Loading...
ST8402-CS 881122 (2)UNIVEST DEVELOPMENT COMPANY November 22, 1988 Mr. Jerr~ Parche' Jerry Parche' Consulting Engineers 320Westway Place Suite 501 Arlington, Texas 76018 Re: Denton Tap Median Breaks Dear Jerry: In response to your letter of November 9th, I have confirmed that the Parks of Coppell Joint Venture approves the following stations for center lines of proposed median openings: The first opening south of Parkway Blvd. - 186+98 The second opening south of Parkway Blvd. - 182+44 Mills Lane Intersection - 178+15 * *Or whatever station lines up with the existing center line of the Mills Lane intersection. Regarding your c~ent about 75 foot wide openings versus 60 foot wide openings, PCJV is willing to accept the standard width median opening required by the City of Coppell. You are correct that PCJV does not desire to have left hand turn lanes constructed at this time to serve south bound traffic. As ir~icated in your letter of November 8th, I will assume that you will furnish sketches of these agreed median opening locations to the City of Coppell. Please send us a copy also. Yours very truly, PARKS OF COPPELL JOINT VENTURE Michael R. Allen ~aA/lz cc: Jay Chester Russell Doyle Charles Hodges UNIVEST FINANCIAL CORP. · ALLEN EQUITIES INC. 12770 COlT RD. · SUITE 1215 · DALLAS, TEXAS 75251 · 214/233-5771