Loading...
ST1002-CS111017 Page 1 of 4 Keith Marvin - Main Street Coppell - TELCO Infrastructure From:   "Greg Yancey" <gregyancey@verizon.net> To:   "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date:   10/17/2011 6:06 PM Subject:   Main Street Coppell - TELCO Infrastructure Attachments:   A-001 SITE PLAN _ Layout 031711 FINAL- P&H REDLINES 10-17-2011.pdf   If you have time to talk about this after the meeting, that’s great. Maybe this is a solution the City can live with.   I could not get this to print with his overlay.   Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Monday, October 17, 2011 5:13 PM To: 'Greg Yancey' Cc: David Alpha; Allen Smith; Winkles, Sam (Sam); Box, Darin (Darin) Subject: RE: Main Street Coppell - TELCO Infrastructure   Greg, I have completed a DRAFT plan for the 1.5” Pipe & Hand Holes that Verizon would need placed, as well as the street Crossings you would need to place, to serve this site.   I thought maybe this may be of help, at your meeting tomorrow with the City of Coppell…?   We need to compare this layout with Atmos, and Oncor, redlines to see where we may need to make changes for the Joint Trenching effort…     Have a Good One!   Best Regards,   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Monday, October 17, 2011 4:24 PM To: 'Greg Yancey' Cc: David Alpha Subject: RE: Main Street Coppell - TELCO Infrastructure file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012 Page 2 of 4   Thanks Greg, It was my pleasure speaking with you today.  I will call Verizon Section Manager and work that end of the deal.  I do not think this should be an issue as long as we all understand that you will place and pay for all street crossings and be billed for any changes to the facilities required by you, or your subs, once the Verizon facilitates have been placed.   Please, let me know who the JTA will be and how to best contact them, so I can send them a Joint Trench Agreement (JTA) for their review and a proposal to do the work for Verizon.   Have a Great Evening!   Go-RANGERS!     Best Regards,   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: Greg Yancey [mailto:gregyancey@verizon.net] Sent: Monday, October 17, 2011 4:16 PM To: 'David Alpha' Cc: Keith Marvin Subject: RE: Main Street Coppell - TELCO Infrastructure   Hi David:   Thanks again for all of your time today. Here is the correct site plan and plat.   Where you see the labels “dedicated alley” there is a five-foot joint utility easement planned.   I’ll talk to Keith Marvin at the City about the timing on that, it sounds like we need to get the easements platted sooner.   Thanks again,   Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net From: David Alpha [mailto:dalpha@wellscoinc.com] Sent: Monday, October 17, 2011 1:47 PM To: 'Greg Yancey'; cjp@freese.com; kmarvin@coppelltx.gov Cc: David Alpha; Box, Darin (Darin); Winkles, Sam (Sam); Allen Smith Subject: RE: Main Street Coppell - TELCO Infrastructure   Greg, Good afternoon. Based on information provided to me, the developers were to place the utility file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012 Page 3 of 4 infrastructure within the development, per the city, which was to include piping for Verizon’s FiOS facilities, and for Oncor power, to be placed to each of the buildings, at this site.     Therefore, If the developer is not going to place the entrance pipes, etc. for Verizon facilities, as mandated by the city, then Verizon may not be able to serve this site with any type of communications services.   Please, advise as to when and why the decision was made, to not place these facilities, and by whom…   I look forward to working with you, the owners and the city in resolving this outstanding issue.   Best Regards,   David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com   From: Patrick Gray [mailto:pgray@wellscoinc.com] Sent: Tuesday, October 11, 2011 9:51 AM To: Greg Yancey; dalpha@wellscoinc.com Subject: Re: Main Street Coppell   David, FYI... Re; Old Town Coppell Pat Gray OSP Planner Metro North Area Wellsco Inc / VERIZON (214)770-8352 pgray@wellscoinc.com -----Original Message----- From: "Greg Yancey" <gregyancey@verizon.net> Sent 10/11/2011 8:42:29 AM To: pgray@wellscoinc.com Subject: Main Street Coppell Hi Pat:   I’m following up about this project to see what we need to do to serve it since we are not able to provide a conduit for Verizon at our expense.   If David Alpha is our new point of contact, could you forward this to him so we can determine our options?   Thanks,   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012 Page 4 of 4 Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012 (12/9/2011) Ken Griffin - Fwd: RE: Main Street Coppell - TELCO InfrastructurePage 1 From: Keith Marvin To: Hurley, Mindi CC: Griffin, Ken; Phillips, Clay Date: 10/17/2011 1:59 PM Subject: Fwd: RE: Main Street Coppell - TELCO Infrastructure Fyi... Should we step into this and set up a meeting with Verizon and Time Warner Cable? Keith >>> "David Alpha" <dalpha@wellscoinc.com> 10/17/2011 1:47 PM >>> Greg, Good afternoon. Based on information provided to me, the developers were to place the utility infrastructure within the development, per the city, which was to include piping for Verizon's FiOS facilities, and for Oncor power, to be placed to each of the buildings, at this site. Therefore, If the developer is not going to place the entrance pipes, etc. for Verizon facilities, as mandated by the city, then Verizon may not be able to serve this site with any type of communications services. Please, advise as to when and why the decision was made, to not place these facilities, and by whom… I look forward to working with you, the owners and the city in resolving this outstanding issue. Best Regards, David B. Alpha OSP Network Planner Infotech / Verizon - Metro 1104 Quail Run RD. Southlake, TX 76092-3112 (972) 849-4096 dalpha@wellscoinc.com From: Patrick Gray [mailto:pgray@wellscoinc.com] Sent: Tuesday, October 11, 2011 9:51 AM To: Greg Yancey; dalpha@wellscoinc.com Subject: Re: Main Street Coppell (12/9/2011) Ken Griffin - Fwd: RE: Main Street Coppell - TELCO InfrastructurePage 2 David, FYI... Re; Old Town Coppell Pat Gray OSP Planner Metro North Area Wellsco Inc / VERIZON (214)770-8352 pgray@wellscoinc.com -----Original Message----- From: "Greg Yancey" <gregyancey@verizon.net> Sent 10/11/2011 8:42:29 AM To: pgray@wellscoinc.com Subject: Main Street Coppell Hi Pat: I'm following up about this project to see what we need to do to serve it since we are not able to provide a conduit for Verizon at our expense. If David Alpha is our new point of contact, could you forward this to him so we can determine our options? Thanks, Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net 9P.S. P 2 40'-0" RESTAURANT 10'-103/4"45'-0" S 2 PARKING(40) SERVICE 14P.S. LT-1 90'-0"75'-0"70'-0" BLK-D S 5 S 4S 3 S 6 SERVICESERVICESERVICE SERVICE LT-1LT-1LT-1 BLK-DBLK-DBLK-D LT-1 40'-0"15'-11/4" BLK-D 10P.S. S 1 14P.S. SERVICE RETAILSERVICES LT-1 BLK-D 45'-0" 14P.S. 34'-0"95'-0"70'-0"60'-0"95'-0" R 5 18'-0"25'-0"18'-0"P 1 RETAIL R 4R 3R 2R 1 RESTAURANT LT-1 RETAILRETAILRETAILRETAIL 10P.S. PARKING(40) BLK-D LT-1 LT-1LT-1 LT-1 79'-0" BLK-D BLK-DBLK-D BLK-D 9P.S. FUTURE EXISTING W.MAINSTREET PUBLICUSE BUSINESS GRASS 20PARKINGSPACES PAVERS OR C12 C11C13 10DOUBLEPARKINGSPACES COTTAGE GRASS COTTAGE COTTAGE PAVERS LT-1LT-1LT-1 PUBLICRR, BLK-ABLK-ABLK-A JANITOR, FARMER'SMARKET WASTE F 1 STORAGE RESTAURANT 56'-93/4"51'-10"53'-61/2" LT-1 BLK-E GRASSGRASS PAVERSPAVERS PATIO MAINSTREET INTERACTIVE PAVILION FOUNTAIN MAINSTREET 10'-0"20'-0"95'-0" PATIO PH LT-2 BLK-G 1S PLAY PH AREA LT-2 ENTRY 88'-1/4"15'-0"56'-103/4"44'-0"55'-21/4"71'-103/4"38'-3/4" F 2 BLK-G 2S WASTE FEATURE RESTAURANT C 7 C 6 COTTAGE LT-1 C 2C 1 PH LT-2 BLK-E COTTAGE LT-1 COTTAGE BLK-G 3S LT-1LT-1 110'-0" BLK. C LT-1BLK. BBLK. B BLK. C PH LT-2 4S BLK-G C 8 COTTAGE E.MAINSTREET PH LT-1 LT-1 LT-2 BLK. C BLK. C C 3 C 4 BLK-G 5S C 5 COTTAGE COTTAGE COTTAGE LT-1 LT-1 PH LT-2 BLK. B BLK. B C 9 BLK-G 6S COTTAGE 24'-11"55'-83/4"45'-41/4"75'-21/4"87'-10" LT-1 15'-1/2" PH BLK. C LT-2 7S BLK-G PH PHPHPHPHPHPHPHPHPHPHPHPHPHPH PH 11W 16W15W14W13W12W10W9W8W7W6W5W4W3W2W1W C10 BURNETSTREET PH LT-2 COTTAGE BLK-G 8S LT-1 BLK. C LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1 BLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-F PH LT-2 BLK-G 9S 95'-4" 35'-91/2"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"33'-31/2"35'-11" DEDICATEDALLEY PH LT-2 10S BLK-G EXISTINGBUILDINGS PH LT-2 (NOTINSCALE, 11S BLK-G VERIFYLOCATION) PHPH PHPHPHPHPHPHPHPHPHPHPH PHPHPH 13E12E 11E10E9E8E7E6E5E4E3E2E1E 25'-0"18'-0" 16E15E14E PH LT-2 BLK-G 12S LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1 BLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-F 5'-1"79'-11"10'-0" 24'-11" SWITCHGEAR REVISIONS POLES DATE SOUTHCOPPELLROAD CONCEPTUALSITEPLAN A SCALE:1"=50' NOTES: Date: 03-17-2011 1.) TREEWELLARE5'X9' 2.)ALLPARKINGSPACESARE9'X18' Scale: Drawn: Job: SheetNumber: A-001 SHEET 1