Loading...
Royal Oaks-LR111025ro Henley Johnshon tes, Inc. TEXAS FIRM REGISTRATION No. F-1238 Project: Coppell Development — Royal Oaks REPORT DATE 10/25/11 Sandy Lake Road and Heartz REPORT NO. 013 Coppell, Texas SHEET 1 of 3 Client: Bright Realty, Inc. PROJECT NO.: 11410 4228 North Central, Suite 300 TECHNICIAN: L. Sherren Dallas, Texas 75206 Attention: Marc Zett BRIEF DESCRIPTION AND LOCATION OF SERVICES: Performed thirteen (13) field density tests: three (3) on 8" waterline at stations 0+40 and ten (10) on foundation from lot number 17 to 21 at -4', -3', -2' -1', final grade, WEATHER: Clear, sunny TIME Start Work: 8:00 AM Stop Work 2:00 PM DELAYS: WORKED PERFORMED The following items were observed or checked during this inspectioni ( ) 1. Pier Inspection/Foundation (x) 10. Field Density Testing 2. Concrete Inspection 3. Sub-surface Drain Installation 4, Select Fill Placement 5- Lime Stabilization 6. Footing Inspection 7. General Inspection 8. Reinforcement Steel Inspection 9, Tie-Back Inspection 11. Concrete Cylinder/Pick-Up 12. Grout Cubes/ Mortar/Pick-Up 13. Field Gradation/Lime (x) 14. Field Reports 15. Field Sampling 16. Tendon/Proof-Load Inspection 17. Pier Inspection/Retention (x) 18. See Attached Sheets) for Test Results If you have any questions or desire further information, please do not hesitate to call. John W. Johnston, P.E. President Henley C If Johnston & Associates, Inc. -- gineering geosciences consultants since 1951 TEXAS FIRM REGISTRATION No. F1238 Project: Coppell Development – Royal Oaks Sandy Lake Road and Heartz Coppell, Texas Client: Bright Realty, Inc. 4228 North Central, Suite 300 Dallas, Texas 75206 Attention: Marc Zett ■ - T - 'Lei REPORT DATE 10/25/11 REPORT NO. 01 3da SHEET: 2 of 3 PROJECT NO.: 11410 TECHNICIAN. L. Sherren WEATHER: Clear, sunny If you should have any questions or desire further information, please do not hesitate to call. r I Ili iiiiiiii iii 11 iIi iIii FIRM' I I I I! . 0 6 Laboratory Data ASTM D13•8 Field Test Data: Density – Moisture ASTM D 6938 Complies with Project Specifications Field No. Location/Lift 8" Waterline on Sandy Lake Opt MC Std Den Dr Den At station 0+40, -4' BFG 15,0 11 YES ii • ti +40, -2' BFG At station 0+40, FG Foundation/Lot sec, -Z BFG �enter sec, -1' BFG 15.3 'Ill At Lot 18, center sec, -2' BFG 15.0 104.0 f 3.8 At Lot 18, center sec, -1 9'F — G — 15.0 All it A i t 1 , c nter sec, -2' i # At Lot 19, center sec, -1' BFG WEATHER: Clear, sunny If you should have any questions or desire further information, please do not hesitate to call. r I Ili iiiiiiii iii 11 iIi iIii FIRM' I I I I! . 0 6 Henley C Johnston ffJ & Associates, Inc. cm - ngineering geasciences consultants since 1951 TEXAS FIRM REGISTRATION No. F1238 Project: Coppell Development – Royal Oaks REPORT DATE 10/25/11 Sandy Lake Road and Heart z REPORT NO. 01 3db Coppell, Texas SHEET: 3 of 3 Client Bright Realty, Inc, PROJECT NO.: 11410 4228 North Central, Suite 300 TECHNICIAN: L. Sherren Dallas, Texas 75206 010 At Lot 20, center sec, -2' BFG 011 At Lot 20, center sec, -1 BFG 012 At Lot 21, center sec, -2' BFG ivnes wsu.m At Lot 2 center sec, -1 ' B FG 61 N SpRfL 15.3 107.2F 15.3 197 2 15,0 104.0 15,0 � Attention: Marc Zett YE S YES — YES1 YES WEATHER: Clear, sunny If you should have any questions or desire further information, please do not hesitate to call. PAJAr, Laboratory Field Test Data Complies with Data Density – Moisture Project ASTM ASTM D 6938 Specifications Fie Location/Lift No. Foundation/Lot D698 Opt Std MC Den Dry Field % Dry Den IVIC Den 010 At Lot 20, center sec, -2' BFG 011 At Lot 20, center sec, -1 BFG 012 At Lot 21, center sec, -2' BFG ivnes wsu.m At Lot 2 center sec, -1 ' B FG 61 N SpRfL 15.3 107.2F 15.3 197 2 15,0 104.0 15,0 � (pcf) % 16.9 9 5.9 104.7 18,5 97 7 101.0 18.7 97.1 — fo - 3.1 15.9 99A YE S YES — YES1 YES . ... ....... .... .. . ... —'—' WEATHER: Clear, sunny If you should have any questions or desire further information, please do not hesitate to call. PAJAr,