Royal Oaks-LR111018Henley
Johnston
& Associates, Inc.
TEMSFIRM REGISTRATION No. F-1238
Project: Coppell Development — Royal Oaks REPORT DATE
10/18/11
Sandy Lake Road and Heartz REPORT NO.
008
Coppell, Texas SHEET:
1 of 1
Client: Bright Realty, Inc. PROJECT NO.:
11410
4228 North Central, Suite 300 TECHNICIAN
L. Sherren
Dallas, Texas 75206
Grout Cubes/ Mortar/Pick-Up
Attention: Marc Zett
( ) 13,
BRIEF DESCRIPTION AND LOCATION OF SERVICES:
5. Lime Stabilization
Arrived to job site for compaction testing but soil had too much moisture with water standing on
top. Contractor re- scheduled for 10119/1' 1 at 10 :00 AM
6. Footing Inspection
WEATHER: Sunny, windy
Field Sampling
TIME: Start Work 8:00 AM Stop Work 10 AM
( ) 16.
DELAYS
8, Reinforcement Steel
WORKED PERFORMED
The following items were observed or checked during
this inspection:
1. Pier Inspection/Foundation
( ) 10.
Field Density Testing
2. Concrete Inspection
( ) 11.
Concrete Cylinder/Pick-Up
3. Sub-surface Drain Installation
( ) 12
Grout Cubes/ Mortar/Pick-Up
4- Select Fill Placement
( ) 13,
Field Gradation /Lime
5. Lime Stabilization
(x) 14.
Field Reports
6. Footing Inspection
( ) 15.
Field Sampling
7. General Inspection
( ) 16.
Tendon/Proof-Load Inspection
8, Reinforcement Steel
( ) 17,
Pier Inspection/Retention
Inspection
9. Tie-Back Inspection
( ) 18-
See Attached Sheet(s) for Test Results
If you have any questions or desire further information, please do not hesitate to call.
HENLEY-JOHNSTON & ASSOCIATES, Inc.
John Johnsto P.E.
President