Loading...
Bethel School/Harris-CS 921204 ' PO Box 478 ' ..... '/ /__~___._--' ~_ L__., ~ ,:/ ~' ~ Coppel!, Texas 75019 /'~'~'~? /~ The C~ty 'W~t~ A Beautiful FutL~re 214-462-0022 December 4, 1992 Mr. Mike Daniel, P.E. Nathan D. Maier Engineers 8800 N. Central Expressway, Suite 300 Dallas, TX 75231 RE: Bethel School Road/Harris Street Dear Mike: Listed below are items that must be addressed prior to final acceptance of the referenced project: 1) Complete all items on the punch lists generated from walk throughs by the utility and street departments. 2) Install fence, gate, and 'private drive' signs at the north and south ends of the abandoned section of Bethel School Road. 3) Install pavement markings including raised markings south bound on Harris through pavement width transition section and reflectorized material on nose of median at the entrance to Chautauqua Addition. 4) Renew water service that was damaged during street construction at 212 Bethel School Road. 5) Repair damaged sprinkler systems and re-sod disturbed areas adjacent to existing houses on Bethel School and Harris Streets. 6)Submit the necessary maintenance bonds and as-built plans. This letter is intended to assist you in acquiring final acceptance on this project, and in no way relieves the developer or contractors of their responsibilities under the terms of the agreement. I hope this information is helpful and if I can be of further assistance, please feel free to contact me at (214) 393-1016 at your earliest convenience. Sincerely, Construction Inspector cc: Tim House, Matthews Southwest Howard Pafford, Water Superintendent Kenneth M. Griffin, P.E., City Engineer Rey Gonzales, Street Superintendent