DAILY REPORT
Project: Coppell Development — Royal Oaks f REPORT DATE:
10/20/11
Sandy Lake Road and Heartz REPORT NO.
010
Coppell, Texas SHEET
I of 3
Client: Bright Realty, Inc. PROJECT NO,:
11410
4228 North Central, Suite 300 TECHNICIAN:
L. Sherren
Dallas, Texas 75206
General Inspection
Attention: Marc Zett
Tendon/Proof-Load Inspection
BRIEF DESCRIPTION AND LOCATION OF SERVICES:
Reinforcement Steel
Performed eighteen (18) field density tests on 4" sewer services performed at stations 1+75,
2+20, 3+00 line (A).
Inspection
WEATHER: Clear sunny
TIME: Start Work: 8:00 AM Stop Work: 12:00 PM
9.
DELAYS:
(x) 18.
WORKED PERFORMED
The following items were observed or checked during this inspection:
( ) 1. Pier Inspection/Foundation (x) 10. Field Density Testing
2. Concrete Inspection
3. Sub-surface Drain Installation
( ) 11. Concrete Cylinder/Pick-Up
( ) 12. Grout Cubes/ Mortar/Pick-Up
4.
Select Fill Placement
( ) 13.
Field Gradation/Lime
5.
Lime Stabilization
(x) 14.
Field Reports
6-
Footing Inspection
15.
Field Sampling
7.
General Inspection
16.
Tendon/Proof-Load Inspection
8.
Reinforcement Steel
17
Pier InspectionlRetention
Inspection
9.
Tie-Back Inspection
(x) 18.
See Attached Sheet(s) for Test Results
If you have any questions or desire further information, please do not hesitate to cau
235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645
Nol NUMATONS "I"k
WEATHER: Clear, sunny
If you should have any questions or desire further information, please do not hesitate to call,
235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645
Dry
en
At station 1+75, -8 BFG
1+75, -6 BF
At station 1+75, -4 BFG
ii
' t — station 1+75, -2 BFG
At station 1+75, FG
ii
At station 2+20, -10 BFG
t station 2+20, -8 BFG
FAt station 2+20, -6 BFG
010
1 At station 2+20, -4 BFG
WEATHER: Clear, sunny
If you should have any questions or desire further information, please do not hesitate to call,
235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645
WEATHER: Clear, sunny
If you should have any questions or desire furthers ormmb% please do not hesitate to call.
235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645
Laboratory
Field Test Data:
Complies with
Data
Density Moisture
Project
ST M
ASTIVI ■ 6938
eci"ca],ions
Specifications
■698
Field
Location/Lift
Opt
Std
Dry
Fie ld
Dr
% y
No
• Sewer Services (A)
MC
Den
Den
IVIC
Den
c
— Spsf
Oil
At station 2+20, -2 ; G
» ■
1040
103.6
1 99.6
YES
r% It -1
U 114- 1
At station 2+20, FG
— 1 5b
104O
102.1
17A ]
YES
'® t station 3+00, -10 BFG
At station 3+00 -8 BFG
At station 3+00, -6 BFG
At station 3+00, -4' BFG
At station 3+■■ , -2 BFG
ation 3+■0, FG
WEATHER: Clear, sunny
If you should have any questions or desire furthers ormmb% please do not hesitate to call.