Loading...
ST8402-CS 881122GINN, INC. CONS; ENGINEERS November 22, 1988 Mr. Russell R. Doyle, P.E. City Engineer city of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road; and from Sandy Lake Road to Denton Creek. Dear Mr. Doyle: This letter is a follow-up to my November 16, 1988 letter and your November 18, 1988 response concerning the proposed Change Order No. 1 to both projects for the replacement of Lime with Cement for subgrade stabilization. I am enclosing a copy of John H. Haynes and Associates, Inc. Laboratory Report No. 18, dated November 4, 1988, which states the conditions under which the Cement Stabilization will be acceptable on this project. In our discussions with the Contractor, L. H. Lacy Co., they have agreed to abide by the John H. Haynes and Associates Inc. recommendations and to apply the additional cement required near Station 91+00 to reduce the Plasticity Index to 12 or less, at no additional cost to that proposed for 5% treatment. Since this item has been reviewed and approved by our Geotechnical Engineer, and we have previously informed you of the potential cost savings of approximately $ 14,072.10 associated therewith, we feel that it is in the best interest of the City of Coppell to approve the proposed Change Orders and allow the Contractor to proceed at once with his subgrade preparation. Please call me if you have any questions. sincerely, John C. Karlsruher, P.E. Project Engineer enclosures cc: Alan D. Ratliff, City Manager Frank Trando, Deputy city Manager H. Wayne Ginn, P.E. David M. Snyder, P.E., L. H. Lacy Co. Randy Fleming J378/379 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900