Royal Oaks-LR110929J
f .
n
S
I ates,.Inc.
TEXAS FIRM REGISTRATION No. F-1238
&qAK6_T_.y1
Project Coppell Development — Royal Oaks
REPORT DATE:
0912911
Sandy Lake Road and Heartz
REPORT NO.:
004
Coppell, Texas
SHEET:
1 of 1
Client: Bright Realty, Inc.
PROJECT NO.
11410
4228 North Central, Suite 300
TECHNICIAN
L. Sherren
Dallas, Texas 75206
9.
Tie-Back Inspection
Attention: Marc Zett
BRIEF DESCRIPTION AND LOCATION OF SERVICES:
Arrived to jobsite to perform compaction test, contractor
canceled due to gas line. Densities re-
scheduled for 9130111.
WEATHER Clear, sunny
TIME Start Work: 1:30 PM Stop Work:
4:00 PM
DELAYS:
WORKED PERFORMED
The following items were observed or checked during this inspection
( Inspection/Foundation ( ) 10. Field Density Testing
2,
Concrete Inspection
3.
Sub-surface Drain Installation
4,
Select Fill Placement
5.
Lime Stabilization
6.
Footing Inspection
7.
General Inspection
8,
Reinforcement Steel
Inspection
9.
Tie-Back Inspection
11.
Concrete Cylinder/Pick-Up
12.
Grout Cubes/ Mortar/Pick-Up
13.
Field Gradation/Lime
(x) 14.
Field Reports
15.
Field Sampling
16,
Tend onlP roof- Load Inspection
1T
Pier lnspectionlRetention
( ) 18. See Attached Sheet(s) for Test Results
, 11111irr�! U 0 -
• �,*_ A . �2 1111