ST8402-CS 881205December 5, 1988 DEE;'- 5 1988 Ginn, Inc., Consulting Engineers 17103 Preston Road Suite 100, LB-118 Dallas, Texas 75248 Attn: John C. Karlsruher, P.E. Project: Denton Tap Road Improvements From Sandy Lake To Denton Creek Project 379 RE : City of Dallas 30" Water Line Dear John: While attempting to install lateral D-22 on Monday, November 28, 1988, our subcontractor, American Developers, uncovered the 30" City of Dallas Water Line. It's at offset 167+32 and on the plans shows to be approximately at 44' right of centerline. We have a field shot that shows it to be at 42.7' right of centerline. The horizontal location is not a problem; however, the vertical location of the 30" water line on the plans shows to be at an elevation of 488.5 at 44' right of centerline. The actual field ties show the 30" water line to be at an elevation of 492.21 at 42.7' right of centerline. This interferes directly with the lateral pipe and there would only be three or four tenths clearance below the bottom of paving at this station. with the existing drainage structures and existing intersection at Sandy Lake, there may be no recourse other than that the City of Dallas lower their 30" water line. Per our most recent schedule, we show Phase II excavation to start in the third week of January, 1989 and we show Phase II subgrade preparation to start in the second week of February, 1989. We have some time to solve the problem, but that window will close rapidly. It is L. H. Lacy's intention to pave Phase II on the North Project before we pave Phase II on the South Project. As we have stated before, it is our intention to finish the North Project as soon as possible. This will allow us to concentrate our efforts on the completion of the South Project. L. H. Lacy Company General Contractors 214/357-0146 "Oualily Coftstruclion for over 65 Years" 10888 Shady Trail P.O. Box 541297 Dallas, Texas 753§4-1297 TAP tiDAL' I~PROVEMEr4TS PF~OJECT - SAr:i.~¥ L~KE ltl DENION CREEK i?~' + 05 ~0.00 455.80 ~5~.00 lB/ + 57 40.00 ~51,58 ,u~ ~ 54 ~O. O0 45g,~0 ~59,70 182 ~ ~1 40.00 40.OL, 459.85 459.85 l~l ~ 02 40.*~0 462.11 · 3B. ~0 40, O0 466, B2 486. B2 4~4,5L~ ~'.'. ~ 77 ~o. O0 470,44 467.~0 17q + ~0 40,00 416,1~ 474,50 i~"*~.e" 42.70 44.00 492.21 492.21 4BU.50 16A ~ 58 I.BO LAI 10.42~ LAT D-4 2.,~2 2.~4 L~I O-B LnT D-14 LAT O-16 LAI D-22 P~VINB liE-Iii I - ,,NOW,., ELEVAT!ON AS SHOWN ON PLANS WIIH [HE !iEt+E.N~I'EO INFO~,~'IILIN t.t~lLflAL..q C,-4, L)"I4, & 0-16 CfJULI~ HAVE II~JLflFEI~flENCE. L~I,,_N,~. O-z,. ~EFIN~IELI' II~S AN IN1LtiF£~RENCF P~UBLEM. i;JE I~MIN~L CLEARANCE IN THE ~:-22 :nlE~tt~L ArEA IS i)EI-'!;~/ELY ~ PI;~O~LEM. , lB ' , I I J