WA9901-BD030513BID TABULATION:
MEADOWCREEK/ROLLING
HILLS
WATER
LINE PROJECT
WA 99
Saber Dev.
Unit Price
5,000.00
37.00
-01
Corp.
Circle
H Inc.
Patco Utilities,
Inc.
Atkins Bros.
Item
Quantity
Unit
Description
Site Concrete
Municipal
Utilities, Inc.
Total Price
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
5,000.0
5,000.00
5,000.0
1,200.00
1,200.0
2,000.00
2,000.0
1 -1
1
LS
Mobilization & Demobilization
16,500.00
16,500.0
5,000.00
5,000.0
197,950.0
.,.0
2950
157825
27.35
146,322.5
42.00
224,700.0
1 -2
5350
LF
Furnish & Install 8" Water Pipe
28.70
153,545.0
30.00
160,500.0
40.00
800.00
64,320.0
40.00
64,320.0
70.00
112,560.0
72.00
115,776.0
1 -3
1608
LF
Boring Required to Install 8" Water Pipe
30.00
48,240.0
50.00
80,400.0
9,600.0
.,..
67500
81000
71800
8,616.0
623.00
7,476.0
1-4
12
EA
Furnish & Install Inline 8" Gate Valve
700.00
8,400.0
700.00
8,400.0
2,275.00
85.00
27,300.0
1,750.00
21,000.0
2,460.00
29,520.0
1,770.80
21,249.6
1 -5
12
EA
Furnish & Install Fire Hydrant Assembly
2,350.00
28,200.0
2,000.00
24,000.0
680.0
500.00
4,000.0
540.00
4,320.0
75.00
600.0
1 -6
8
EA
Remove &Salvage existing Fire Hydrant
100.00
800.0
600.00
4,800.0
525.00
13,650.0
500.00
13,000.0
560.00
14,560.0
532.00
13,832.0
1 -7
26
EA
Reconnect exist Short Serv. w /1" Copper
475.00
12 ,350.0
400.00
10,400.0
700.00
10,500.0
1,000.00
15,000.0
760.00
11,400.0
682.70
10,240.5
1 -8
15
EA
Reconnect exist Long Serv. w/1 "Copper
600.00
9,000.0
600.00
9,000.0
975.00
11,700.0
1,750.00
21,000.0
1,300.00
15,600.0
1,140.30
13,683.6
1 -9
12
EA
Reconnect exist Long Sery w/2 "Copper
975.00
11,700.0
1,200.00
14,400.0
4,000.0
1,450.00
1,450.0
2,500.00
2,500.0
1,500.00
1,500.0
1,576.30
1,576.3
1 -10
1
EA
Connect exist 6" WL to Exist 8" CIP WL
3,000.00
3,000.0
4,000.00
1,150.00
1,350.00
1,300.00
2,300.0
2,000.00
4,000.0
1,500.00
3,000.0
1,013.50
2,027.0
1 -11
2
EA
6" Connection to exist 6" CIP WL
2,650.00
5,300.0
2,000.00
4,000.0
5,400.0
2,250.00
9,000.0
1,200.00
4,800.0
1,221.50
4,886.0
1 -12
4
EA
8" Connection to exist 6" CIP WL
2,900.00
11,600.0
2,400.00
9,60
2,600.0
2,500.00
5,000.0
1,150.00
2,300.0
1,165.20
2,330.4
1 -13
2
EA
Connect to exist 8 " CIP WL
2,825.00
5,650.0
2,600.00
5,200.0
35.00
250.00
3,200.00
455.0
.,.0
10000
1300
21.00
273.0
27.00
351.0
1 -14
13
LF
Remove & Replace exist Concrete SW
30.00
390.0
30.00
390.0
500.0
1,000.00
2,000.0
2,100.00
4,200.0
114.00
228.0
1 -15
2
EA
Cut &Plug exist 6" Cast Iron Pipe
1,700.00
3,400.0
400.00
800.0
3,200.0
2,500.00
2,500.0
750.00
750.0
1,000.0
1 -16
1
LS
Abandon exist 6" CIP WL
2,650.00
2,650.0
500.00
500.0
15,000.00
15,000.0
20,000.00
20,000.0
23,760.00
23,760.0
H2,000.00
2,000.0
1 -17
1
LS
Fumish, Install, Maintain & Remove
Erosion Control Devices
10,000.00
10,000.0
2,000.00
2,000.0
2,850.00
2,850.0
7,500.00
7,500.0
4,500.00
4,500.0
500.00
500.0
1 -18
1
LS
Furnish, Install & Maintain Traffic
Control Devices
2,475./00
2,475.0
2,000.00
2,000.0
700.00
700.0
1,000.00
1,000.0
6,000.00
6,000.0
500.00
500.0
1 -19
1
LS
Furnish & Install Trench Safety System
800.00
800.0
5,000.00
5,000.0
5,000.00
5,000.0
10,000.00
10,000.0
11,700.00
11,700.0
1,000.00
1,000.0
1 -20
1
LS
Repair or Replace Damaged Sprinkler
Heads & Irrigation System Lines
4,950.00
4,950.0
2,000.00
2,000.0
3,000.00
3,000.0
200000
,.
2,000.0
7,200.00
7,200.0
16,000.00
16,000.0
1 -21
1
LS
Repair / Replace all Damaged Mailboxes
2,750.00
2,750.0
1,000.00
1,000.0
15,500.00
15,500.0
35,000.00
35,000.0
25,200.00
25,200.0
420000
,.
4,200.0
1 -22
1
LS
Fum & Install Bermuda or St. Augustine
10,000.00
10,000.0
10,000.00
10,000.0
180
180
150
150
Calendar Days
120
150
$ 398,655.00
$ 411,045.00
$ 439, 281.50
$ 446,156.40
$ 351,700.00
$ 363, 390.00
h�l
y
td
r
H
O
z
11
l J
O
'�I 1
x
r
r
H
�H
l
V
O
� 1
0
N
A
N
N
in
rn
oo
N
N
Q\
00
U
W
U
=
00
O
2
rr„
coo
r„
r,
cn
m
a
r-
-�
m
a
m
m
m
m
m
m
m
m
m
a
a
a
a
a
>>m
a
a
°3
:�
v
xr
cu CD
ITI
C
nm
mm
o
00
a
o
c
o
c
O 'S
VS
O
b
N
O
S
'S
ffQ
S
r
.
❑
.(•.
CD
CD
n
cn
fD
CD
O
O. c w i
v,
O�
w
Oj
.
ti
<
�,
fD
°
F-
R°
C7
CD
p
n
o
tea
0
0o
d
fo
d
d
w
CD w
n
CD
N
(_�
_
va
=
ao
9
y
fD
=
C
B
y
y
�
'•r
b
O
O,
O
c
cn
C6
CD
.0
CD
p
C
y �
i••�
00
y
`GT
n
"O
N '
fD , B
N
5
fD
O
b
N
oo
U
w
CD
G
`
b
Q•
CD
'C
f�D
v�ki
CbyD
CD
y �
(y9
N
O
O
O
b
O
N
N
N
N
w
N
N
N
o
b
'A
J
O
O
O
O
O
O
O
O
C>
O
O
O
O
O
O
O
O
00
cWi�
p
O
U
O
J
O
A
O
W
O
N
O
U
O
oo
O
N
A
O
O
m,
n
F+
F+
00
O
O
O
O
O
O
O
O
O
C
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
U
U
p
fD
C
O
O
O
O
O
O
O
O
O
O
O
O
O
Cl
O
O
O
O
O
O
O
O
C�
A
�
O
N
O
O
O
r-.
00
N
O
N
vi
A
O
A
N
00
O,
-,J
O
O
^•7
O
n
<D
O
CD
O
O
O
O
O
Cl
O
p
W
J
A
W
U
O
�O
O
O
p
b
O
O
O
C
O
O
O
O
A
O
O
O
O
Cl
O
O
O
O
O
O
O
O
O
O
O
O
cJi,
O
O
C
O
O
Cl
Cl
O
O
O
C
C
O
O
O
O
O
C
O
O
A
N
U
W
N
W
00
00
W
N
r-•
U
'O
,A
cJn
O
O
O
O
O
v
U
O
O
J
v
O
3
Cl
O
O
O
O
O
O
O
O
C
O
O
O
O
C
O
U
U
O
O
O
V
U
O
U
O
O
oo
N
A
O
O
O
m
eb
I-+
O
p
O
O
O
O
O
O
O
O
O
O
O
O
C
O
O
O
O
O
C
Cl
O
O
O
O
U
O
C
O
C
O
00
O
=
O
p
T
10
W
v
N
in
W
in
C
-4
O
N
•-
O
Q`
•-
W
oo
N
A
v
b
N
U
J
O
O
O
O
O
U
O
vii
O
O
N
O
J
J
A
O�
O
O
O
Cl
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
Cl
O
O
O
Cl
Cl
O
O
O
fD
O
O
O
O
O
O
O
O
Cl
_
Ul
U
V
U
01
U
W
ON
11
A
W
N
N
-,
W
N
b
V
W
N
- +
O
Cl
O
O
O
O
Cl
O
0
O
0
O
0
0o
0
O
0
O
0
O
0
O
0
O tQ
0
--1
v
p
p
0J0
W
C)
C:,
A•
O
C
O
0
o
0
o
0
p
0
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
0
U
0
U
o
.O
v
p
t
0
o
p
o
p
o
0
o
p
Cl
0
o
0
t1i
O
O
�
y
_
0
~
U
v
IJ
0
U
U
N
W
A
cn
p
Cl
00
N
U
A
`�
Q\
D\
W
�
V O
p
A
.•.
N
O
'O
O
O
O
O
O
O
Cl
O
A
O
O
O
00
O
O
00
th
O
O
O
N
N
W
o
f�
O
O
O
O
O
O
O
O
O
O
C
O
C
C
O
O
O
O
O
v
p
fD
O
O
C
O
O
C
O
O
O
N
U
W
Oo
N
vi
N
7
Q\
O
O
O
Cl
p
p
O
O
N
W
O
W
O
N
O
N
O
O
O
N
O
N
b
W
~
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
p
A
J
U
Do
O
n
fD
C
O
o
O
O
o
0
0
o
O
O
O
W
O
O
O
O
O
O
O
O
�
O�
fe
O
�
O
O
O
00
O
O
O
Cl
00
N
O
O
O
tJ
O
O
N
00
v
O
N
b
O
O
O
p
p
O
p
O
O
O
O
O
O
O
O
O
O
O
-j
W
Cl
O
O
f
fD
O
O
O
O
O
O
C
O
O
O
O
O
O
O
O
C
Cl
b19
N
N
to
O
N
N
N
=
w O
O
U
O
O
�O
v
c
O
O
O
c
b
O
�+
O
O
O
O
p
O
O
O
O
p
O
O
O
O
O
O
C
O
O
c
O
O
t
O
O
O
c
O
00
U
O
O
Cl
n
00
O
O
O
O
O
O
O
O
O
Cl
O
O
C
O
C
O
O
O
O
O
O
O
C :)
O
O
O
00
O
O
y
O
y
�
N
t
O
O
O
O
p
.N.
O
O
O
J
O
O
O
O
O
O
p
O
O
01
b
O
O
p
p
C
0
O
O
O
O
O
O
O
Cl
6
O
O
O
O
O
O
O
O
O
N
O
A
O
O
O
O
O
O
O
O
O
O
h�l
y
td
r
H
O
z
11
l J
O
'�I 1
x
r
r
H
�H
l
V
O
� 1
0
0
,
/ C
v �
e �
\ a
§ 3
U)
0
� / \
G \ R
§ �
/
0
? �o
� R �
e . _
0 7
cr
#
0 7
\ n § §
S 2
a
2»
V
r .r�
(A o 7)
0
2 ko
2 \2
\ 7 7f
S 7
/ g
p \
S
�
f 2
= E
0
k
R
�
\
j 0o
\ / §
o Ck
. o a
2
V) \(
k \ $7
C)
_ ®
\ 0
k
8 �
k
$
■ _
t �
�) »
q
�
�
n
f "Z
5F-
I
t/I I
Z
I F�j
1
c
N
s "
P 1 W ,.
n
c
z
D
m
0
v
z
D
z
v
c
9
00
m
Fvs
N
X
m
0
m
m
0
00
v
z
0
b
P.
Co
w
b
D
m
c
m
N
v
D
w
N
0
0
w
m
N
0
0
0�
z�
Z-0
c m
=Z
m
-i
m
= D
v
r0 C
N c
D�
�m
rn
�2�
r�
z0
m
Q
BID FORM
PROJECT IDENTIFICATION: Meadowcreek / Rolling Hills Water Line Project
WA 99 -01 in Coppell, Texas
BID OF Si+f Coac1e e, SnC. DATE / '� MALI L 003
(NAME OF FIRM)
THIS BID IS SUBMITTED TO: City of Coppell (hereinafter called OWNER)
c/o Purchasing Agent
255 Parkway Boulevard
P.O. Box 9478
Coppell, Texas 75019
CITY OF COPPELL BID NO: Q- 0403 -01
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an
agreement with OWNER in the form included in the Contract Documents to perform and
furnish all Work as specified or indicated in the Contract Documents for the Contract Price
and within the Contract Time indicated in this Bid and in accordance with the other terms
and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders
and Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days
after the day of Bid opening. BIDDER will sign and submit the Agreement with other
documents required by the Bidding Requirements within fifteen (15) days after the date of
OWNER'S Notice of Award.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:
(a) BIDDER has examined copies of all the Bidding Documents and of the following
Addenda (receipt of all which is hereby acknowledged):
No:
Date:
Rec'd:
1 -15 Bidding Documents
(b) BIDDER has familiarized itself with the nature and extent of the Contract
Documents, Work, site, locality, and all local conditions and Laws and Regulations
that in any manner may affect cost, progress, performance or furnishing of the Work.
(c) BIDDER has studied carefully all reports and drawings of subsurface conditions
contained in the contract documents and which have been used in preparation of the
contract documents. CONTRACTOR may rely upon the accuracy of the technical
data contained in such reports, but not upon nontechnical data, interpretations or
opinions contained therein or for the completeness thereof for CONTRACTOR's
purposes. Except as indicated in the immediately preceding sentence,
CONTRACTOR shall have full responsibility with respect to subsurface conditions
at site.
BIDDER has studied carefully all drawings of the physical conditions in or relating to
existing surface or subsurface structures on the site, which are contained in the
contract documents and which have been utilized in preparation of the contract
documents. CONTRACTOR may rely upon the accuracy of the technical data
contained in such drawings, but not for the completeness thereof for
CONTRACTOR's purposes. Except as indicated in the immediately preceding
sentence, CONTRACTOR shall have full responsibility with respect to physical
conditions in or relating to such structures.
(d) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining
and carefully studying) all such examinations, investigations, explorations, tests and
studies (in addition to or to supplement those referred to in (c) above) which pertain
to the subsurface or physical conditions at the site or otherwise may affect the cost,
progress, performance or furnishing of the Work as BIDDER considers necessary for
the performance or furnishing of the Work at the Contract Price, within the Contract
Time and in accordance with the other terms and conditions of the Contract
Documents; and no additional examinations, investigations, explorations, tests
reports or similar information or data are or will be required by BIDDER for such
purposes.
(e) BIDDER has reviewed and checked all information and data shown or indicated on
the Contract Documents with respect to existing Underground Facilities at or
contiguous to the site and assumes responsibility for the accurate location of said
Underground Facilities. No additional examinations, investigations, explorations,
tests, reports or similar information or data in respect of said Underground Facilities
are or will be required by BIDDER in order to perform and furnish the Work at the
Contract Price, within the Contract Time and in accordance with the other terms and
conditions of the Contract Documents.
(f) BIDDER has correlated the results of all such observations, examinations,
investigations, explorations, tests, reports and studies with the terms and conditions
of the Contract Documents.
1 -16 Bidding Documents
(g) BIDDER has given ENGINEER written notice of all conflicts, errors or
discrepancies that it has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to BIDDER.
(h) This bid is genuine and not made in the interest of or on behalf of any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement or
rules of any group, association, organization or corporation; BIDDER has not
directly or indirectly induced or solicited any other Bidder to submit a false or sham
Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain
from bidding; and BIDDER has not sought by collusion to obtain for itself any
ad+antage over any other Bidder or over OWNER.
(i) It is understood and agreed that the following quantities of work to be done at unit
prices are approximate only, and are intended principally to serve as a guide in
evaluating bids.
(j) It is understood and agreed that the quantities of work to be done at unit prices and
materials to be furnished may be increased or diminished as may be considered
necessary in the opinion of the OWNER to complete the work fully as planned and
contemplated, and that all quantities of work, whether increased or decreased, are to
be performed at the unit prices set forth, except as provided for in the Contract
Documents.
4. It is understood and agreed that all work under this contract will be completed within the bid
calendar days. Completion date will be established in the Notice to Proceed. It is understood
that time of completion will be a consideration in the award of the bid,
5. It is strongly recommended that each bidder visit the site prior to submitting a bid.
Construction constraints exist along the length of the project that could affect productivity.
6. BIDDER will complete the Work for the following price(s):
1-17 Bidding Documents
MEADOWCREEK / ROLLING HILLS
WATER LINE INSTALLATION
WA 99 -01
UNIT PRICE BID SCHEDULE
Item
Quantity
Unit
Description and Price in Words
Unit
Total
No.
Price
Price
I -1
1
LS
Mobilization & Demobilization
Complete in Place for cr 9
S ?�1c9�.ci1�� ,G�l Dollars
and tvo Cents
.,
b SDd D
per Lump Sum.
1 -2
5350
LF
Furnish and Install 8" Water Pipe
(Inclusive of intermediate taps for
testing and disinfection)
Complete in Place for
"7W" F-t6t4 f Dollars
and :5 Lk I AW T%1 Cents
�0
per Linear Foot.
I -3
1608
LF
Boring Required to
Install 8" Water Pipe
Complete in Place for
1 c 4 Dollars
and N Cents
g Z p °=
per Linear Foot.
00
30
I -4
12
EA
Furnish and Install Inline
8" Gate Valve (SDI 5)
Complete in Place for
5 &1*4 A*V 41,y Dollars
T 40
$ Lf C70 °
and rJ a Cents
per Each.
1-18 Bidding Documents
1 -19 Bidding Documents
MEADOWCREEK / ROLLING
HILLS
WATER LINE INSTALLATION
WA 99 -01
UNIT PRICE BID SCHEDULE
Item
No.
Quantity
Unit
Description and Price in Words
Unit
Total
I -5
12
EA
Furnish and Install
Price
Price
Fire Hydrant Assembly
Complete in Place for
1 "-*U-4 rnw / Il s
and ,nu Cents
Z 3K 4 - °
2 $ Z 00 0 . °
per Each.
I -6
8
EA
Remove and Salvage
Existing Fire Hydrants
Complete in Place for
D,NE AmwpA" Dollars
and Aiv Cents
/DO we
$� o e°
per Each.
1 -7
26
EA
Reconnect Existing
Short Services w /1" Copper
Complete in Place for
r�t,t�
el%4- Dollars
and nJo Cents
per Each.
1 -8
15
EA
Reconnect Existing
Long Services w/ 1" Copper
Complete in Place for
<.-! 164yW4 > Dollars
�000 07
and NO Cents
per Each.
1 -19 Bidding Documents
J -20 Bidding Documents
MEADOWCREEK / ROLLING HILLS
WATER LINE INSTALLATION
WA 99 -01
UNIT PRICE BID SCHEDULE
Item
Quantity
Unit
Description and Price in Words Unit
No.
Total
1 -9
12
EA
Price Price
Reconnect Existing
Long Services w/ 2" Copper
C m lete in Place for
�E
1.1HNV�,Ev
S Dollars °°
//7000-1
and N� Cents
p er Each.
I -10
1
EA
Connect Existing
6" C.I.P. Water Line to
Existing S" C.I.P. Water Line
(Inclusive of fittings, blocking,
tapping sleeve, valve and pipe) .3000 4—' 3000 v
Complete in Place for
W ]V Dollars
and _ &0 Cents
er Each.
I -1 1
2
EA
Six Inch Connection to Existing
6" C.I.P. Water Line (Inclusive of
fittings, blocking, pipe, tee &
valves)
Com r
lete in Place f ��D o_v CJt7 tL
7w ',�m1 �, X 1 1' O .1) 3.
Dollars
and �� Cents
er Each.
I -12
4
EA
Eight Inch Connection to Existing
6" C.I.P. Water Line (Inclusive of
fittings, blocking, pipe, tee &
valves)
Complete in Place for Z�`�0 a=' I /600
! 4"l 1� ALOA'- K" Dollars
and N o Cents
per Each.
J -20 Bidding Documents
1-21 Bidding Documents
MEADOWCREEK / ROLLING HILLS
WATER LINE INSTALLATION
WA 99 -01
UNIT PRICE BID SCHEDULE
Item
Quantity Unit Description and Price in Words
No.
Unit
Total
I -13
Price
2 EA Connect to Existing
Price
8" C.I.P. Water Line (Inclusive of
fittings, blocking, pipe, tee &
valves)
Com in Place for
T
' JK+� Y(rnev,X
y
n2 - 6 VA Dollars
and
^» Cents
per Each.
I -14
13 LF Remove and Replace Existing
Concrete Sidewalk
Complete in Place for
< < Dollars
and Cents 3 2
3 gO of
per Linear Foot.
I -1
2 EA Cut and Plug Existing
6" Cast Iron Pipe
Complete in Place for
S . '% .-1 /4 K-U Dollars !'7�JQ an
� vp 0.
and Cents
per Each.
I -16
1 LS
Abandon Existing 6"
C.I.P. Water Line
C %ete in Place for o
h 51K ,(4*, �-
4
— J'e ry Dollars
ZG
and N0 Cents
per Lump Sum.
1-21 Bidding Documents
1-22 Bidding Documents
MEADOWCREEK / ROLLING HILLS
WATER LINE INSTALLATION
WA 99 -01
UNIT PRICE BID SCHEDULE
Item
Quantity
Unit Description and Price in Words Unit
No.
Total
Price Price
1 -17
1
LS Furnish, Install, Maintain and
Remove Erosion Control Devices
w/ S WP3 Plan.
Complete in Place for
'fwj wo (Aw" Dollars / 6 ; 000
and rJo Cents
p er Lump Sum.
I -18
1
LS Furnish, Install, and Maintain
Traffic Control Devices
Com fete in Pla e f
P'� , !-f�c wDR�w
s� �y A t/ /— Dollars
"
(j 0
and /00
� Cents 1
per Lump Sum.
I -19
1
LS Furnish and Install Trench Safety
System (greater that 5' depth)
Complete in Place for
f ('c0; . ��tA VA4.) Dollars
and ND Cents �per
per Lump Sum.
1 -20
1
LS Repair or Replace all
Damaged Sprinkler Heads and
Irrigation System Lines
Complete in Plac for
X04 10,ni4r W10K)4eC.v
1 1 0 , Dollars y so �-� �o o�
and rvo Cents
per Lump Sum.
1-22 Bidding Documents
MEADOWCREEK / ROLLING HILLS
WATER LINE INSTALLATION
WA 99 -01
UNIT PRICE BID SCHEDULE
Item Quantity Unit Description and Price in Words
No. Unit Total
Price Price
I -21 1 LS Repair or Replace all
Damaged Mailboxes
Complete in Place for
Al - Al Dollars
and No Cents
per Lump Sum.
1 -22 1 LS Furnish and Install Bermuda or
St. Augustine Grass Solid Sod,
including Fertilizer and Watering,
Complete in Place for
Dollars (goo M /0 000
and Cents
per Lump Sum.
TOTAL BID ITEMS BID I -1 thru I -22
TANGIBLE PERSONAL PROPERTY COST
1 -23
s 3 !!�'/, 700 oo
Bidding Documents
BID SUMMARY
TOTAL PRICE
TOTAL BID ITEMS BID I - thru I - 22 $ S •�
CALENDAR
DAYS
1 20
In Words: i (�QE� /�+,��� �ifr� 6� �t,,,�� 5� ✓,�.� h`y.�i�,�ct'� .(3
r2r�.p nfo �►,,�� �G95�
6. BIDDER agrees that all Work awarded will be completed within
Contract time will commence to run as provided in the Contract Documents Calendar Days.
7. Communications concerning this Bid shall be addressed to the address of BIDDER indicated
on the applicable signature page.
8. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on
tangible personal property to be incorporated into the project. Said taxes are not included in
the Contract Price (see Instructions to Bidders).
9• The terms used in this Bid which are defined in the General Conditions of the Construction
Contract included as part of the Contract Documents have the meanings assigned to them in
the General Conditions.
The City of Coppell reserves the right to delete any portion of this project as it may deem necessary
to stay within the City's available funds. Should the City elect to delete any portion, the contract
quantities will be adjusted accordingly.
SUBMITTED ON /S 206
Signature:
1 -14 Bidding Documents
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and
are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all
commodities upon which prices are extended at the price offered, and upon the conditions contained
in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be ninety (90)
calendar days from the date of the bid opening.
STATE OF P S COUNTY OF I-SoLl)ct S BEFORE
ME, the undersigned authority, a Not Public in and for the State of
- on this day
personally appeared � o S . Lonq who after being by me
Name
duly sworn, did depose and say:
I, �eja^ S • am a duly authorized office /agent for
Name
_S. +e Cn,1c�r �'n and have been duly authorized to execute the
Name of Firm
foregoing on behalf of the said S +tG C'h u re te- Z,nC
Name of Firm
I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or
individual(s) engaged in the same line of business prior to the official opening of this bid. Further, I
certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly
concerned in any pool, agreement or combination thereof, to control the price of services/
commodities bid on, or to influence any individual(s) to bid or not to bid thereon."
Name and Address of Bidder: 33110 ' W - Z y t�C� �ud�
xCo 4 L raft P �TJ� Sn
Telephone: X97-2 ) 313 -0 by: 7Z e S. $ma
f :
Title: 'tJ��,s,a(,p,�.. Signature• i s �/ /
1
SUBSCRIBED AND aORN to before me by the above named �,e - S . R
on this the day of
Notary Public in and for the State of F b S
f!` JODIE C. COUCH 1 -25 Bidding Documents
MY COMMISSION EXPIRES
October 12, 2006
If BIDDER IS:
An Individual
By
doing business as
Business address
(Individual's Name)
Phone No.
A Partnership
B y
Business address
(Firm Name)
(General Partner)
Phone No.
A Corporation
By— S i +e c
(State of Incorporation)
(Name of person authorized to sign)
- y «S i d4g
(Corporate Seal)
Attest
Business address
Phone No.
A Joint Venture
B y
By m
(Nae) (Address)
(Name) (Address)
(Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to
the joint venture should be in the manner indicated above.)
(Corporation Name)
(Seal)
26 Bidding Documents