Loading...
Royal Oaks-LR111031Henley Johnston L Associates, Inc. l �Z Project: Coppell Development - Royal Oaks REPORT DATE: 10/31/11 Sandy Lake Road and Heartz REPORT NO.: 017 Coppell, Texas SHEET 1 of 1 Client: Bright Realty, Inc. PROJECT NO. 11410 4228 North Central, Suite 300 TECHNICIAN L. Sherren Dallas, Texas 75206 Attention: Marc Zett BRIEF DESCRIPTION AND LOCATION OF SERVICES Picked-up one (1) set of four (4) - 4x8 concrete test cylinders for transport to the lab. WEATHER: Clear, sunny 55' TIME: Start Work: 9:00 AM Stop Work 11:00 AM DELAYS: WORKED PERFORMED The following items were observed or checked during this inspection: ( ) 1. Pier Inspection/Foundation ( ) 10. Field Density Testing 2. Concrete Inspection 3. Sub-surface Drain Installation (x) 11. Concrete Cylinder1HjLk-_Up ( ) 12. Grout Cubes/ Mortar/Pick-Up 4. Select Fill Placement ( ) 13. Field Gradation/Lime 5. Lime Stabilization (x) 14. Field Reports 6. Footing Inspection ( ) 15. Field Sampling 7. General Inspection ( ) 16. Tendon/Proof-Load Inspection 8, Reinforcement Steel ( ) 17. Pier Inspection/Retention Inspection 9. Tie-Back Inspection ( ) 18. See Attached Sheet(s) for Test Results If you have any questions or desire further information, please do not hesitate to call. 235 Morgan A venue Dallas, Texas 75203-1025 Phone 214-941-3808 Facsimile 294 - 943 - &45