Loading...
ST8402-CS 881109GINN, INC. CONSULTING ENGINEERS November 9, 1988 Mr. Russell Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re- Denton Tap Road Improvements from Sandy Lake Road to Denton Creek - ABQ Median Opening Request Dear Mr. Doyle: This letter is in response to your letter concerning the above. The design of the requested~ median opening north of Parkway Blvd. can be included in the scope of our work covering overall design of the project, and therefore you will not have to go through the work authorization process. The procedure for accomplishing this is as follows: Obtain a letter of Financial Commitment from ABQ Development Company stating that they will pay for the Engineering, Testing, Inspection, and Construction of the Median Opening. This letter should state that they will deposit the funds with the City within 5 days after the City Council approves a Change order covering the construction of the Median Opening. Upon receipt of the above letter of Financial Commitment, you can authorize Ginn, Inc. to prepare a Change Order for City Council consideration. We have enclosed cost estimates for the. Change Order and additional engineering costs. We are prepared to seek the Contractor's approval of the necessary Change Order, and revise the drawings accordingly upon receipt of your authorization. We have also enclosed a letter of response for your signature on City of Coppell letterhead to Jerry Parche' Consulting Engineers which covers the above. Please call me if you have any questions. y~e GiMn, P.E. enclosures cc: John C. Karlsruher, P.E. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900