ST8402-CS 881229The City With A Beautiful Future December 29, 1988, Mr Jerry Parche Parche Consulting Engzneers 6001W. Interstate 20 Suite #209, LB 32 Arlington, Texas 76016 Dear Mr. Parche: P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 FILE COPY RE: PROPOSED MEDIAN OPENINGS - DENTON TAP ROAD, COPPELL, TEXAS On December 12, 1988, I received the December 8, 1988, letter from Univest Development Company under the signature of Parks of Coppell Joint Venture, (PCJV), Michael J. Allen. This letter recognized your letter to me dated November 30, 1988 as correctly describing PCJV's agreement with ABQ for location and cost sharing of the proposed medians. He asked if I had any questions and copied some seven (7) other people of which I know of four (4). I have reviewed the voluminous correspondence made available to this office on this matter and have had a few discussions with you and Ginn Inc. on these median requests, including yesterday with Jay Chester and yourself. I do not know if I have all of the correspondence that you or someone might think that the "City of Coppell" has and should know in responding to this/these requests. However, toward the end of this summary and guidance letter we will cover that. I would like to, in-like manner, cover the copius correspondence on the Water Main requests (although you said Friday that Ginn wants too much for going under the box) as well as the Parkway Boulevard West Extension . While I will allude to those other two requests for public improvements and provide guidelines as to how to approach this office on them in general; the specifics will be covered in separate correspondence for expediency and clarity on each item. All of these improvements are related to development and requests satisfied here or elsewhere in no way acts for or precludes future decisions by City staff, DRC, Planning and Zoning Commission and City Council. Now to the matter of the median cuts, I will cover the letters of record, that I know of, and then in summary cover the procedure that you must follow and quarterback as the requestor and applicant, etc. I hope this letter suffices for the "executed response" you need to have, as cited in your December 22, 1988 letter. ...continued/2 I have sent your November 30, 1988 letter to Ginn Inc. for a response just as I did your November 3, 1988 letter requesting the necessary information and recommendation for process. ! sent this November 3, 1988, letter to Ginn Inc. on November 4, the day I received it. I then responded to you in a letter dated November 7, 1988, that I thought you had not received , but as you indicated last Thursday a week you did receive it. (Even though you have not responded to it.) As we discussed in our telephone calls, you can use that "DRAFT" November 14, 1988 letter as your guidance for proceeding with these median cuts north of Parkway. You must see that all the proposed financial transactions are cleared and approved by Frank Trando, Director of Finance. Your November 3, 1988, letter carried with it an October 7, 1988 letter to Ginn Inc. with attachments. (the October 7, 1988, letter was submitted at the direction of Ginn. Inc.). That October 7, 1988, letter referred to a July 26, 1988, letter or communication between ABQ and Univest citing no progress on agreement regarding the proposed median cuts. Further communication between Ginn Inc. and you was requested regarding construction schedules and 'need to know' location of median cuts south of Parkway Boulevard. Also requested was notification from Ginn Inc. to Univest of scheduling requirements on this matter. Then I have a letter dated November 22, 1988, to you from Michael R. Allen on the "Denton Tap Median Breaks" referring to your November 8th and 9th letters and approving stations for three median cuts, specs on median cut widths, and no left turn lane needed for south bound traffic at this time. One cut was identified as Mills Lane and I am not aware of a Mills Lane except an outlot numbered "2" that is currently being used as the construction road for the New Coppell High School. As stated in my November 7, 1988 letter, I need to see the development plans either existing or proposed that relate to the proposed median cuts. You as the applicant must furnish them as apart of your initial request package or at least your package that will go to the City Council for approval of the median cuts, change order, funding etc. There is a September 13, 1988 letter from you to Mr. Allen on median breaks that was copied to Mr. Ratliff and not to me. continued.../3 I hope that I have'covered the situation. I will transmit the response to your November 30, 1988, letter when I receive the information from Ginn Inc. In the mean time, may I get from your client(s) a proposal on these median cuts as desired. Please keep'the requests separate (e.g., North of Parkway Boulevard and South of Parkway Boulevard). Likewise, the request to put in the related work for your Parkway Boulevard West Addition, now in review by DRC. The same is needed reqarding the numerous requests for water mains. I got a request from Ginn Inc. but we need the request and proposals from your client showing what commitments will be made and when and related to what process and/or "agreement," etc. If you need any other information and/or need other direction, please let me know and we can set up a meeting with the appropriate City personnel so as to expedite your needs and ussell R.eer , p E. RRD:kg xc: Ginn inc. Frank Trando, Deputy City Manager/Director of Finance Steve Gotam, Director of Public Works Shohre Daneshmand, Civil Engineer Taryon Bowman, Planning and Zoning Coordinator Jay Chester/AB0 Development Company Mike Allen, Univest Development Company RRD:kg PROPMED