Loading...
Royal Oaks-LR111018Henley Johnston & Associates, Inc. TEMSFIRM REGISTRATION No. F-1238 Project: Coppell Development — Royal Oaks REPORT DATE 10/18/11 Sandy Lake Road and Heartz REPORT NO. 008 Coppell, Texas SHEET: 1 of 1 Client: Bright Realty, Inc. PROJECT NO.: 11410 4228 North Central, Suite 300 TECHNICIAN L. Sherren Dallas, Texas 75206 Grout Cubes/ Mortar/Pick-Up Attention: Marc Zett ( ) 13, BRIEF DESCRIPTION AND LOCATION OF SERVICES: 5. Lime Stabilization Arrived to job site for compaction testing but soil had too much moisture with water standing on top. Contractor re- scheduled for 10119/1' 1 at 10 :00 AM 6. Footing Inspection WEATHER: Sunny, windy Field Sampling TIME: Start Work 8:00 AM Stop Work 10 AM ( ) 16. DELAYS 8, Reinforcement Steel WORKED PERFORMED The following items were observed or checked during this inspection: 1. Pier Inspection/Foundation ( ) 10. Field Density Testing 2. Concrete Inspection ( ) 11. Concrete Cylinder/Pick-Up 3. Sub-surface Drain Installation ( ) 12 Grout Cubes/ Mortar/Pick-Up 4- Select Fill Placement ( ) 13, Field Gradation /Lime 5. Lime Stabilization (x) 14. Field Reports 6. Footing Inspection ( ) 15. Field Sampling 7. General Inspection ( ) 16. Tendon/Proof-Load Inspection 8, Reinforcement Steel ( ) 17, Pier Inspection/Retention Inspection 9. Tie-Back Inspection ( ) 18- See Attached Sheet(s) for Test Results If you have any questions or desire further information, please do not hesitate to call. HENLEY-JOHNSTON & ASSOCIATES, Inc. John Johnsto P.E. President