Royal Oaks-LR110926Henley
Johnston
& Associates, Inc.
TEXAS FIRM REGISTRATION No. F-1238
2.
DAILY REPORT
Project Coppell Develop�m�ent —Royal Oaks REPORT DATE:
09/26/11
Sandy Lake Road and Heart z REPORT NO.:
002
Coppell, Texas SHEET:
1 of 1
Client Bright Realty, Inc. PROJECT NO.:
11410
4228 North Central, Suite 300 TECHNICIAN:
L. Sherren
Dallas, Texas 75206
Reinforcement Steel
Attention: Marc Zett
BRIEF DESCRIPTION AND LOCATION OF SERVICES:
Tie-Back Inspection
Picked-up one (1) proctor for transport to the lab.
WEATHER: Clear, sunny
TIME: Start Work: 11:00 AM Stop Work 1:00 PM
DELAYS
WORKED PERFORMED
The following items were observed or checked during this inspection:
( ) I. Pier Inspection/Foundation ( ) 10. Field Density Testing
2.
Concrete Inspection
1
Sub-surface Drain Installation
4.
Select Fill Placement
5.
Lime Stabilization
6,
Footing Inspection
T
General Inspection
8.
Reinforcement Steel
Inspection
9.
Tie-Back Inspection
( ) 11. Concrete Cylinder/Pick-Up
12. Grout Cubes/ Mortar/Pick-Up
13- Field Gradation/Lime
Field Reports
Field Sampling
%11111101�116
• '�
If you have any questions or desire further information, please do not hesitate to call,
HENLEY-JOHNSTON &ASSOCIATES, Inc.
235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645