Loading...
Royal Oaks-LR111020Henley C _ff Johnston 'I & Associates, Inc. engineering -geosciences consultants since 1951 I I I a 0 M1 R 912119 1 W= RUZ Offill 101 nk I ro IN a PAR 111111111 2. Concrete Inspection 3. Sub-surface Drain Installation ( ) 11. Concrete Cylinder/Pick-Up ( ) 12. Grout Cubes/ Mortar/Pick-Up 4. DAILY REPORT Project: Coppell Development — Royal Oaks f REPORT DATE: 10/20/11 Sandy Lake Road and Heartz REPORT NO. 010 Coppell, Texas SHEET I of 3 Client: Bright Realty, Inc. PROJECT NO,: 11410 4228 North Central, Suite 300 TECHNICIAN: L. Sherren Dallas, Texas 75206 General Inspection Attention: Marc Zett Tendon/Proof-Load Inspection BRIEF DESCRIPTION AND LOCATION OF SERVICES: Reinforcement Steel Performed eighteen (18) field density tests on 4" sewer services performed at stations 1+75, 2+20, 3+00 line (A). Inspection WEATHER: Clear sunny TIME: Start Work: 8:00 AM Stop Work: 12:00 PM 9. DELAYS: (x) 18. WORKED PERFORMED The following items were observed or checked during this inspection: ( ) 1. Pier Inspection/Foundation (x) 10. Field Density Testing 2. Concrete Inspection 3. Sub-surface Drain Installation ( ) 11. Concrete Cylinder/Pick-Up ( ) 12. Grout Cubes/ Mortar/Pick-Up 4. Select Fill Placement ( ) 13. Field Gradation/Lime 5. Lime Stabilization (x) 14. Field Reports 6- Footing Inspection 15. Field Sampling 7. General Inspection 16. Tendon/Proof-Load Inspection 8. Reinforcement Steel 17 Pier InspectionlRetention Inspection 9. Tie-Back Inspection (x) 18. See Attached Sheet(s) for Test Results If you have any questions or desire further information, please do not hesitate to cau 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 Nol NUMATONS "I"k WEATHER: Clear, sunny If you should have any questions or desire further information, please do not hesitate to call, 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 Dry en At station 1+75, -8 BFG 1+75, -6 BF At station 1+75, -4 BFG ii ' t — station 1+75, -2 BFG At station 1+75, FG ii At station 2+20, -10 BFG t station 2+20, -8 BFG FAt station 2+20, -6 BFG 010 1 At station 2+20, -4 BFG WEATHER: Clear, sunny If you should have any questions or desire further information, please do not hesitate to call, 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 WEATHER: Clear, sunny If you should have any questions or desire furthers ormmb% please do not hesitate to call. 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 Laboratory Field Test Data: Complies with Data Density Moisture Project ST M ASTIVI ■ 6938 eci"ca],ions Specifications ■698 Field Location/Lift Opt Std Dry Fie ld Dr % y No • Sewer Services (A) MC Den Den IVIC Den c — Spsf Oil At station 2+20, -2 ; G » ■ 1040 103.6 1 99.6 YES r% It -1 U 114- 1 At station 2+20, FG — 1 5b 104O 102.1 17A ] YES '® t station 3+00, -10 BFG At station 3+00 -8 BFG At station 3+00, -6 BFG At station 3+00, -4' BFG At station 3+■■ , -2 BFG ation 3+■0, FG WEATHER: Clear, sunny If you should have any questions or desire furthers ormmb% please do not hesitate to call. 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645