Loading...
SW0801-CS110128 Page 1 of 1 George Marshall - RE: Denton Tap Sidewalk Improvements Cyl. Testing From:   "Perry Kakara" <PKakara@aggengr.com> To:   "George Marshall" <gmarshall@coppelltx.gov> Date:   1/28/2011 10:43 AM Subject:   RE: Denton Tap Sidewalk Improvements Cyl. Testing   That is correct, we would have a total of 6 cyls. If you decide not to test the 7 day, please give me a minimum 1 or 3 day strength requirement. 75% of the required 28 day strength is typical.     From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Friday, January 28, 2011 10:32 AM To: Perry Kakara Subject: Re: Denton Tap Sidewalk Improvements Cyl. Testing   I would agree with you.  I was talking with Larry about the 1 day or 3 day breaks in addition to the 7 and 28 day breaks.  If we are requesting 1 or 3 day breaks and they come back above the 28 day spec then I don't think we would need to perform 7 day breaks but we would still need 28 day breaks.    As it is we are opening driveways prior to receiving the results from you anyway.  If we are asking for 1 or 3 day breaks I would assume you are collecting samples for (1 or 3), 7 and 28 day.   Thank You, George   George Marshall, PE City of Coppell Engineering 972-304-3562 >>> "Perry Kakara" <PKakara@aggengr.com> 1/28/2011 10:08 AM >>> George,   Larry has asked me to explain the cost savings if cylinders are not tested. The cost of cyl. testing covers the material (cyl mold) lab tech to strip, mark, store, test and report the test results. The cost of cyls. on this project is $14.00. We can charge $10.00 for cyls. not tested. I would recommend that we test 28 day cyls. regardless of early test results because the project is based on 28 day results. Please let me know if you have any other questions.      Perry Kakara Senior Project Manager Alliance Geotechnical Group 3228 Halifax Street Dallas, Texas 75247 972-444-8889 office 972-603-5432 mobile pkakara@aggengr.com   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D429DC4City...12/14/2011