Loading...
WA9901-BD030513BID TABULATION: MEADOWCREEK/ROLLING HILLS WATER LINE PROJECT WA 99 Saber Dev. Unit Price 5,000.00 37.00 -01 Corp. Circle H Inc. Patco Utilities, Inc. Atkins Bros. Item Quantity Unit Description Site Concrete Municipal Utilities, Inc. Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 5,000.0 5,000.00 5,000.0 1,200.00 1,200.0 2,000.00 2,000.0 1 -1 1 LS Mobilization & Demobilization 16,500.00 16,500.0 5,000.00 5,000.0 197,950.0 .,.0 2950 157825 27.35 146,322.5 42.00 224,700.0 1 -2 5350 LF Furnish & Install 8" Water Pipe 28.70 153,545.0 30.00 160,500.0 40.00 800.00 64,320.0 40.00 64,320.0 70.00 112,560.0 72.00 115,776.0 1 -3 1608 LF Boring Required to Install 8" Water Pipe 30.00 48,240.0 50.00 80,400.0 9,600.0 .,.. 67500 81000 71800 8,616.0 623.00 7,476.0 1-4 12 EA Furnish & Install Inline 8" Gate Valve 700.00 8,400.0 700.00 8,400.0 2,275.00 85.00 27,300.0 1,750.00 21,000.0 2,460.00 29,520.0 1,770.80 21,249.6 1 -5 12 EA Furnish & Install Fire Hydrant Assembly 2,350.00 28,200.0 2,000.00 24,000.0 680.0 500.00 4,000.0 540.00 4,320.0 75.00 600.0 1 -6 8 EA Remove &Salvage existing Fire Hydrant 100.00 800.0 600.00 4,800.0 525.00 13,650.0 500.00 13,000.0 560.00 14,560.0 532.00 13,832.0 1 -7 26 EA Reconnect exist Short Serv. w /1" Copper 475.00 12 ,350.0 400.00 10,400.0 700.00 10,500.0 1,000.00 15,000.0 760.00 11,400.0 682.70 10,240.5 1 -8 15 EA Reconnect exist Long Serv. w/1 "Copper 600.00 9,000.0 600.00 9,000.0 975.00 11,700.0 1,750.00 21,000.0 1,300.00 15,600.0 1,140.30 13,683.6 1 -9 12 EA Reconnect exist Long Sery w/2 "Copper 975.00 11,700.0 1,200.00 14,400.0 4,000.0 1,450.00 1,450.0 2,500.00 2,500.0 1,500.00 1,500.0 1,576.30 1,576.3 1 -10 1 EA Connect exist 6" WL to Exist 8" CIP WL 3,000.00 3,000.0 4,000.00 1,150.00 1,350.00 1,300.00 2,300.0 2,000.00 4,000.0 1,500.00 3,000.0 1,013.50 2,027.0 1 -11 2 EA 6" Connection to exist 6" CIP WL 2,650.00 5,300.0 2,000.00 4,000.0 5,400.0 2,250.00 9,000.0 1,200.00 4,800.0 1,221.50 4,886.0 1 -12 4 EA 8" Connection to exist 6" CIP WL 2,900.00 11,600.0 2,400.00 9,60 2,600.0 2,500.00 5,000.0 1,150.00 2,300.0 1,165.20 2,330.4 1 -13 2 EA Connect to exist 8 " CIP WL 2,825.00 5,650.0 2,600.00 5,200.0 35.00 250.00 3,200.00 455.0 .,.0 10000 1300 21.00 273.0 27.00 351.0 1 -14 13 LF Remove & Replace exist Concrete SW 30.00 390.0 30.00 390.0 500.0 1,000.00 2,000.0 2,100.00 4,200.0 114.00 228.0 1 -15 2 EA Cut &Plug exist 6" Cast Iron Pipe 1,700.00 3,400.0 400.00 800.0 3,200.0 2,500.00 2,500.0 750.00 750.0 1,000.0 1 -16 1 LS Abandon exist 6" CIP WL 2,650.00 2,650.0 500.00 500.0 15,000.00 15,000.0 20,000.00 20,000.0 23,760.00 23,760.0 H2,000.00 2,000.0 1 -17 1 LS Fumish, Install, Maintain & Remove Erosion Control Devices 10,000.00 10,000.0 2,000.00 2,000.0 2,850.00 2,850.0 7,500.00 7,500.0 4,500.00 4,500.0 500.00 500.0 1 -18 1 LS Furnish, Install & Maintain Traffic Control Devices 2,475./00 2,475.0 2,000.00 2,000.0 700.00 700.0 1,000.00 1,000.0 6,000.00 6,000.0 500.00 500.0 1 -19 1 LS Furnish & Install Trench Safety System 800.00 800.0 5,000.00 5,000.0 5,000.00 5,000.0 10,000.00 10,000.0 11,700.00 11,700.0 1,000.00 1,000.0 1 -20 1 LS Repair or Replace Damaged Sprinkler Heads & Irrigation System Lines 4,950.00 4,950.0 2,000.00 2,000.0 3,000.00 3,000.0 200000 ,. 2,000.0 7,200.00 7,200.0 16,000.00 16,000.0 1 -21 1 LS Repair / Replace all Damaged Mailboxes 2,750.00 2,750.0 1,000.00 1,000.0 15,500.00 15,500.0 35,000.00 35,000.0 25,200.00 25,200.0 420000 ,. 4,200.0 1 -22 1 LS Fum & Install Bermuda or St. Augustine 10,000.00 10,000.0 10,000.00 10,000.0 180 180 150 150 Calendar Days 120 150 $ 398,655.00 $ 411,045.00 $ 439, 281.50 $ 446,156.40 $ 351,700.00 $ 363, 390.00 h�l y td r H O z 11 l J O '�I 1 x r r H �H l V O � 1 0 N A N N in rn oo N N Q\ 00 U W U = 00 O 2 rr„ coo r„ r, cn m a r- -� m a m m m m m m m m m a a a a a >>m a a °3 :� v xr cu CD ITI C nm mm o 00 a o c o c O 'S VS O b N O S 'S ffQ S r . ❑ .(•. CD CD n cn fD CD O O. c w i v, O� w Oj . ti < �, fD ° F- R° C7 CD p n o tea 0 0o d fo d d w CD w n CD N (_� _ va = ao 9 y fD = C B y y � '•r b O O, O c cn C6 CD .0 CD p C y � i••� 00 y `GT n "O N ' fD , B N 5 fD O b N oo U w CD G ` b Q• CD 'C f�D v�ki CbyD CD y � (y9 N O O O b O N N N N w N N N o b 'A J O O O O O O O O C> O O O O O O O O 00 cWi� p O U O J O A O W O N O U O oo O N A O O m, n F+ F+ 00 O O O O O O O O O C O O O O O O O O O O O O O O O O O O O O U U p fD C O O O O O O O O O O O O O Cl O O O O O O O O C� A � O N O O O r-. 00 N O N vi A O A N 00 O, -,J O O ^•7 O n <D O CD O O O O O Cl O p W J A W U O �O O O p b O O O C O O O O A O O O O Cl O O O O O O O O O O O O cJi, O O C O O Cl Cl O O O C C O O O O O C O O A N U W N W 00 00 W N r-• U 'O ,A cJn O O O O O v U O O J v O 3 Cl O O O O O O O O C O O O O C O U U O O O V U O U O O oo N A O O O m eb I-+ O p O O O O O O O O O O O O C O O O O O C Cl O O O O U O C O C O 00 O = O p T 10 W v N in W in C -4 O N •- O Q` •- W oo N A v b N U J O O O O O U O vii O O N O J J A O� O O O Cl O O O O O O O O O O O O O O O O O O Cl O O O Cl Cl O O O fD O O O O O O O O Cl _ Ul U V U 01 U W ON 11 A W N N -, W N b V W N - + O Cl O O O O Cl O 0 O 0 O 0 0o 0 O 0 O 0 O 0 O 0 O tQ 0 --1 v p p 0J0 W C) C:, A• O C O 0 o 0 o 0 p 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 U 0 U o .O v p t 0 o p o p o 0 o p Cl 0 o 0 t1i O O � y _ 0 ~ U v IJ 0 U U N W A cn p Cl 00 N U A `� Q\ D\ W � V O p A .•. N O 'O O O O O O O Cl O A O O O 00 O O 00 th O O O N N W o f� O O O O O O O O O O C O C C O O O O O v p fD O O C O O C O O O N U W Oo N vi N 7 Q\ O O O Cl p p O O N W O W O N O N O O O N O N b W ~ O O O O O O O O O O O O O O O O O O O O p A J U Do O n fD C O o O O o 0 0 o O O O W O O O O O O O O � O� fe O � O O O 00 O O O Cl 00 N O O O tJ O O N 00 v O N b O O O p p O p O O O O O O O O O O O -j W Cl O O f fD O O O O O O C O O O O O O O O C Cl b19 N N to O N N N = w O O U O O �O v c O O O c b O �+ O O O O p O O O O p O O O O O O C O O c O O t O O O c O 00 U O O Cl n 00 O O O O O O O O O Cl O O C O C O O O O O O O C :) O O O 00 O O y O y � N t O O O O p .N. O O O J O O O O O O p O O 01 b O O p p C 0 O O O O O O O Cl 6 O O O O O O O O O N O A O O O O O O O O O O h�l y td r H O z 11 l J O '�I 1 x r r H �H l V O � 1 0 0 , / C v � e � \ a § 3 U) 0 � / \ G \ R § � / 0 ? �o � R � e . _ 0 7 cr # 0 7 \ n § § S 2 a 2» V r .r� (A o 7) 0 2 ko 2 \2 \ 7 7f S 7 / g p \ S � f 2 = E 0 k R � \ j 0o \ / § o Ck . o a 2 V) \( k \ $7 C) _ ® \ 0 k 8 � k $ ■ _ t � �) » q � � n f "Z 5F- I t/I I Z I F�j 1 c N s " P 1 W ,. n c z D m 0 v z D z v c 9 00 m Fvs N X m 0 m m 0 00 v z 0 b P. Co w b D m c m N v D w N 0 0 w m N 0 0 0� z� Z-0 c m =Z m -i m = D v r0 C N c D� �m rn �2� r� z0 m Q BID FORM PROJECT IDENTIFICATION: Meadowcreek / Rolling Hills Water Line Project WA 99 -01 in Coppell, Texas BID OF Si+f Coac1e e, SnC. DATE / '� MALI L 003 (NAME OF FIRM) THIS BID IS SUBMITTED TO: City of Coppell (hereinafter called OWNER) c/o Purchasing Agent 255 Parkway Boulevard P.O. Box 9478 Coppell, Texas 75019 CITY OF COPPELL BID NO: Q- 0403 -01 The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDDER will sign and submit the Agreement with other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER'S Notice of Award. 3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: (a) BIDDER has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged): No: Date: Rec'd: 1 -15 Bidding Documents (b) BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. (c) BIDDER has studied carefully all reports and drawings of subsurface conditions contained in the contract documents and which have been used in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such reports, but not upon nontechnical data, interpretations or opinions contained therein or for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to subsurface conditions at site. BIDDER has studied carefully all drawings of the physical conditions in or relating to existing surface or subsurface structures on the site, which are contained in the contract documents and which have been utilized in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings, but not for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to physical conditions in or relating to such structures. (d) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance or furnishing of the Work as BIDDER considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests reports or similar information or data are or will be required by BIDDER for such purposes. (e) BIDDER has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said Underground Facilities are or will be required by BIDDER in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. (f) BIDDER has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. 1 -16 Bidding Documents (g) BIDDER has given ENGINEER written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. (h) This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any ad+antage over any other Bidder or over OWNER. (i) It is understood and agreed that the following quantities of work to be done at unit prices are approximate only, and are intended principally to serve as a guide in evaluating bids. (j) It is understood and agreed that the quantities of work to be done at unit prices and materials to be furnished may be increased or diminished as may be considered necessary in the opinion of the OWNER to complete the work fully as planned and contemplated, and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth, except as provided for in the Contract Documents. 4. It is understood and agreed that all work under this contract will be completed within the bid calendar days. Completion date will be established in the Notice to Proceed. It is understood that time of completion will be a consideration in the award of the bid, 5. It is strongly recommended that each bidder visit the site prior to submitting a bid. Construction constraints exist along the length of the project that could affect productivity. 6. BIDDER will complete the Work for the following price(s): 1-17 Bidding Documents MEADOWCREEK / ROLLING HILLS WATER LINE INSTALLATION WA 99 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -1 1 LS Mobilization & Demobilization Complete in Place for cr 9 S ?�1c9�.ci1�� ,G�l Dollars and tvo Cents ., b SDd D per Lump Sum. 1 -2 5350 LF Furnish and Install 8" Water Pipe (Inclusive of intermediate taps for testing and disinfection) Complete in Place for "7W" F-t6t4 f Dollars and :5 Lk I AW T%1 Cents �0 per Linear Foot. I -3 1608 LF Boring Required to Install 8" Water Pipe Complete in Place for 1 c 4 Dollars and N Cents g Z p °= per Linear Foot. 00 30 I -4 12 EA Furnish and Install Inline 8" Gate Valve (SDI 5) Complete in Place for 5 &1*4 A*V 41,y Dollars T 40 $ Lf C70 ° and rJ a Cents per Each. 1-18 Bidding Documents 1 -19 Bidding Documents MEADOWCREEK / ROLLING HILLS WATER LINE INSTALLATION WA 99 -01 UNIT PRICE BID SCHEDULE Item No. Quantity Unit Description and Price in Words Unit Total I -5 12 EA Furnish and Install Price Price Fire Hydrant Assembly Complete in Place for 1 "-*U-4 rnw / Il s and ,nu Cents Z 3K 4 - ° 2 $ Z 00 0 . ° per Each. I -6 8 EA Remove and Salvage Existing Fire Hydrants Complete in Place for D,NE AmwpA" Dollars and Aiv Cents /DO we $� o e° per Each. 1 -7 26 EA Reconnect Existing Short Services w /1" Copper Complete in Place for r�t,t� el%4- Dollars and nJo Cents per Each. 1 -8 15 EA Reconnect Existing Long Services w/ 1" Copper Complete in Place for <.-! 164yW4 > Dollars �000 07 and NO Cents per Each. 1 -19 Bidding Documents J -20 Bidding Documents MEADOWCREEK / ROLLING HILLS WATER LINE INSTALLATION WA 99 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words Unit No. Total 1 -9 12 EA Price Price Reconnect Existing Long Services w/ 2" Copper C m lete in Place for �E 1.1HNV�,Ev S Dollars °° //7000-1 and N� Cents p er Each. I -10 1 EA Connect Existing 6" C.I.P. Water Line to Existing S" C.I.P. Water Line (Inclusive of fittings, blocking, tapping sleeve, valve and pipe) .3000 4—' 3000 v Complete in Place for W ]V Dollars and _ &0 Cents er Each. I -1 1 2 EA Six Inch Connection to Existing 6" C.I.P. Water Line (Inclusive of fittings, blocking, pipe, tee & valves) Com r lete in Place f ��D o_v CJt7 tL 7w ',�m1 �, X 1 1' O .1) 3. Dollars and �� Cents er Each. I -12 4 EA Eight Inch Connection to Existing 6" C.I.P. Water Line (Inclusive of fittings, blocking, pipe, tee & valves) Complete in Place for Z�`�0 a=' I /600 ! 4"l 1� ALOA'- K" Dollars and N o Cents per Each. J -20 Bidding Documents 1-21 Bidding Documents MEADOWCREEK / ROLLING HILLS WATER LINE INSTALLATION WA 99 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words No. Unit Total I -13 Price 2 EA Connect to Existing Price 8" C.I.P. Water Line (Inclusive of fittings, blocking, pipe, tee & valves) Com in Place for T ' JK+� Y(rnev,X y n2 - 6 VA Dollars and ^» Cents per Each. I -14 13 LF Remove and Replace Existing Concrete Sidewalk Complete in Place for < < Dollars and Cents 3 2 3 gO of per Linear Foot. I -1 2 EA Cut and Plug Existing 6" Cast Iron Pipe Complete in Place for S . '% .-1 /4 K-U Dollars !'7�JQ an � vp 0. and Cents per Each. I -16 1 LS Abandon Existing 6" C.I.P. Water Line C %ete in Place for o h 51K ,(4*, �- 4 — J'e ry Dollars ZG and N0 Cents per Lump Sum. 1-21 Bidding Documents 1-22 Bidding Documents MEADOWCREEK / ROLLING HILLS WATER LINE INSTALLATION WA 99 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words Unit No. Total Price Price 1 -17 1 LS Furnish, Install, Maintain and Remove Erosion Control Devices w/ S WP3 Plan. Complete in Place for 'fwj wo (Aw" Dollars / 6 ; 000 and rJo Cents p er Lump Sum. I -18 1 LS Furnish, Install, and Maintain Traffic Control Devices Com fete in Pla e f P'� , !-f�c wDR�w s� �y A t/ /— Dollars " (j 0 and /00 � Cents 1 per Lump Sum. I -19 1 LS Furnish and Install Trench Safety System (greater that 5' depth) Complete in Place for f ('c0; . ��tA VA4.) Dollars and ND Cents �per per Lump Sum. 1 -20 1 LS Repair or Replace all Damaged Sprinkler Heads and Irrigation System Lines Complete in Plac for X04 10,ni4r W10K)4eC.v 1 1 0 , Dollars y so �-� �o o� and rvo Cents per Lump Sum. 1-22 Bidding Documents MEADOWCREEK / ROLLING HILLS WATER LINE INSTALLATION WA 99 -01 UNIT PRICE BID SCHEDULE Item Quantity Unit Description and Price in Words No. Unit Total Price Price I -21 1 LS Repair or Replace all Damaged Mailboxes Complete in Place for Al - Al Dollars and No Cents per Lump Sum. 1 -22 1 LS Furnish and Install Bermuda or St. Augustine Grass Solid Sod, including Fertilizer and Watering, Complete in Place for Dollars (goo M /0 000 and Cents per Lump Sum. TOTAL BID ITEMS BID I -1 thru I -22 TANGIBLE PERSONAL PROPERTY COST 1 -23 s 3 !!�'/, 700 oo Bidding Documents BID SUMMARY TOTAL PRICE TOTAL BID ITEMS BID I - thru I - 22 $ S •� CALENDAR DAYS 1 20 In Words: i (�QE� /�+,��� �ifr� 6� �t,,,�� 5� ✓,�.� h`y.�i�,�ct'� .(3 r2r�.p nfo �►,,�� �G95� 6. BIDDER agrees that all Work awarded will be completed within Contract time will commence to run as provided in the Contract Documents Calendar Days. 7. Communications concerning this Bid shall be addressed to the address of BIDDER indicated on the applicable signature page. 8. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in the Contract Price (see Instructions to Bidders). 9• The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. SUBMITTED ON /S 206 Signature: 1 -14 Bidding Documents BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be ninety (90) calendar days from the date of the bid opening. STATE OF P S COUNTY OF I-SoLl)ct S BEFORE ME, the undersigned authority, a Not Public in and for the State of - on this day personally appeared � o S . Lonq who after being by me Name duly sworn, did depose and say: I, �eja^ S • am a duly authorized office /agent for Name _S. +e Cn,1c�r �'n and have been duly authorized to execute the Name of Firm foregoing on behalf of the said S +tG C'h u re te- Z,nC Name of Firm I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line of business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/ commodities bid on, or to influence any individual(s) to bid or not to bid thereon." Name and Address of Bidder: 33110 ' W - Z y t�C� �ud� xCo 4 L raft P �TJ� Sn Telephone: X97-2 ) 313 -0 by: 7Z e S. $ma f : Title: 'tJ��,s,a(,p,�.. Signature• i s �/ / 1 SUBSCRIBED AND aORN to before me by the above named �,e - S . R on this the day of Notary Public in and for the State of F b S f!` JODIE C. COUCH 1 -25 Bidding Documents MY COMMISSION EXPIRES October 12, 2006 If BIDDER IS: An Individual By doing business as Business address (Individual's Name) Phone No. A Partnership B y Business address (Firm Name) (General Partner) Phone No. A Corporation By— S i +e c (State of Incorporation) (Name of person authorized to sign) - y «S i d4g (Corporate Seal) Attest Business address Phone No. A Joint Venture B y By m (Nae) (Address) (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) (Corporation Name) (Seal) 26 Bidding Documents