Loading...
ST1002-CS111114 Page 1 of 2 Keith Marvin - RE: Old Town Coppell From:   Keith Marvin     To:Poteet, Chris Date:   11/14/2011 4:15 PM Subject:   RE: Old Town Coppell     CC:Hatley, Tricia;  Prendergast, Dan   Chris,   There are conversations taking place between the developer and Verizon, and perhaps even between Verizon and the contractor that may impact how this is done.  I'll let you all know when I have more information.   Keith   Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Chris Poteet <cjp@freese.com> 11/14/2011 3:43 PM >>> Keith, I’m sorry for the confusion.  I was reversed on the alley conduit behind Travis.   I gave the correct direction to the utilities; I just reversed it in my previous email to you.   We need everyone on the South side of that alley.   Regards, Chris   Chris Poteet Freese & Nichols, Inc.   From: Chris Poteet Sent: Monday, November 14, 2011 3:40 PM To: 'Keith Marvin' (kmarvin@coppelltx.gov) Cc: Dan Prendergast Subject: Old Town Coppell   Keith, just to keep you in the loop….   We notified each of the utilities (Verizon and Atmos) that we had reviewed their conduit plans and asked them to revise to accommodate the ONCOR plan in as many areas as possible.   The primary area was the alley to the South of Travis St (behind the 12 residences).  They had both shown their conduits on the South side of the alley but Oncor was installing on the North side of the alley.  We need all conduits on the North side.   I marked up their differences on their plans and distributed. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4EC13E9ECity_...4/19/2012 Page 2 of 2   I will let you know if we hear back from them.   Have they contacted you on any of their conduit construction plans?   Regards,   Chris   PS.  Atmos (George Long) sent me his plan on 24 Oct.  He stated that he had sent this revised plan to Greg Yancey in August.  It still only reflected the 38 vs. the current 42 townhome plan.  So I’m not sure how accurate their plan is.   ® Chris Poteet, LEED AP Freese & Nichols, Inc. 1701 N. Market St., Suite 500 Dallas, TX 75202 214-217-2210 (office) 214-709-7868 (cell) cjp@freese.com     Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4EC13E9ECity_...4/19/2012 Page 1 of 1 Keith Marvin - Old Town Coppell From:   Chris Poteet <cjp@freese.com> To:   "'Keith Marvin' (kmarvin@coppelltx.gov)" <kmarvin@coppelltx.gov> Date:   11/14/2011 3:42 PM Subject:   Old Town Coppell CC:   Dan Prendergast <drp@freese.com>   Keith, just to keep you in the loop….   We notified each of the utilities (Verizon and Atmos) that we had reviewed their conduit plans and asked them to revise to accommodate the ONCOR plan in as many areas as possible.   The primary area was the alley to the South of Travis St (behind the 12 residences).  They had both shown their conduits on the South side of the alley but Oncor was installing on the North side of the alley.  We need all conduits on the North side.   I marked up their differences on their plans and distributed.   I will let you know if we hear back from them.   Have they contacted you on any of their conduit construction plans?   Regards,   Chris   PS.  Atmos (George Long) sent me his plan on 24 Oct.  He stated that he had sent this revised plan to Greg Yancey in August.  It still only reflected the 38 vs. the current 42 townhome plan.  So I’m not sure how accurate their plan is.   ® Chris Poteet, LEED AP Freese & Nichols, Inc. 1701 N. Market St., Suite 500 Dallas, TX 75202 214-217-2210 (office) 214-709-7868 (cell) cjp@freese.com     Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4EC136F1City_...12/8/2011