ST1002-CS111019 Page 1 of 4 Ken Griffin - Fwd: FW: Main Street Coppell - TELCO Infrastructure     From:Keith Marvin To:   Griffin, Ken;  Hurley, Mindi     Date:10/19/2011 10:43 AM     Subject:Fwd: FW: Main Street Coppell - TELCO Infrastructure Attachments:   A-001 SITE PLAN _ Layout 031711 FINAL- Rev.01 P&H REDLINES 10-18-2011.pdf   FYI... >>> "Greg Yancey" <gregyancey@verizon.net> 10/19/2011 10:00 AM >>> Hi Keith:   Here’s a revised plan from David Alpha for Verizon.   He does not anticipate that Verizon will have any objection to paying an approved contractor to install this at their expense.   I need to compare this to our plan to see what the variances are and if I need to ask David to make any adjustments.   David said all he needs from us is the name of the sub JRJ plans to use; he will contract directly with the sub for the Verizon infrastructure according to Verizon’s allowable. He said it’s unlikely there will be any cost dispute over the allowable since the contractor is already in a joint trench.   Verizon requires platted easements before they will work outside of the right-of-way, so we will have to get well ahead of JRJ’s calendar to make sure we’re done in advance. I’ve got a call into Mike Glenn at Glenn Engineering about doing all of our work from this point forward.   Has JRJ presented a schedule yet?   Thanks,   Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Tuesday, October 18, 2011 11:32 AM To: 'Greg Yancey' Cc: 'Allen Smith'; 'Winkles, Sam (Sam)'; 'Box, Darin (Darin)' Subject: RE: Main Street Coppell - TELCO Infrastructure   Greg,  Good morning. Attached is a revised Redline DRAFT drawing that shows the additional street crossings that would be required for Verizon to place their facilities.   Please contact me after your meeting with the city of Coppell today and we can discuss the next move to getting the JTA kicked off..     Best Regards, file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPgrpwise\4E9EA9C8...11/30/2011 Page 2 of 4   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Monday, October 17, 2011 5:13 PM To: 'Greg Yancey' Cc: David Alpha; Allen Smith; Winkles, Sam (Sam); Box, Darin (Darin) Subject: RE: Main Street Coppell - TELCO Infrastructure   Greg, I have completed a DRAFT plan for the 1.5” Pipe & Hand Holes that Verizon would need placed, as well as the street Crossings you would need to place, to serve this site.   I thought maybe this may be of help, at your meeting tomorrow with the City of Coppell…?   We need to compare this layout with Atmos, and Oncor, redlines to see where we may need to make changes for the Joint Trenching effort…     Have a Good One!   Best Regards,   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Monday, October 17, 2011 4:24 PM To: 'Greg Yancey' Cc: David Alpha Subject: RE: Main Street Coppell - TELCO Infrastructure   Thanks Greg, It was my pleasure speaking with you today.  I will call Verizon Section Manager and work that end of the deal.  I do not think this should be an issue as long as we all understand that you will place and pay for all street crossings and be billed for any changes to the facilities required by you, or your subs, once the Verizon facilitates have been placed.   Please, let me know who the JTA will be and how to best contact them, so I can send them a Joint Trench Agreement (JTA) for their review and a proposal to do the work for Verizon.   file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPgrpwise\4E9EA9C8...11/30/2011 Page 3 of 4 Have a Great Evening!   Go-RANGERS!     Best Regards,   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: Greg Yancey [mailto:gregyancey@verizon.net] Sent: Monday, October 17, 2011 4:16 PM To: 'David Alpha' Cc: Keith Marvin Subject: RE: Main Street Coppell - TELCO Infrastructure   Hi David:   Thanks again for all of your time today. Here is the correct site plan and plat.   Where you see the labels “dedicated alley” there is a five-foot joint utility easement planned.   I’ll talk to Keith Marvin at the City about the timing on that, it sounds like we need to get the easements platted sooner.   Thanks again,   Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Monday, October 17, 2011 1:47 PM To: 'Greg Yancey'; cjp@freese.com; kmarvin@coppelltx.gov Cc: David Alpha; Box, Darin (Darin); Winkles, Sam (Sam); Allen Smith Subject: RE: Main Street Coppell - TELCO Infrastructure   Greg, Good afternoon. Based on information provided to me, the developers were to place the utility infrastructure within the development, per the city, which was to include piping for Verizon’s FiOS facilities, and for Oncor power, to be placed to each of the buildings, at this site.     Therefore, If the developer is not going to place the entrance pipes, etc. for Verizon facilities, as mandated by the city, then Verizon may not be able to serve this site with any type of communications services.   Please, advise as to when and why the decision was made, to not place these facilities, and by whom…   file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPgrpwise\4E9EA9C8...11/30/2011 Page 4 of 4 I look forward to working with you, the owners and the city in resolving this outstanding issue.   Best Regards,   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: Patrick Gray [mailto:pgray@wellscoinc.com] Sent: Tuesday, October 11, 2011 9:51 AM To: Greg Yancey; dalpha@wellscoinc.com Subject: Re: Main Street Coppell   David, FYI... Re; Old Town Coppell Pat Gray OSP Planner Metro North Area Wellsco Inc / VERIZON (214)770-8352 pgray@wellscoinc.com -----Original Message----- From: "Greg Yancey" <gregyancey@verizon.net> Sent 10/11/2011 8:42:29 AM To: pgray@wellscoinc.com Subject: Main Street Coppell Hi Pat:   I’m following up about this project to see what we need to do to serve it since we are not able to provide a conduit for Verizon at our expense.   If David Alpha is our new point of contact, could you forward this to him so we can determine our options?   Thanks,   Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net   file://C:\Documents and Settings\lhenderson\Local Settings\Temp\XPgrpwise\4E9EA9C8...11/30/2011 VEDRESERSTHGIRLLA..NCI,ESTAICOASS&KCPEMAILLIWF ONIOSSIMREP 1424-221)972(xT,eillvsiweL ENTTIRWDESESRPXEEHTTUOHTIW,SNEAMYNABY,AYWYNANIDEUCDOREPR ORDESUER,DECARTBEOTTONERADNA.CN I,ESTAICOASS&KCPEMAILLIW STCETIHCRA OFYTRPEORPEHTERA,SEUEREHTDNASTNEMUCODNOITUCRTSNOCESEHT XASTE,ELLPPOC on.itcurtsoncngirduanderofbeedwollofandedyobeyltcirts betsumnda,emashtiwtcilfoncyamhcihwstenmucdoonitcurtsonceshetfotrpayanrevo C.NISETAICOSSA ceedencerpekatsonitcirtsernda,secnanidro,sodeclacLoand,etats,laredeFllA:ETON EETRTSNIAM nd.ikyanfoonitcurtsoncotroirp,larutcurtsand,CAVH,onitoundaf:ro fsecivresngirneeinge teelpmocniatobrdeliburornewohettah tndedemmocersitI.ademngibeseshacrpuro &CKEPMAILLIW onitcurtsoncyanotroirprgneiseDhetfonoitenttaheto ttoughrbbeotera,yanfi,sonissimo or/and,rorre,cyepanrcsidynA.tcejorpsihtfoytirhotaunionsreprordelibuhetybedkchec ANLPEPACSDNAL/ETISLAUTPECNOC andedifirevbetsumstenmucdoonitcurtsoncesheT.erutcurtssihtetelpmocyllaitantsubs toyrassecneonitamrofnionitcurtsonccisbahe tedivorpotendedtnierasanlpesThe ûîðì÷èóé TSIMRPENOITRUCTSNOCGNIUSS IFOESOPURPEHTROFNOITCIDSURJGNIAVHSEITIROHTUAYBDESUEBOTTONS IDMAETADTOLPSIHTNO,SETAICOSSA&KCPEMAILLIWFOYTIROHTUAEHTREUNDWEIVERNIMRETNIFOESOPURPEHTROFDSEAELERSITNEMCUODSIHT ADORLEHTEBTSEW N 0"-'810"-'220"-'220"-'81 4"/14-'684"/33-'74 EETRTSTTKECOCR 4"/17-'674"/111-'384"/1-'26 EYLLA 2"/16-'160"-'350"-'054"/1-'85 EETRT SNOTSUOH 11"-'7911"-'976"-'20"-'81 5"-'50"-'2 0"-'55 0"-'550"-'05 0"-'27 0"-'180"-'220"-'18 0"-'810"-'220"-'81 0"-'04 0"-'50 0"-'04 0"-'50 0"-'04 0"-'05 0"-'05 0"-'105 11"-'79 0"-'70 0"-'900"-'302"/18-'101 0"-'20 EETRTSAVISRT 11"-'24 EYLL ADETACIDED