Loading...
Royal Oaks-LR111026Henley Johnston Associates, Inc. TEXAS FIRM REGISTRATION No. F-1238 �' �_n 0 11�1_k I Project: Coppell Development — Royal Oaks REPORT DATE: 10/26/11 Sandy Lake Road and Heartz REPORT NO.: 014 Coppell, Texas SHEET: 1 of 3 Client: Bright Realty, Inc. PROJECT NO.: 11410 4228 North Central, Suite 300 TECHNICIAN L. Sherren Dallas, Texas 75206 Attention: Marc Zett BRIEF DESCRIPTION AND LOCATION OF SERVICES; Performed eighteen (18) f ield density tests on 8" waterline at stations 1 +00 to 6+00 at 4, -2 final grade. Sampled two (2) sets of five (4x8) concrete test cylinders. 1 set of test cylinders were samples for 8" sewer line leave out at station 0+40 and parts of leave out sidewalk on the East side of London Way. 2"" set test sample were taken on the East and West sides of London Way for leave out sidewalk, WEATHER Cloudy, cool TIME: Start Work: &00 AM Stop Work: 4:30 PM DELAYS: WORKED PERFORMED The following items were observed or checked during this inspection ( ) 1. Pier Inspection/Foundation (x) 10. Field Density Testing (x) 2. Concrete Inspection 3, Sub-surface Drain Installation 4. Select Fill Placement 5, Lime Stabilization 6. Footing Inspection 7, General Inspection 8. Reinforcement Steel Inspection 9, Tie-Back Inspection 11. Concrete Cylinder/Pick-Up 12. Grout Cubes/ Mortar/Pick-Up 13- Field Gradation/Lime (x) 14. Field Reports 15- Field Sampling 16. Tendon /Proof -Load Inspection 17. Pier I nspectionl Retention (x) 18. See Attached Sheet(s) for Test Results If you have any questions or desire further information, please do not hesitate to call. 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 Henley Johnston & Associates, Inc. - nmineering geosciences con sultants since 1951 TEXAS FIRM REGISTRATION No. F1238 FIELD COMPACTION REPORT Project Coppell Development — Royal Oaks REPORT DATE: 10/26111 Sandy Lake Road and Heartz REPORT NO. 014da Coppell, Texas SHEET: 3 of 4 Client Bright Realty, Inc. PROJECT NO.: 11410 4228 North Central, Suite 300 TECHNICIAN: L, Sherren Dallas, Texas 75206 Attention: Marc Zett VVEATHE Uoudy, cool If you should have any questions or desire further information, please do not hesitate to call. Signed, HENLEY-JOHNSTON & ASSOCIATES, Inc. John W. Johnston, P.E. President !I11111 Ir;lni Opt Std MC Den Den f) (Pcf) W.A10FREFURSTRU J PO 7T. 2 Z ■ 4 1 0 — 7.2 107. ion 2+00, -4 BFG saion + ation 3+00, FG VVEATHE Uoudy, cool If you should have any questions or desire further information, please do not hesitate to call. Signed, HENLEY-JOHNSTON & ASSOCIATES, Inc. John W. Johnston, P.E. President !I11111 Ir;lni a Henley Johnston & Associates, Inc. engineerinq -geosciences consultants since 1951 TEXAS FIRM REGISTRATION No. F1238 jt4A9_JF9r9JTJJt0JA1U , @Tfff_1kJff 0*0J67 Q-M Project: Coppell Development - Royal Oaks REPORT DATE: 10126111 Sandy Lake Road and Heartz REPORT NO.: 014db Coppelf, Texas SHEET 4 of 4 Client: Bright Realty, Inc. PROJECT NO. 11410 4228 North Central, Suite 300 TECHNICIAN L. Sherren Dallas, Texas 75206 Location/Lift Attention: Marc Zett Dry WEATHER: Cloudy, coot If you should have any questions or desire further information, please do not hesitate to call. 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 Field Test Data: Complies with i. Density — Moisture Project ASTM ■ 6938 Specifications Location/Lift Dry Field % Dry 8" Waterline Den MC Den At station 4+00, -4' BFG 1002 17,9 96.3 YES At station 4+00, -2' BFG .8 At station ■+00, FG - - 1 5AI '__ 99.6 YES At station 5+00, -4 BFG At station 5+00, -2 BFG t ons , ]LIM At station 5+00, FG At station 6+00, -4 BFG At station 6+00, -2 BFG tation 6+00, FG WEATHER: Cloudy, coot If you should have any questions or desire further information, please do not hesitate to call. 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645