Loading...
Royal Oaks-LR111003Henley Johnston & Associates, Inc. - eering -geosciences consultants since 1951 TEXAS FIRM REGISTRATION No, F1238 - FIELD COMPACTION REPORT Project: Coppell Development - Royal Oaks — REP — ORT DATE: 10/03111 Sandy Lake Road and Heartz REPORT NO.: 006d Coppell, Texas SHEET: 2 of 2 Client: Bright Realty, Inc, PROJECT NO. 11410 4228 North Central, Suite 300 TECHNICIAN: L. Sherren Dallas, Texas 75206 Attention: Marc Zett - Laboratory Data AT M D698 Field Test Data: Density - Moisture ASTM D 6938 Complies with Project Specifications Field Field Location/Lift 0 j N 7o, 8" Sewer Line (A) 001 At Station 4+50,-4' BFG 002 At Station 4+50,-3' BFG 2 003 At Station 4+5 -- -2' BFG 21. 004 At Station 4+50, -1 BFG 005 At Station 5+50, -4' BFG 006 At Station 5+50, -3' BFG f 007 At Station 5+50, -2' BFG 008 At Station 5+50, -1' BFG _ j Opt t Opt Std MC Den (P 153 107.2 1 15.3 10 .'2 15.3 107.2 15.3 �07T 15.3 107,2 15.3 - 107.2 153 107.2 f 153 1071 [ yt _ Dry Fie % Dry Den MC Den 1105.4 16,8 98,S7 104.1 17.9 97.1 1017 18.3 96,7 102.9 19.1 96.0 103.1 18.9 96.2 106.5 15.7 1 99.3 102 19.3 95.8 104.9 17 9 ....... ... YES YES YES YES YES YES ES Y� Y VVEA1 HER: Clear, sunny 81' If you should have any questions or desire further information, please do not hesitate to call. 235 Morgan Avenue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 214-943-7645 Henley Johnston & Associates, Inc. engineering geosciences consultants since 1951 TEXAS FIRM REGISTRATION No. F-1238 71 .* M Project Coppell Development — Royal Oaks REPORT DATE: 10104111 Sandy Lake Road and Heartz REPORT NO.: 006 Coppell, Texas SHEET 1 of 2 Client: Bright Realty, Inc. PROJECT NO.: 11410 4228 North Central, Suite 300 TECHNICIAN L. Sherren Dallas, Texas 75206 Attention: Marc Zett BRIEF DESCRIPTION AND LOCATION OF SERVICES: Performed eight (8) field density test for 8" sewer line A at stations 4+50, 5+50 at -4', 4, -2' -1' below final grade. WEATHER: Clear, sunny TIME Start Work 9:00 AM Stop Work: 12:30 PM DELAYS: WORKED PERFORMED The following items were observed or checked during this inspection: Pier I ns pection/Fou nd a n (x) 10, Field Density Testing 2. Concrete inspection 1 Sub-surface Drain Installation 4. Select Fill Placement 5. Lime Stabilization 6. Footing Inspection 7. General Inspection 8, Reinforcement Steel Inspection 9. Tie-Back inspection 11. Concrete Cylinder/Pick-Up 12. Grout Cubes/ Mortar/Pick-Up 13. Field Gradation/Lime (x) 14. Field Reports 15. Field Sampling 16. Tendon/Proof-Load Inspection 17, Pier Inspection/Retention (x) 18. See Attached Sheet(s) for Test Results If you have any questions or desire further information, please do not hesitate to call. HENLEY-JOHNSTON & ASSOCIATES, Inc.