to within 5' or buiidin r for tie -Ins, '"7 Stone waterutilitydistributionpiping &equipmment,externalgrease 3f51f600 I'; MoraConatrucllon nc. traps, etc. All utilities are lobe extended to within 5' of building for Ile- ` "' `7 Fns, ! ' + 32 150 00 I' r p • Electric unlit transmission & distribution transformers etc, MOra Canshactibn inc. Foal Cane. Drains and tie -Into nearest deandul. 36 75000 1 1 Close. Fresno Fuel Tank Installation: An contractor furnished materiels, equipment '. 328 996 More Construction inc and tabor associated with Installation of the toe! tanks, including ; -r-^^' � ,., excavation 01 the tank hole, haul off of spoils from .hg tank hole, beckflll material, shoring, tank placement, deedmcn, streping end , , '.. ri ,, - - , ,;- '11,-,' i concrete paving over tank hole. (See drdwtngs & specifoatlons for OF - •ut•ment. 395 769 Ha •er Malnten0nce Multi Product Dispensers Rough in81111: Includes tea placement of the Island forms, sumps and related equipment associated with fuel dts•eneers. See drawings & specifications for OF e•u' i + • meet, 'V $7 5D3.0o He •nr Maintenance Dispenser Setting and Stan Up: Includes the handling and setting of r dispensers, start up and compliance testing of the fuel system. (See i ` ' I tlrawlnds e, apectFlcetions for OF equipment, 3 000.00 He .. r maintenance Sumps and Risers: Includes the placement of the sumps and risers and related equipment in the tank area, as Weli as the setting 1• transition sumps, alt sump lids, at grade It d;, cleaning or sum ' See drawings a s ecintons for OF equipment eA I f P s, etc. . UG FueINR Piping Instaltaflon: Includes all VG fuel pip e 312 500,00 He •er Maintenance haul of spoils, beckfilt materials and Installation associated with the ' installation of Lin fuel pipe and vapor recovery s•eclAratfons for OF e• ul. mint Piping. (Sae drawinga & I ( ' lt r.I 328 000.00 He •er maintenance ,.,;,,,,;.v,:,. ' ''r !'r'rr $128769.00 ,, $175 748.00 �� ;� ' , +: .. , rva, Total PrIcr&MM 1704 480.47 y Li...:_.:, ; - Z 941.t4 2097 421,91 For QT Profit % or construction - Total Otv 2-3 Overhead 3, Including Project Tao I; 31 052 676.45 .. a a. aunt nmea % of tax 1 357.27 Construction Tax Pra eel Co 1 (except tax x -0.00 5000 Total Conctructlon Tax 50.00 0,00 50, 00 30,00 11/28/2011 09:53 8173365797 HARMAN AND SON PAGE 05/06 Mora Construction, Inc. PO BOX 154897 Irving, TX 75015 Phone (972) 438 -8811 Fax (972) 438 -8844 PRIVATE IMPROVEMENTS QT #969 S Belt Line Rd & Dividend Dr. Coppell, TX ITEM DESCRIPTION UNIT FIRELINE QUANTITY PRICE AMOUNT Install 8" DR 14 PVC Pipe L.F, 40 $33.00 $1,320.00 Install 6" DR -14 PVC Pipe Install 4" DR-14 PVC Pipe L.F. 386 $32.00 $12,352.OD Install 8" Gate Valve L.F. 343 530.00 $10,290.00 Install 8" DDCNault EA. 1 $1,100.00 $1,100.00 Install 6" SS Riser 1' Above F.F. EA. 1 $10,900.00 $10,900.DO Install 4" SS Riser 1' Above F.F. EA. 1 $1,80'0.00 $1,800,00 install Fire Hydrant EA ' 1 $1,600.00 $1,600.00 Install FDC EA. 1 $2,500.00 $2,500.00 EA. 1 $3,100.00 $3,100.00 STORM SEWER FIRELINE TO TAL $44,962.00 Install 12" SDR -35 PVC Pipe L,F• Install 10" SDR -35 PVC Pipe 110 $27,00 $3,300.00 �-F• 178 $21'• Install 6" SDR -35 PVC Pipe 00 $4,806.00 Install 4" SDR -35 PVC Pipe L.F. 170 $24.00 $4,080.00 Install 12" Sloped Headwall L. F' 468 $22.00 $10,295,00 EA. 1 $1,000,00 . 1 ,0.0)() 00 STORM SEWER TOTAL $23,482.00 SANITARY SEWER Install 6" SDR -35 PVC Pipe to Building L.F. (Excludes Sample Well & Grease Trap) 282 $26.00 $7,332,00 WATER Install 1 1/2" Service to 5' of Building L.F. 271 $26.00 $7,046.00 STORM SEWER Install UCP Drains L.F. 1038 $16.00 $16,608.00 PRIVATE IMPROVEMENTS TOTAL $99,430.00 11/21/2011 IVInra (rnncfri,r.fi.,., 11/28/2011 09:53 8173365797 HARMAN AND SON PAGE 06/06 Mora Construction, Inc. PO BOX 154897 Irving, TX 75015 Phone (972) 438 -8811 Fax (972) 438-8844 PUBLIC IMPROVEMENTS QT #969 S Belt Line Rd & Dividend Dr, Coppell, TX ITEM DESCRIPTION UNIT SANITARY SEWER QUANTITY PRICE AMOUNT Construct 4' Dia. Manhole Over Existing Main & Install 6" Stubout to Easement Line L.S. 1 $5,400.00 $5,400.00 WATER SANITARY SEWER TOTAL $3,400.00 Install 8" X 2" Tap & Service to 1 1/2" Meter Box EA. Install 8" X 1 1/2" Tap & Service to Meter Box EA. 1 $1,700.00 $1,$00.00 . 1 51,700.00 700,00 WATER TOTAL $3,500.00 FIRELINE Install 12" X 8" Tapping Sleeve & Valve EA. 1 $3,400.00 $3 L $3,400.00 Install 8" DR -14 PVC Pipe L, F. 10 $3a 00 330.00 STORM SEWER FIRELINE TOTAL $3,730.00 Install 18" Class !II RCP LP, 50 $40.00 $2,360.00 Install 5' Combo Inlet Install 18" Sloped Headwall EA. 1 $2,900,00 $2,900.OD EA. 1 `81,400.00 $1,400.00 STORM SEWER TOTAL $6,660.00 PROPOSAL TOTAL $19,290,00 11121/2011