ST1002-CS111017
Page 1 of 4
Keith Marvin - Main Street Coppell - TELCO Infrastructure
From: "Greg Yancey" <gregyancey@verizon.net>
To: "Keith Marvin" <kmarvin@ci.coppell.tx.us>
Date: 10/17/2011 6:06 PM
Subject: Main Street Coppell - TELCO Infrastructure
Attachments: A-001 SITE PLAN _ Layout 031711 FINAL- P&H REDLINES 10-17-2011.pdf
If you have time to talk about this after the meeting, that’s great. Maybe this is a solution the City can live with.
I could not get this to print with his overlay.
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
From: David Alpha [mailto:dalpha@wellscoinc.com]
Sent: Monday, October 17, 2011 5:13 PM
To: 'Greg Yancey'
Cc: David Alpha; Allen Smith; Winkles, Sam (Sam); Box, Darin (Darin)
Subject: RE: Main Street Coppell - TELCO Infrastructure
Greg, I have completed a DRAFT plan for the 1.5” Pipe & Hand Holes that Verizon would need placed, as well as
the street Crossings you would need to place, to serve this site.
I thought maybe this may be of help, at your meeting tomorrow with the City of Coppell…?
We need to compare this layout with Atmos, and Oncor, redlines to see where we may need to make changes
for the Joint Trenching effort…
Have a Good One!
Best Regards,
David B. Alpha
OSP Network Planner
Infotech / Verizon - Metro
1104 Quail Run RD.
Southlake, TX 76092-3112
(972) 849-4096
dalpha@wellscoinc.com
From: David Alpha [mailto:dalpha@wellscoinc.com]
Sent: Monday, October 17, 2011 4:24 PM
To: 'Greg Yancey'
Cc: David Alpha
Subject: RE: Main Street Coppell - TELCO Infrastructure
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012
Page 2 of 4
Thanks Greg, It was my pleasure speaking with you today. I will call Verizon Section Manager and work that end
of the deal. I do not think this should be an issue as long as we all understand that you will place and pay for all
street crossings and be billed for any changes to the facilities required by you, or your subs, once the Verizon
facilitates have been placed.
Please, let me know who the JTA will be and how to best contact them, so I can send them a Joint Trench
Agreement (JTA) for their review and a proposal to do the work for Verizon.
Have a Great Evening!
Go-RANGERS!
Best Regards,
David B. Alpha
OSP Network Planner
Infotech / Verizon - Metro
1104 Quail Run RD.
Southlake, TX 76092-3112
(972) 849-4096
dalpha@wellscoinc.com
From: Greg Yancey [mailto:gregyancey@verizon.net]
Sent: Monday, October 17, 2011 4:16 PM
To: 'David Alpha'
Cc: Keith Marvin
Subject: RE: Main Street Coppell - TELCO Infrastructure
Hi David:
Thanks again for all of your time today. Here is the correct site plan and plat.
Where you see the labels “dedicated alley” there is a five-foot joint utility easement planned.
I’ll talk to Keith Marvin at the City about the timing on that, it sounds like we need to get the easements platted
sooner.
Thanks again,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
From: David Alpha [mailto:dalpha@wellscoinc.com]
Sent: Monday, October 17, 2011 1:47 PM
To: 'Greg Yancey'; cjp@freese.com; kmarvin@coppelltx.gov
Cc: David Alpha; Box, Darin (Darin); Winkles, Sam (Sam); Allen Smith
Subject: RE: Main Street Coppell - TELCO Infrastructure
Greg, Good afternoon. Based on information provided to me, the developers were to place the utility
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012
Page 3 of 4
infrastructure within the development, per the city, which was to include piping for Verizon’s FiOS facilities, and
for Oncor power, to be placed to each of the buildings, at this site.
Therefore, If the developer is not going to place the entrance pipes, etc. for Verizon facilities, as mandated by
the city, then Verizon may not be able to serve this site with any type of communications services.
Please, advise as to when and why the decision was made, to not place these facilities, and by whom…
I look forward to working with you, the owners and the city in resolving this outstanding issue.
Best Regards,
David B. Alpha
OSP Network Planner
Infotech / Verizon - Metro
1104 Quail Run RD.
Southlake, TX 76092-3112
(972) 849-4096
dalpha@wellscoinc.com
From: Patrick Gray [mailto:pgray@wellscoinc.com]
Sent: Tuesday, October 11, 2011 9:51 AM
To: Greg Yancey; dalpha@wellscoinc.com
Subject: Re: Main Street Coppell
David,
FYI... Re; Old Town Coppell
Pat Gray
OSP Planner
Metro North Area
Wellsco Inc / VERIZON
(214)770-8352
pgray@wellscoinc.com
-----Original Message-----
From: "Greg Yancey" <gregyancey@verizon.net>
Sent 10/11/2011 8:42:29 AM
To: pgray@wellscoinc.com
Subject: Main Street Coppell
Hi Pat:
I’m following up about this project to see what we need to do to serve it since we are not able to provide a conduit
for Verizon at our expense.
If David Alpha is our new point of contact, could you forward this to him so we can determine our options?
Thanks,
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012
Page 4 of 4
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4E9C6EC3City_...4/18/2012
(12/9/2011) Ken Griffin - Fwd: RE: Main Street Coppell - TELCO InfrastructurePage 1
From:
Keith Marvin
To:
Hurley, Mindi
CC:
Griffin, Ken; Phillips, Clay
Date:
10/17/2011 1:59 PM
Subject:
Fwd: RE: Main Street Coppell - TELCO Infrastructure
Fyi... Should we step into this and set up a meeting with Verizon and Time Warner Cable?
Keith
>>> "David Alpha" <dalpha@wellscoinc.com> 10/17/2011 1:47 PM >>>
Greg, Good afternoon. Based on information provided to me, the developers were to place the utility
infrastructure within the development, per the city, which was to include piping for Verizon's FiOS
facilities, and for Oncor power, to be placed to each of the buildings, at this site.
Therefore, If the developer is not going to place the entrance pipes, etc. for Verizon facilities, as
mandated by the city, then Verizon may not be able to serve this site with any type of communications
services.
Please, advise as to when and why the decision was made, to not place these facilities, and by whom…
I look forward to working with you, the owners and the city in resolving this outstanding issue.
Best Regards,
David B. Alpha
OSP Network Planner
Infotech / Verizon - Metro
1104 Quail Run RD.
Southlake, TX 76092-3112
(972) 849-4096
dalpha@wellscoinc.com
From: Patrick Gray [mailto:pgray@wellscoinc.com]
Sent: Tuesday, October 11, 2011 9:51 AM
To: Greg Yancey; dalpha@wellscoinc.com
Subject: Re: Main Street Coppell
(12/9/2011) Ken Griffin - Fwd: RE: Main Street Coppell - TELCO InfrastructurePage 2
David,
FYI... Re; Old Town Coppell
Pat Gray
OSP Planner
Metro North Area
Wellsco Inc / VERIZON
(214)770-8352
pgray@wellscoinc.com
-----Original Message-----
From: "Greg Yancey" <gregyancey@verizon.net>
Sent 10/11/2011 8:42:29 AM
To: pgray@wellscoinc.com
Subject: Main Street Coppell
Hi Pat:
I'm following up about this project to see what we need to do to serve it since we are not able to provide a
conduit for Verizon at our expense.
If David Alpha is our new point of contact, could you forward this to him so we can determine our options?
Thanks,
Gregory K. Yancey
Provident Company
(214) 215-9400 v
(214) 276-1709 f
gregyancey@verizon.net
9P.S.
P 2
40'-0"
RESTAURANT
10'-103/4"45'-0"
S 2
PARKING(40)
SERVICE
14P.S.
LT-1
90'-0"75'-0"70'-0"
BLK-D
S 5
S 4S 3
S 6
SERVICESERVICESERVICE
SERVICE
LT-1LT-1LT-1
BLK-DBLK-DBLK-D
LT-1
40'-0"15'-11/4"
BLK-D
10P.S.
S 1
14P.S.
SERVICE
RETAILSERVICES
LT-1
BLK-D
45'-0"
14P.S.
34'-0"95'-0"70'-0"60'-0"95'-0"
R 5
18'-0"25'-0"18'-0"P 1
RETAIL
R 4R 3R 2R 1
RESTAURANT
LT-1
RETAILRETAILRETAILRETAIL
10P.S.
PARKING(40)
BLK-D
LT-1
LT-1LT-1
LT-1
79'-0"
BLK-D
BLK-DBLK-D
BLK-D
9P.S.
FUTURE
EXISTING
W.MAINSTREET
PUBLICUSE
BUSINESS
GRASS
20PARKINGSPACES
PAVERS
OR
C12
C11C13
10DOUBLEPARKINGSPACES
COTTAGE
GRASS
COTTAGE
COTTAGE
PAVERS
LT-1LT-1LT-1
PUBLICRR,
BLK-ABLK-ABLK-A
JANITOR,
FARMER'SMARKET
WASTE
F 1
STORAGE
RESTAURANT
56'-93/4"51'-10"53'-61/2"
LT-1
BLK-E
GRASSGRASS
PAVERSPAVERS
PATIO
MAINSTREET
INTERACTIVE
PAVILION
FOUNTAIN
MAINSTREET
10'-0"20'-0"95'-0"
PATIO
PH
LT-2
BLK-G
1S
PLAY
PH
AREA
LT-2
ENTRY
88'-1/4"15'-0"56'-103/4"44'-0"55'-21/4"71'-103/4"38'-3/4"
F 2
BLK-G
2S
WASTE
FEATURE
RESTAURANT
C 7
C 6
COTTAGE
LT-1
C 2C 1
PH
LT-2
BLK-E
COTTAGE
LT-1
COTTAGE
BLK-G
3S
LT-1LT-1
110'-0"
BLK. C
LT-1BLK. BBLK. B
BLK. C
PH
LT-2
4S
BLK-G
C 8
COTTAGE
E.MAINSTREET
PH
LT-1
LT-1
LT-2
BLK. C
BLK. C C 3
C 4
BLK-G
5S
C 5
COTTAGE
COTTAGE
COTTAGE
LT-1
LT-1
PH
LT-2
BLK. B
BLK. B
C 9
BLK-G
6S
COTTAGE
24'-11"55'-83/4"45'-41/4"75'-21/4"87'-10"
LT-1
15'-1/2"
PH
BLK. C
LT-2
7S
BLK-G
PH
PHPHPHPHPHPHPHPHPHPHPHPHPHPH
PH
11W
16W15W14W13W12W10W9W8W7W6W5W4W3W2W1W
C10
BURNETSTREET
PH
LT-2
COTTAGE
BLK-G
8S
LT-1
BLK. C
LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1
BLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-F
PH
LT-2
BLK-G
9S
95'-4"
35'-91/2"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"32'-0"33'-31/2"35'-11"
DEDICATEDALLEY
PH
LT-2
10S
BLK-G
EXISTINGBUILDINGS
PH
LT-2
(NOTINSCALE,
11S
BLK-G
VERIFYLOCATION)
PHPH
PHPHPHPHPHPHPHPHPHPHPH
PHPHPH
13E12E
11E10E9E8E7E6E5E4E3E2E1E
25'-0"18'-0"
16E15E14E
PH
LT-2
BLK-G
12S
LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1LT-1
BLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-FBLK-F
5'-1"79'-11"10'-0"
24'-11"
SWITCHGEAR
REVISIONS
POLES
DATE
SOUTHCOPPELLROAD
CONCEPTUALSITEPLAN
A
SCALE:1"=50'
NOTES:
Date:
03-17-2011
1.) TREEWELLARE5'X9'
2.)ALLPARKINGSPACESARE9'X18'
Scale:
Drawn:
Job:
SheetNumber:
A-001