Loading...
ST1002-CS110520(11/30/2011) Ken Griffin -Fwd: Old Town Coppell Updated Estimates and Review Page 1 From: To: CC: Date: Subject: Attachments: Town Coppell Mindi, Keith Marvin Hurley, Mindi Griffin, Ken 5/20/2011 4:08 PM Fwd: Old Town Coppell Updated Estimates and Review Meeting Old Town Coppell Developer Costs.pdf; Old Town Coppell 90% Cost Summary.pdf; Old Project Breakdown Exhibit.pdf Here is a revision to the cost breakdown we discussed yesterday. We're still working on the portion of the design cost that would be attributable to the developer. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 »> Dan Prendergast <drp@freese.com> 5/20/2011 10:36 AM »> Keith, Attached are the updated cost estimate spreadsheets and exhibit based on our conversation yesterday. added in the private on street parking to the developer costs. I also removed the electrical conduit (bethel to the pavilion) from the developer costs. David Beckman will be at the Utility Coordination meeting on Tuesday so he should be able to answer any questions that you have about the street lighting at that meeting. How does 3:30 on Thursday (5/26) work for you guys to have our 90% plan review meeting? Let us know and I'll set it up. Have a great weekend Dan Prendergast, E.I.T. East Transportation /Infrastructure Freese and Nichols, Inc. 1701 N. Market St., Suite 500 Dallas, Texas 75202 214- 217 -2216 www.freese-com [cid:image0ol -gif@01 CC1 6D8.A97AB5001 Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any (11/30/2011) Ken Griffin -Fwd: Old Town Coppell Updated Estimates and Review Page 2 unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. OPINION OF PROBABLE CONSTRUCTION COST MAY 20, 2011 ESTIMATOR CHECKED BY ACCOUNT NO DESCRIPTION ITEM • DEVELOPER IMPROVEMENTS 1 6" Reinforced Concrete Driveways and Alleys 4,828 SY $30.00 $144,840.00 2 6" Reinforced Stamped Concrete Driveways 107 SY $78.00 $8,346.00 3 8" Reinforced Concrete Pavementwith 6" Integral Curb (On Street Parking) 4,139 SY $38.00 $157,282.00 4 8" Lime Subgrade Treatment 9,814 SY $2.80 $27,479.20 5 Lime 206 TON $145.00 $29,883.63 6121" RCP (CL IIII ) 1,594 LF $50.00 $79,700.00 7 24" RCP (CL III) 51 LF $65.00 $3,315.00 8 4'x4' Grate Inlet 9 EA $2,200.00 $19,800.00 9 4' SQUARE SDMH 1 EA $3,200.00 $3,200.00 10 8" C900 DR 14 PVC Waterline 2,016 LF $32.00 $64,512.00 11 Trench Safety 2,016 LF $1.50 $3,024.00 12 Domestic Water Service Installation with meter 70 EA $2,500.00 $175,000.00 13 Domestic Water Service Installation (4 ") 2 EA $5,000.00 $10,000.00 14 Irrigation Water Service Installation (2 ") 1 EA $3,500.00 $3,500.00 15 Fire Service Installation (4 ") 14 EA $10,000.00 $140,000.00 16 Fire Service Installation (6 ") 1 EA $12,000.00 $12,000.00 17 8" PVC Wastewater Pipe (SDR -35) 1,395 EA $45.00 $62,775.00 18 Sanitary Sewer Manhole 6 EA $3,500.00 $21,000.00 19 Install New 6" Sewer Service 3 EA $1,800.00 $5,400.00 20 Install New 4" Sewer Service 67 EA $1,500.00 $100,500.00 21 Trench Safety 1,395 EA $1.50 $2,092.50 2212" PVC Conduit 10,671 EA $6.50 $69,361.50 23 3" PVC Conduit 24 4" PVC Conduit 25 6" PVC Conduit 26 30 "X48 "X36" Pull Box 27 4'x8'x4' Pull Box 28 2'x3' Telecom Handhole 29 17 "x30" Telecom Handhole 420 EA $7.50 $3,150.00 440 EA $8.50 $3,740.00 4,397 EA $10.00 $43,970.00 3 EA $750.00 $2,250.00 1 EA $1,100.00 $1,100.00 3 EA $500.00 $1,500.00 22 EA $750.00 $16,500.00 Developer Improvements Subtotal $1,215,220.83 SUBTOTAL: $1,215,221 CONTINGENCY 10% $121,530 Old Town Coppell 90% Cost Estimate 5 -13 -11 Page 1 of 1 Old Town Coppel and Bethel Rd Cost Summary Project Estimated Cost Bethel $1,913,930.00 Old Town (Developer Portion) $1,336,751.00 Old Town (City Portion) $2,763,779.00 Old Town (Total) $4,100,530.00 Total Project $6,014,460.00 NMOCA'73LO b — HS — NVno � . p ° ia° ji�e "� lil+ - o louibiao�j H a o a ie8 1— mi— 3 ry 103f 02id ��3dd00 NMOl 0�0 P" TAIJ awr S7oN71No�r S1NIAIAObdWl 3J f1 j OlOisv jdNl a° a NoLL�ndiSNO iON NSNN�Id a2j �]H1�8 GNb' �dd00 NMOl MO o.. svx'3i '113ddo D jo N N11 J Z WN WN W2 co m 3 �K W¢V a5 u) N - z a �3 zw p �3 a a� o 0 f1f i - -- J f l W � w � � I r -- - v _ GVOa �3HEO 3 m z � -- — -- a i0 I SS m. reo mwo - - - - -- - - - - -_ I A311V � I I ;41W„ 133b15 NO1SnOH II I I. I ss � 3 I w ` �I r lo tl ° o w a ' 's r C w . i w r 3 s N p - � w 13381 s sineai f I . I d3ad08tsVadva — \N P-- odol ld llv noA —VJIAN 3us ld nv — ADA3 —\-IAN aavHS ld lJ A3A 3sveV IA N'13M139 311s ld lN A3A3NHOavA1 —\JIAN 'w , — ld — 1 — AIN3V zea S Ij 31NI —ld c z'89Z lSIM1 l :SLlsj a°'l 51l 'WV j, aZ/81/1, dvw n3v nLnlLn zc an-L sMa LHS— NvnoAssNlmvaaAjlVN[woa 3s33a ��aslvaj[etteolda7 ewe ,�as L swU wea lad avov (11/30/2011) Ken Griffin - Re: Fwd: Old Town Coppell Updated Estimates and Page 1 From: Mindi Hurley To: Marvin, Keith CC: Griffin, Ken Date: 5/20/2011 4:15 PM Subject: Re: Fwd: Old Town Coppell Updated Estimates and Review Meeting Okay. Thank you. We don't have anything on the next Council agenda to discuss Old Town so I will just wait until you have the final numbers (including design cost) to show it to Clay if you are okay with that. Mindi Hurley Economic Development Coordinator City of Coppell 255 Parkway Blvd. Coppell, TX 75019 (972) 304 -3677 (972) 304 -3673 (fax) mhurley @coppelltx.gov www.coppelltx.gov »> Keith Marvin 5/20/2011 4:08 PM »> Mindi, Here is a revision to the cost breakdown we discussed yesterday. We're still working on the portion of the design cost that would be attributable to the developer. Keith Keith Marvin, P.E. Project Engineer (972) 304 -3681 »> Dan Prendergast <drp@freese.com> 5/20/2011 10:36 AM »> Keith, Attached are the updated cost estimate spreadsheets and exhibit based on our conversation yesterday. added in the private on street parking to the developer costs. I also removed the electrical conduit (bethel to the pavilion) from the developer costs. David Beckman will be at the Utility Coordination meeting on Tuesday so he should be able to answer any questions that you have about the street lighting at that meeting. How does 3:30 on Thursday (5/26) work for you guys to have our 90% plan review meeting? Let us know and I'll set it up. Have a great weekend Dan Prendergast, E.I.T. East Transportation /Infrastructure Freese and Nichols, Inc. 1701 N. Market St., Suite 500 Dallas, Texas 75202 214- 217 -2216 (11/30/2011) Ken Griffin - Re: Fwd: Old Town Coppell Updated Estimates and Page 2 www.freese-com [cid:image0ol -gif@01 CC1 6D8.A97AB5001 Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation.